IP Library Granted Patent US 12,232,134
Granted Patent B2
US 12,232,134 · App. 17/711,976 · Granted Feb 18, 2025

Methods for uplink and downlink transmission/reception without grant and apparatus therefor

Inventors: Min Wu (Beijing, CN); Feifei Sun (Beijing, CN); Yi Wang (Beijing, CN)
Assignee: Samsung Electronics Co., Ltd.
H04W72/23H04W52/346
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,232,134
App. No.
17/711,976
Granted
Feb 18, 2025
Kind
B2
Abstract

The present disclosure provides a method performed by user equipment, comprising: receiving configuration information of scheduling without grant for uplink or downlink; performing a transmission of the scheduling without grant based on the configuration information of scheduling without grant, wherein the configuration information of scheduling without grant comprises first information and/or second information, wherein the first information is used for indicating related information of multiple different transport block sizes and the second information is used for indicating related information of multiple different starting time domain positions.

Claims (100)

1. A method performed by user equipment, the method comprising:

receiving configuration information of scheduling without a grant for an uplink transmission or a downlink reception,

wherein the configuration information of the scheduling without the grant includes first information and second information,

wherein the first information is used for indicating multiple different transport block sizes and the second information is used for indicating multiple different starting time domain positions which are associated with each of the multiple different transport block sizes, respectively, and

wherein the first information includes respective ratio information of each transport block size associated with a reference transport block size; and

performing the uplink transmission based on the respective ratio information of each of the transport block sizes associated with the reference transport block size and the multiple different starting time domain positions which are associated with each of the multiple different transport block sizes.

2. The method according to claim 1 , further comprising:

receiving a radio resource control (RRC) message for configuring the scheduling without the grant, the RRC message including the configuration information of the scheduling without the grant; or

receiving downlink control information (DCI) for configuring the scheduling without the grant, the DCI including the configuration information of the scheduling without the grant.

3. The method according to claim 1 , wherein the first information further includes at least one of:

information of multiple different transport block sizes;

respective ratio information of a number of time domain resources corresponding to each transport block size associated with a number of time domain resources corresponding to the reference transport block size;

respective ratio information of a size of frequency domain resources corresponding to each transport block size associated with a size of frequency domain resources corresponding to the reference transport block size; or

respective ratio information of transmission power corresponding to each transport block size associated with transmission power corresponding to the reference transport block size.

4. The method according to claim 3 , wherein:

the reference transport block size is a predefined as one of multiple transport block sizes;

the time domain resources and frequency domain resources corresponding to the reference transport block size are indicated through scheduling information without the grant; and

the reference transport block size is determined based on the scheduling information without the grant.

5. The method according to claim 4 , further comprising:

calculating at least one of the time domain resources, the frequency domain resources, or the transmission power corresponding to each transport block size by at least one of:

respectively calculating the number of time domain resources corresponding to each transport block size based on the number of time domain resources corresponding to the reference transport block size, the reference transport block size and each transport block size;

respectively calculating the size of the frequency domain resources corresponding to each transport block size based on the size of the frequency domain resources corresponding to the reference transport block size, the reference transport block size and each transport block size;

respectively calculating the transmission power corresponding to each transport block size based on the transmission power corresponding to the reference transport block size, the reference transport block size and each transport block size;

respectively calculating the number of time domain resources corresponding to each transport block size based on the number of time domain resources corresponding to the reference transport block size and respective ratio information of the number of time domain resources corresponding to each transport block size associated with the number of time domain resources corresponding to the reference transport block size;

respectively calculating the size of frequency domain resources corresponding to each transport block size based on the size of frequency domain resources corresponding to the reference transport block size and respective ratio information of the size of frequency domain resources corresponding to each transport block size associated with the size of frequency domain resources corresponding to the reference transport block size; or

respectively calculating the transmission power corresponding to each transport block size based on the transmission power corresponding to the reference transport block size and respective ratio information of the transmission power corresponding to each transport block size associated with the transmission power corresponding to the reference transport block size.

6. The method according to claim 5 , wherein, different transport block sizes correspond to different numbers of time domain symbols, respectively;

different transport block sizes correspond to different numbers of slots, respectively;

different transport block sizes correspond to different numbers of repetitions, respectively;

different transport block sizes correspond to different numbers of physical resource blocks (PRBs), respectively; or

different transport block sizes correspond to different numbers of resource block groups (RBGs), respectively.

7. The method according to claim 5 , further comprising:

for the scheduling without the grant for the uplink transmission, selecting at least one of a transport block size from among the multiple different transport block sizes to transmit a physical uplink shared channel (PUSCH) of the scheduling without the grant or one initial time domain location from among multiple different initial time domain locations to transmit the PUSCH of the scheduling without the grant; or

for the scheduling without the grant for the downlink reception, blindly decoding at least one of a physical downlink shared channel (PDSCH) of the scheduling without the grant in the multiple different transport block sizes or the PDSCH of the scheduling without the grant in the multiple different starting time domain positions.

8. The method according to claim 7 , further comprising:

reporting the transport block size used by the PUSCH of the scheduling without the grant or obtaining the transport block size used by the PDSCH of the scheduling without the grant by at least one of:

transmitting information of the transport block size used by the PUSCH on one or more symbols of resources corresponding to the PUSCH;

implicitly indicating the transport block size used by the PUSCH through a demodulation reference signal (DMRS) sequence or a cyclic redundancy check (CRC) scrambling code sequence used by the PUSCH;

receiving indication information of the transport block size used by the PDSCH on one or more symbols of the resources corresponding to the PDSCH; or

obtaining the transport block size used by the PDSCH through the DMRS sequence or the CRC scrambling code sequence used by the PDSCH.

9. The method according to claim 5 , wherein:

a transmission of the scheduling without the grant for an initial transmission supports multiple different transport block sizes and a transmission based on a dynamic scheduling for corresponding retransmission supports a transport block size; and

the transport block size used for the corresponding retransmission is a transport block size selected and used by the transmission of the scheduling without the grant among multiple different transport block sizes; or the transmission of the scheduling without the grant for the initial transmission and the transmission based on the dynamic scheduling for the corresponding retransmission both support the multiple different transport block sizes.

10. The method according to claim 5 , further comprising:

transmitting, to a base station, information for indicating capability of the user equipment, wherein the information for indicating the capability of the user equipment comprises at least one of:

information for indicating a maximum number of physical downlink shared channels (PDSCHs) that the user equipment decodes;

information for indicating whether the user equipment supports transmissions of the scheduling without the grant with the multiple different transport block sizes;

information for indicating whether the user equipment supports transmissions of the scheduling without the grant with the multiple different starting time domain positions; or

information for indicating whether the user equipment supports transmissions of the scheduling without the grant with both multiple different transmission sizes and the multiple different starting time domain positions.

11. The method according to claim 5 , wherein the second information includes at least one of:

information of intervals of the multiple different starting time domain positions associated with a first starting time domain position in the multiple different starting time domain positions;

information of intervals of the multiple different starting time domain positions associated with respective previous starting time domain positions;

information of a number of different starting time domain positions; or

information of time domain windows where different starting time domain positions are located.

12. The method according to claim 5 , wherein transmissions at the multiple different starting time domain positions correspond to same frequency domain resources and partially overlapping or non-overlapping time domain resources.

13. A method performed by a base station, the method comprising:

transmitting, to a user equipment, configuration information of scheduling without a grant for an uplink reception or a downlink transmission,

wherein the configuration information of the scheduling without the grant includes first information and second information,

wherein the first information is used for indicating multiple different transport block sizes and the second information is used for indicating multiple different starting time domain positions which are associated with each of the multiple different transport block sizes, respectively, and

wherein the first information includes respective ratio information of each transport block size associated with a reference transport block size; and

performing the uplink reception based on the respective ratio information of each of the transport block sizes associated with the reference transport block size and the multiple different starting time domain positions which are associated with each of the multiple different transport block sizes.

14. A user equipment, the user equipment comprising:

a transceiver configured to receive configuration information of scheduling without a grant for an uplink transmission or a downlink reception,

wherein the configuration information of the scheduling without the grant includes first information and second information,

wherein the first information is used for indicating multiple different transport block sizes and the second information is used for indicating multiple different starting time domain positions which are associated with each of the multiple different transport block sizes, respectively, and

wherein the first information includes respective ratio information of each transport block size associated with a reference transport block size; and

a processor operably coupled to the transceiver, the processor configured to perform the uplink transmission based on the respective ratio information of each of the transport block sizes associated with the reference transport block size and the multiple different starting time domain positions which are associated with each of the multiple different transport block sizes.

15. The user equipment according to claim 14 , wherein the transceiver is further configured to:

receive a radio resource control (RRC) message for configuring the scheduling without the grant, the RRC message including the configuration information of the scheduling without the grant; or

receive downlink control information (DCI) for configuring the scheduling without the grant, the DCI including the configuration information of the scheduling without the grant.

16. The user equipment according to claim 14 , wherein the first information further includes at least one of:

information of multiple different transport block sizes;

respective ratio information of a number of time domain resources corresponding to each transport block size associated with a number of time domain resources corresponding to the reference transport block size;

respective ratio information of a size of frequency domain resources corresponding to each transport block size associated with a size of frequency domain resources corresponding to the reference transport block size; or

respective ratio information of transmission power corresponding to each transport block size associated with transmission power corresponding to the reference transport block size.

17. The user equipment according to claim 16 , wherein:

the reference transport block size is a predefined as one of multiple transport block sizes;

the time domain resources and frequency domain resources corresponding to the reference transport block size are indicated through scheduling information without the grant; and

the reference transport block size is determined based on the scheduling information without the grant.

18. The user equipment according to claim 17 , wherein the processor is further configured to:

calculate at least one of the time domain resources, the frequency domain resources, or the transmission power corresponding to each transport block size by at least one of:

respectively calculating the number of time domain resources corresponding to each transport block size based on the number of time domain resources corresponding to the reference transport block size, the reference transport block size and each transport block size;

respectively calculating the size of the frequency domain resources corresponding to each transport block size based on the size of the frequency domain resources corresponding to the reference transport block size, the reference transport block size and each transport block size;

respectively calculating the transmission power corresponding to each transport block size based on the transmission power corresponding to the reference transport block size, the reference transport block size and each transport block size;

respectively calculating the number of time domain resources corresponding to each transport block size based on the number of time domain resources corresponding to the reference transport block size and respective ratio information of the number of time domain resources corresponding to each transport block size associated with the number of time domain resources corresponding to the reference transport block size;

respectively calculating the size of frequency domain resources corresponding to each transport block size based on the size of frequency domain resources corresponding to the reference transport block size and respective ratio information of the size of frequency domain resources corresponding to each transport block size associated with the size of frequency domain resources corresponding to the reference transport block size; or

respectively calculating the transmission power corresponding to each transport block size based on the transmission power corresponding to the reference transport block size and respective ratio information of the transmission power corresponding to each transport block size associated with the transmission power corresponding to the reference transport block size.

19. The user equipment according to claim 15 , wherein,

different transport block sizes correspond to different numbers of time domain symbols, respectively;

different transport block sizes correspond to different numbers of slots, respectively;

different transport block sizes correspond to different numbers of repetitions, respectively;

different transport block sizes correspond to different numbers of physical resource blocks (PRBs), respectively; or

different transport block sizes correspond to different numbers of resource block groups (RBGs), respectively.

20. A base station, the base station comprising:

a processor; and

a transceiver operably coupled to the processor, the transceiver configured to transmit, to a user equipment, configuration information of scheduling without a grant for an uplink reception or a downlink transmission,

wherein the configuration information of the scheduling without the grant includes first information and second information,

wherein the first information is used for indicating multiple different transport block sizes and the second information is used for indicating multiple different starting time domain positions which are associated with each of the multiple different transport block sizes, respectively, and

wherein the first information includes respective ratio information of each transport block size associated with a reference transport block size; and

a processor operably coupled to the transceiver, the processor configured to perform the uplink reception based on the respective ratio information of each of the transport block sizes associated with the reference transport block size and the multiple different starting time domain positions which are associated with each of the multiple different transport block sizes.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 1, 2022
From: WU, MIN; SUN, FEIFEI; WANG, YI
To: SAMSUNG ELECTRONICS CO., LTD
Reel/Frame 059478/0037 →
Priority Claims (2)
CN 202110362067.X · Apr 2, 2021 · national
CN 202110893370.2 · Aug 4, 2021 · national
Continuity (1)
Related Publication 20220322415A1 · Oct 6, 2022
References Cited (11)
US 20190082454A1 · Shi et al. · 2019 [cited by applicant]
US 20190159139A1 · Yamada · 2019 [cited by examiner]
US 20190342944A1 · Chatterjee et al. · 2019 [cited by applicant]
US 20200178228A1 · Li · 2020 [cited by examiner]
US 20240196397A1 · Awad · 2024 [cited by examiner]
Lucas-Estan, On the Capacity of 5G NR Grant-Free Scheduling with Shared Radio Resources to Support Ultra-Reliable and Low-Latency Communications, 2019 (Year: 2019). [cited by examiner]
Vivo, “Challenges and potential enhancements of XR”, 3GPP TSG RAN WG1 #104-e, Jan. 25-Feb. 5, 2021, R1-2100479, 6 pages. [cited by applicant]
Catt, “Potential area of NR enhancement for the support of XR services”, 3GPP TSG RAN WG1 #104-e, Jan. 25-Feb. 5, 2021, R1-2100364, 4 pages. [cited by applicant]
Apple Inc., “Views on potential enhancements for XR”, 3GPP TSG-RAN WG1 Meeting #104-e, Jan. 25-Feb. 5, 2021, R1-2101367, 4 pages. [cited by applicant]
International Search Report dated Jul. 22, 2022 in connection with International Patent Application No. PCT/KR2022/004751, 3 pages. [cited by applicant]
Written Opinion of the International Searching Authority dated Jul. 22, 2022 in connection with International Patent Application No. PCT/KR2022/004751, 3 pages. [cited by applicant]