IP Library › Granted Patent US 12,457,588
Granted Patent B2
US 12,457,588 · App. 17/694,322 · Granted Oct 28, 2025

High frequency time domain resource allocation

Inventors: Yunjung Yi (Vienna, VA); Esmael Hejazi Dinan (McLean, VA); Jonghyun Park (Syosset, NY); Hyoungsuk Jeon (Centreville, VA); Ali Cagatay Cirik (Chantilly, VA); Hua Zhou (Vienna, VA); Nazanin Rastegardoost (McLean, VA)
Assignee: Ofinno, LLC
H04W72/0446H04W72/23
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,457,588
App. No.
17/694,322
Granted
Oct 28, 2025
Kind
B2
Abstract

A wireless device may receive one or more configuration parameters indicating entries of a time domain resource allocation table and one or more scheduling offsets. Each entry of the entries may comprise a respective slot offset. The wireless device may receive downlink control information (DCI) indicating a first entry of the entries and a first scheduling offset of the one or more scheduling offsets. The wireless device may receive downlink data in a first slot determined based on a slot offset of the first entry and the first scheduling offset.

Claims (58)

1. A method comprising:

receiving, by a wireless device, one or more configuration parameters indicating:

entries of a time domain resource allocation table, wherein each entry of the entries comprises a respective slot offset; and

a set of scheduling offsets, wherein the set of scheduling offsets is not included in the time domain resource allocation table, each scheduling offset comprising a respective ratio sub-value and a respective scheduling offset sub-value;

receiving downlink control information (DCI) indicating:

a first index value indicating a slot offset of a first entry of the entries; and

a second index value indicating a scheduling offset of the set of scheduling offsets, the scheduling offset comprising a ratio sub-value and a scheduling offset sub-value;

determining a first slot for receiving downlink data, based on the slot offset indicated by the first index value of the first entry and the scheduling offset indicated by the second index value, wherein the first slot is determined based on the sum of the slot offset multiplied by the ratio sub-value and the scheduling offset sub-value; and

receiving the downlink data in the first slot.

2. The method of claim 1 , wherein each entry of the entries further comprises a starting symbol and a duration, in symbols, of the downlink data.

3. The method of claim 2 , wherein the starting symbol and the duration, of each entry of the entries, are jointly encoded as a start and length indicator value (SLIVs).

4. The method of claim 1 , wherein the first slot is determined based on the sum of the scheduling offset and the slot offset.

5. The method of claim 1 , wherein the one or more configuration parameters indicate the set of scheduling offsets in an order.

6. The method of claim 1 , wherein:

the DCI is received via a first cell; and

the DCI schedules the downlink data for a second cell.

7. The method of claim 6 , wherein:

the first cell operates with a first subcarrier spacing of one or more first subcarrier spacings;

the second cell operates with a second subcarrier spacing of one or more second subcarrier spacings; and

each of the set of scheduling offsets corresponds to a pair of the one or more first subcarrier spacings and the one or more second subcarrier spacings.

8. The method of claim 7 , further comprising determining a ratio between the second subcarrier spacing and the first subcarrier spacing, wherein the one or more configuration parameters indicate a threshold for applying the set of scheduling offsets based on the ratio.

9. The method of claim 8 , wherein a first scheduling offset is zero in response to the ratio not satisfying the threshold.

10. The method of claim 1 , wherein the downlink data is one or more physical downlink shared channels (PDSCHs).

11. A wireless device comprising:

one or more processors; and

memory storing instructions that, when executed by the one or more processors, cause the wireless device to:

receive one or more configuration parameters indicating:

entries of a time domain resource allocation table, wherein each entry of the entries comprises a respective slot offset; and

a set of scheduling offsets, wherein the set of scheduling offsets is not included in the time domain resource allocation table, each scheduling offset comprising a respective ratio sub-value and a respective scheduling offset sub-value;

receive downlink control information (DCI) indicating:

a first index value indicating a slot offset of a first entry of the entries; and

a second index value indicating a scheduling offset of the set of scheduling offsets, the scheduling offset comprising a ratio sub-value and a scheduling offset sub-value;

determine a first slot for receiving downlink data, based on the slot offset indicated by the first index value of the first entry and the scheduling offset indicated by the second index value, wherein the first slot is determined based on the sum of the slot offset multiplied by the ratio sub-value and the scheduling offset sub-value; and

receive the downlink data in the first slot.

12. The wireless device of claim 11 , wherein each entry of the entries further comprises a starting symbol and a duration, in symbols, of the downlink data.

13. The wireless device of claim 12 , wherein the starting symbol and the duration, of each entry of the entries, are jointly encoded as a start and length indicator value (SLIVs).

14. The wireless device of claim 11 , wherein the first slot is determined based on the sum of the scheduling offset and the slot offset.

15. The wireless device of claim 11 , wherein the one or more configuration parameters indicate the set of scheduling offsets in an order.

16. The wireless device of claim 11 , wherein:

the DCI is received via a first cell; and

the DCI schedules the downlink data for a second cell.

17. The wireless device of claim 16 , wherein:

the first cell operates with a first subcarrier spacing of one or more first subcarrier spacings;

the second cell operates with a second subcarrier spacing of one or more second subcarrier spacings; and

each of the set of scheduling offsets corresponds to a pair of the one or more first subcarrier spacings and the one or more second subcarrier spacings.

18. The wireless device of claim 17 , wherein the instructions further cause the wireless device to determine a ratio between the second subcarrier spacing and the first subcarrier spacing, wherein:

the one or more configuration parameters indicate a threshold for applying the set of scheduling offsets based on the ratio; and

a first scheduling offset is zero in response to the ratio not satisfying the threshold.

19. The wireless device of claim 11 , wherein the downlink data is one or more physical downlink shared channels (PDSCHs).

20. A non-transitory computer-readable medium comprising instructions that, when executed by one or more processors of a wireless device, cause the wireless device to:

receive, from a base station, one or more configuration parameters indicating:

entries of a time domain resource allocation table, wherein each entry of the entries comprises a respective slot offset; and

a set of scheduling offsets, wherein the set of scheduling offsets is not included in the time domain resource allocation table, each scheduling offset comprising a respective ratio sub-value and a respective scheduling offset sub-value;

receive, from the base station, downlink control information (DCI) indicating:

a first index value indicating a slot offset of a first entry of the entries; and

a second index value indicating a scheduling offset of the set of scheduling offsets, the scheduling offset comprising a ratio sub-value and a scheduling offset sub-value;

determine a first slot for receiving downlink data, based on the slot offset indicated by the first index value of the first entry and the scheduling offset indicated by the second index value, wherein the first slot is determined based on the sum of the slot offset multiplied by the ratio sub-value and the scheduling offset sub-value; and

receive, from the base station, the downlink data in the first slot.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 8, 2022
From: YI, YUNJUNG; DINAN, ESMAEL HEJAZI; PARK, JONGHYUN; JEON, HYOUNGSUK; CIRIK, ALI CAGATAY; ZHOU, HUA; RASTEGARDOOST, NAZANIN
To: OFINNO, LLC
Reel/Frame 060461/0138 →
Continuity (2)
Provisional Application 63161100 · Mar 15, 2021
Related Publication 20220295484A1 · Sep 15, 2022
References Cited (21)
US 11844147B2 · Noh · 2023 [cited by examiner]
US 20210321446A1 · Lee · 2021 [cited by examiner]
US 20220159700A1 · Maleki · 2022 [cited by examiner]
R1-2100061; 3GPP TSG RAN WG1 #104-e; e-meeting, Jan. 25-Feb. 5, 2021; Source: Lenovo, Motorola Mobility; Title: PDSCH/PUSCH scheduling enhancements for NR from 52.6 GHz to 71GHz; Agenda Item: 8.2.5; Document for: Discus… [cited by applicant]
R1-2100644; 3GPP TSG RAN WG1 Meeting #104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Source: Intel Corporation; Title: Discussion on PDCCH monitoring enhancements for extending NR up to 71 GHz; Agenda item: 8.2.2; Document for… [cited by applicant]
R1-2100820; 3GPP TSG RAN WG1#104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.5; Source: Spreadtrum Communications; Title: Discussion on PDSCH and PUSCH enhancements for above 52.6GHZ; Document for: Discussion a… [cited by applicant]
R1-2101373; 3GPP TSG RAN WG1 #104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.2; Source: Apple Inc.; Title: PDCCH monitoring enhancements for NR between 52.6GHz and 71 GHz; Document for: Discussion/Decision. [cited by applicant]
R1-2101376; 3GPP TSG RAN WG1 ⊇104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.5; Source: Apple Inc.; Title: PDSCH/PUSCH enhancements for NR between 52.6GHz and 71 GHz; Document for: Discussion/Decision. [cited by applicant]
R1-2101454; 3GPP TSG-RAN WG1 190 104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda item: 8.2.2; Source: Qualcomm Incorporated; Title: PDCCH monitoring enhancements; Document for: Discussion/Decision. [cited by applicant]
R1-2101457; 3GPP TSG-RAN WG1 #104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda item: 8.2.5; Source: Qualcomm Incorporated; Title: PDSCH and PUSCH enhancements for 52.6-71GHz band; Document for: Discussion/Decision. [cited by applicant]
R1-2101776; 3GPP TSG RAN WG1 Meeting #104-e; E-meeting, Jan. 25-Feb. 5, 2021; Source: Moderator (vivo); Title: Summary of PDSCH/PUSCH enhancements (Bandwidth/Timeline/Reference signals); Agenda item: 8.2.5; Document for… [cited by applicant]
R1-2101858; 3GPP TSG RAN WG1 #104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.5; Source: Moderator (LG Electronics); Title: Summary #2 of PDSCH/PUSCH enhancements (Scheduling/HARQ); Document for: Discussion and… [cited by applicant]
R1-2101874; 3GPP TSG RAN WG1#104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.2; Source: Moderator (Lenovo); Title: Feature lead summary for [104-e-NR-52-71GHZ-02] Email discussion/approval on PDCCH monitoring e… [cited by applicant]
R1-2101883; 3GPP TSG RAN WG1 Meeting #104-e; E-meeting, Jan. 25-Feb. 5, 2021; Source: Moderator (vivo); Title: Discussion summary #1 of [104-e-NR-52-71GHz-05]; Agenda item: 8.2.5; Document for: Discussion and decision. [cited by applicant]
R1-2101972; 3GPP TSG RAN WG1 #104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.5; Source: Moderator (LG Electronics); Title: Summary #3 of PDSCH/PUSCH enhancements (Scheduling/HARQ); Document for: Discussion and… [cited by applicant]
R1-2102072; 3GPP TSG RAN WG1 Meeting #104-e; E-meeting, Jan. 25-Feb. 5, 2021; Source: Moderator (vivo); Title: Discussion summary #2 of [104-e-NR-52-71GHz-05]; Agenda item: 8.2.5; Document for: Discussion and decision. [cited by applicant]
R1-2102080; 3GPP TSG RAN WG1 #104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.5; Source: Moderator (LG Electronics); Title: Summary #4 of PDSCH/PUSCH enhancements (Scheduling/HARQ); Document for: Discussion and… [cited by applicant]
R1-2102142; 3GPP TSG RAN WG1#104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.2; Source: Moderator (Lenovo); Title: Feature lead summary#2 for [104-e-NR-52-71GHz-02] on PDCCH monitoring enhancements; Document fo… [cited by applicant]
R1-2102192; 3GPP TSG-RAN WG1 Meeting #104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda item: 8.2; Title: Session notes for 8.2 (Study on supporting NR from 52.6 GHz to 71 GHZ); Source: Ad-hoc Chair (Ericsson); Document fo… [cited by applicant]
R1-2102237; 3GPP TSG RAN WG1 Meeting #104-e; E-meeting, Jan. 25-Feb. 5, 2021; Source: Moderator (vivo); Title: Discussion summary #3 of [104-e-NR-52-71GHz-05]; Agenda item: 8.2.5; Document for: Discussion and decision. [cited by applicant]
R1-2102242; 3GPP TSG RAN WG1#104-e; e-Meeting, Jan. 25-Feb. 5, 2021; Agenda Item: 8.2.2; Source: Moderator (Lenovo); Title: Feature lead summary#3 for [104-e-NR-52-71GHz-02] on PDCCH monitoring enhancements; Document fo… [cited by applicant]
Cited By (1)
US 12,713,408