IP Library Granted Patent US 12,030,246
Granted Patent B2
US 12,030,246 · App. 17/661,500 · Granted Jul 9, 2024

Modular additive manufacturing system and related methods for continuous part production

Inventor: Samuel Côté (Québec, CA)
Assignee: 9328-8082 QUÉBEC INC.
B29C64/182B22F12/224B22F12/226B22F12/44B22F12/49B22F12/84B22F12/86B22F12/90B29C64/232B29C64/236B29C64/241B29C64/245B29C64/268B29C64/277B29C64/393B33Y40/00B22F12/30B22F12/52B33Y10/00B33Y30/00B33Y50/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,030,246
App. No.
17/661,500
Granted
Jul 9, 2024
Kind
B2
Abstract

Modular additive manufacturing systems, related methods for simultaneously building three-dimensional parts in successively bonded layers, and related computer readable storage medium. A plurality of build assemblies is laid out along at least one direction of a manufacturing path defining a loop, and at least one build assembly is functioning to build a three-dimensional part from build material according to build instructions. A guidable module is guided via a guiding assembly along the manufacturing path to repeatedly perform at least one step necessary to build the three-dimensional part on each functioning build assembly.

Claims (21)

1. A method for simultaneously building three-dimensional parts in successively bonded layers based at least on build instructions, the method comprising the steps of:

providing a plurality of build assemblies to define a manufacturing path;

enabling at least one build assembly to function according to the build instructions,

wherein the at least one functioning build assembly is triggerable to perform:

a layering operation including depositing a top layer of build material in response to the build instructions, the top layer of build material being unbonded; or

a bonding operation including bonding the top layer of build material to form a bonded layer, the bonding operation being performed after the layering operation is completed;

displacing at least one guidable module along the manufacturing path and at a distance with respect to the plurality of build assemblies, wherein the at least one guidable module is triggerable according to the build instructions to perform:

the layering operation including depositing the top layer of build material in response to the build instructions, when the bonding operation is performed by the at least one functioning build assembly; or

the bonding operation including bonding the top layer of build material to form the bonded layer, when the layering operation is performed by the at least one functioning build assembly;

wherein depositing and bonding of the top layer of build material are performed periodically by the at least one functioning build assembly or the at least one guidable module until completion of a three-dimensional part;

wherein the bonding of the top layer of build material from one functioning build assembly or guidable module is performed simultaneously to the deposition of the top layer of build material on remaining build assemblies or guidable module; and,

wherein the at least one functioning build assembly is capable of being configured to perform the layering operation and capable of being configured to perform the bonding operation.

2. The method of claim 1 , comprising adapting a speed profile and position of the at least one guidable module to the manufacturing path and at least one of the layering operation or bonding operation on each functioning build assembly.

3. The method of claim 1 , wherein the at least one guidable module is a bonding module, and the bonding of the top layer of build material for each functioning build assembly comprises displacing the bonding module along the manufacturing path for performing the bonding operation after completion of the layering operation from one functioning build assembly to another functioning build assembly.

4. The method of claim 3 , comprising syncing the displacement of the bonding module and the deposition of the top layer of build material on each build assembly to activate the bonding operation by the bonding module as soon as each top layer of build material is deposited along the manufacturing path.

5. The method of claim 1 , wherein the at least one guidable module is a layer deposition device, and the deposition of the top layer of build material for each functioning build assembly comprises displacing the layer deposition device along the manufacturing path for performing the layering operation after completion of the bonding operation from one functioning build assembly to another functioning build assembly.

6. The method of claim 5 , comprising syncing the displacement of the layer deposition device and the bonding of the top layer of build material on each build assembly to activate the layering operation by the layer deposition device as soon as each bonded layer is formed along the manufacturing path.

7. The method of claim 1 , comprising generating a signal or computer readable instructions upon completion of at least one of a layering operation or a bonding operation on one build assembly, and activating a subsequent bonding operation or layering operation on said build assembly based on said signal or computer readable instructions.

8. The method of claim 1 , comprising replacing one build assembly with a new build assembly upon completion of the three-dimensional part on said build assembly, thereby enabling removal of the three-dimensional part without interrupting production of the three-dimensional parts of the build assemblies along the manufacturing path.

9. The method of claim 1 , comprising adjusting a size of the manufacturing path to the functioning build assemblies.

10. The method of claim 1 , wherein the manufacturing path is of rectangular, discorectangular, polygonal or circular shape.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 17, 2026
From: 9397-8914 QUÉBEC INC.
To: TROADEY INC.
Reel/Frame 075303/0530 →
MERGER Recorded Nov 13, 2025
From: 9328-8082 QUÉBEC INC.
To: 9397-8914 QUÉBEC INC.
Reel/Frame 072892/0784 →
Continuity (3)
Division 16406366 · May 8, 2019
Provisional Application 62668487 · May 8, 2018
Related Publication 20220258417A1 · Aug 18, 2022