IP Library Granted Patent US 11,968,263
Granted Patent B2
US 11,968,263 · App. 17/703,621 · Granted Apr 23, 2024

Behind-the-meter resource management system

Inventors: Ram Rajagopal (Stanford, CA); Gustavo Vianna Cezar (Stanford, CA); Thomas Navidi (Stanford, CA); Elizabeth Buechler (Stanford, CA); Abbas El Gamal (Stanford, CA)
Assignee: The Board of Trustees of the Leland Stanford Junior University
H04L67/125H02J3/003
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,968,263
App. No.
17/703,621
Granted
Apr 23, 2024
Kind
B2
Abstract

A method and a system for managing power resources. One or more measurements received from one or more sensors communicatively coupled to at least one processor are processed. The sensors monitor and measure at least one of: one or more operational parameters associated with operation of at least one equipment, one or more external parameters associated with an environment of the equipment, and one or more power parameters associated with a power consumption by the equipment. Based on the processed one or more measurements, one or more future operational parameters associated with an operation of the are determined. The operation of the equipment is controlled using the determined future operational parameters.

Claims (39)

1. A computer implemented method comprising:

processing, using at least one processor, one or more measurements received from one or more sensors communicatively coupled to the at least one processor, the one or more sensors monitoring and measuring one or more operational parameters associated with operation of at least one equipment located behind a meter at a residential facility or a commercial facility, one or more external parameters associated with an environment of the at least one equipment, and one or more power parameters associated with a power consumption by the at least one equipment;

determining, using the at least one processor and based on the processed one or more measurements, one or more future operational parameters associated with an operation of the at least one equipment located behind the meter at the residential facility or the commercial facility; and

controlling, using the at least one processor, the operation of the at least one equipment located behind the meter at the residential facility or the commercial facility using the determined one or more future operational parameters.

2. The method according to claim 1 , wherein the one or more operational parameters include at least one of the following: an operating speed of the at least one equipment, a duration of the operation of the at least one equipment, a start time of the operation of the at least one equipment, an end time of the operation of the at least one equipment, and any combination thereof.

3. The method according to claim 1 , wherein the one or more external parameters include an external temperature corresponding a temperature of air outside of an operational location of the at least one equipment, an internal temperature corresponding a temperature of air at the operational location of the at least one equipment, an external humidity corresponding a humidity of air outside of the operational location of the at least one equipment, an internal humidity corresponding a humidity of air at the operational location of the at least one equipment, a wind speed of air outside of the operational location of the at least one equipment, a wind direction of air outside of the operational location of the at least one equipment, and a level of solar irradiance outside of the operational location of the at least one equipment.

4. The method according to claim 1 , wherein the one or more power parameters include at least one of the following: a power consumption by the at least one equipment during operation from an electrical grid, a power consumption by the at least one equipment during operation from a stored power source, a power consumption by the at least one equipment during operation from an alternate energy source, and any combination thereof.

5. The method according to claim 1 , wherein the determining includes

training at least one model using one or more operational parameters associated with operation of at least one control equipment, one or more external parameters associated with an environment of the at least one control equipment, and one or more power parameters associated with a power consumption by the at least one control equipment; and

predicting, using the trained model, the one or more future operational parameters associated operation of the at least one equipment based on the processed one or more measurements.

6. The method according to claim 5 , wherein

the one or more operational parameters associated with the operation of at least one control equipment are maximum one or more operational parameters;

the one or more external parameters associated with the environment of the at least one control equipment are maximum one or more external parameters; and

the one or more power parameters associated with the power consumption by the at least one control equipment are maximum one or more power parameters.

7. The method according to claim 1 , wherein the determining includes determining the one or more future operational parameters associated with the operation of the at least one equipment to reduce a power consumption by the at least one equipment from an electrical grid during operation.

8. The method according to claim 1 , wherein the controlling includes providing, using the at least one processor, a control signal to one or more variable frequency drive components to control operation of the at least one equipment based on the determined one or more future operational parameters.

9. The method according to claim 8 , wherein the one or more variable frequency drive components is communicatively coupled to and selectively provides power to the at least one equipment from an electrical grid, a stored power source, and an alternate energy source.

10. The method according to claim 9 , wherein the at least one equipment is at least one fan located at a farming facility configured to house cattle, wherein the at least one fan is controlled to provide evaporative cooling in the farming facility housing the cattle.

11. The method according to claim 9 , wherein the alternate energy source includes at least one of the following: a solar panel, a windmill, a hydroelectric station, and any combination thereof.

12. A system comprising:

at least one programmable processor; and

a non-transitory machine-readable medium storing instructions that, when executed by the at least one programmable processor, cause the at least one programmable processor to perform operations comprising:

processing one or more measurements received from one or more sensors communicatively coupled to the at least one programmable processor, the one or more sensors monitoring and measuring one or more operational parameters associated with operation of at least one equipment located behind a meter at a residential facility or a commercial facility, one or more external parameters associated with an environment of the at least one equipment, and one or more power parameters associated with a power consumption by the at least one equipment;

determining, based on the processed one or more measurements, one or more future operational parameters associated with an operation of the at least one equipment located behind the meter at the residential facility or the commercial facility; and

controlling the operation of the at least one equipment located behind the meter at the residential facility or the commercial facility using the determined one or more future operational parameters.

13. The system according to claim 12 , wherein the one or more operational parameters include at least one of the following: an operating speed of the at least one equipment, a duration of the operation of the at least one equipment, a start time of the operation of the at least one equipment, an end time of the operation of the at least one equipment, and any combination thereof.

14. The system according to claim 12 , wherein the one or more external parameters include an external temperature corresponding a temperature of air outside of an operational location of the at least one equipment, an internal temperature corresponding a temperature of air at the operational location of the at least one equipment, an external humidity corresponding a humidity of air outside of the operational location of the at least one equipment, an internal humidity corresponding a humidity of air at the operational location of the at least one equipment, a wind speed of air outside of the operational location of the at least one equipment, a wind direction of air outside of the operational location of the at least one equipment, and a level of solar irradiance outside of the operational location of the at least one equipment.

15. The system according to claim 12 , wherein the one or more power parameters include at least one of the following: a power consumption by the at least one equipment during operation from an electrical grid, a power consumption by the at least one equipment during operation from a stored power source, a power consumption by the at least one equipment during operation from an alternate energy source, and any combination thereof.

16. The system according to claim 12 , wherein the determining includes

training at least one model using one or more operational parameters associated with operation of at least one control equipment, one or more external parameters associated with an environment of the at least one control equipment, and one or more power parameters associated with a power consumption by the at least one control equipment, and

predicting, using the trained model, the one or more future operational parameters associated operation of the at least one equipment based on the processed one or more measurements;

wherein

the one or more operational parameters associated with the operation of at least one control equipment are maximum one or more operational parameters;

the one or more external parameters associated with the environment of the at least one control equipment are maximum one or more external parameters; and

the one or more power parameters associated with the power consumption by the at least one control equipment are maximum one or more power parameters.

17. The system according to claim 12 , wherein the determining includes determining the one or more future operational parameters associated with the operation of the at least one equipment to reduce a power consumption by the at least one equipment from an electrical grid during operation.

18. The system according to claim 12 , wherein the controlling includes providing, using the at least one processor, a control signal to one or more variable frequency drive components to control operation of the at least one equipment based on the determined one or more future operational parameters.

19. The method according to claim 8 , wherein the one or more variable frequency drive components is communicatively coupled to and selectively provides power to the at least one equipment from an electrical grid, a stored power source, and an alternate energy source;

wherein the alternate energy source includes at least one of the following: a solar panel, a windmill, a hydroelectric station, and any combination thereof.

Assignments (2)
CONFIRMATORY LICENSE Recorded Sep 6, 2023
From: STANFORD UNIVERSITY
To: U.S. DEPARTMENT OF ENERGY
Reel/Frame 064812/0879 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 19, 2022
From: RAJAGOPAL, RAM; CEZAR, GUSTAVO VIANNA; NAVIDI, THOMAS; BUECHLER, ELIZABETH; GAMAL, ABBAS EL
To: THE BOARD OF TRUSTEES FOR THE LELAND STANFORD JUNIOR UNIVERSITY
Reel/Frame 060554/0324 →
Continuity (2)
Provisional Application 63165378 · Mar 24, 2021
Related Publication 20220321664A1 · Oct 6, 2022