IP Library Granted Patent US 12,302,216
Granted Patent B2
US 12,302,216 · App. 17/732,546 · Granted May 13, 2025

Methods, wireless communications networks and infrastructure equipment

Inventors: Yuxin Wei (Basingstoke, GB); Vivek Sharma (Basingstoke, GB); Hideji Wakabayashi (Basingstoke, GB)
Assignee: SONY GROUP CORPORATION
H04W40/24H04W40/12H04W40/22H04W84/047
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,302,216
App. No.
17/732,546
Granted
May 13, 2025
Kind
B2
Abstract

A method of controlling communications within a wireless communications network is provided. The method comprises determining, by a first of the infrastructure equipment acting as a donor node connected to a core network part of the wireless communications network, that a plurality of different communications paths exist from a second infrastructure equipment to the first infrastructure equipment via one or more other infrastructure equipment acting as relay nodes, transmitting, by the first infrastructure equipment, an indication at least part of each of one or more of the plurality of different communications paths to the second infrastructure equipment, and selecting, by the second infrastructure equipment based on the indication received from the first infrastructure equipment, at least one of the plurality of different communications paths for communicating with the first infrastructure equipment.

Claims (37)

1. A method of operating a first infrastructure equipment forming part of a wireless communications network wherein the first infrastructure equipment is configured to act as a donor node connected to a core network part of the wireless communications network, the method comprising

determining that a plurality of communications paths exist from a second infrastructure equipment to the first infrastructure equipment via one or more other infrastructure equipment acting as relay nodes;

reserving a communications path between the first infrastructure equipment and the second infrastructure equipment via the one or more other infrastructure equipment acting as the relay nodes, wherein use of the reserved communications path is triggered in response to one or more predetermined conditions being met; and

transmitting an indication regarding at least part of each of one or more of the plurality of communications paths to the second infrastructure equipment, the indication for use by the second infrastructure equipment for selection of at least one of the plurality of communications paths for communicating with the first infrastructure equipment.

2. The method of claim 1 , further comprising:

receiving, at the first infrastructure equipment, from the second infrastructure equipment, information relating to each of the plurality of different communications paths from the second infrastructure equipment to the first infrastructure equipment via the one or more other infrastructure equipment acting as the relay nodes, the plurality of different communications paths including the reserved communications path.

3. The method of claim 2 , further comprising:

determining, by the first infrastructure equipment, based on the received information relating to the plurality of different communications paths, that the one or more predetermined conditions are met.

4. The method of claim 3 , further comprising:

selecting, by the first infrastructure equipment, the reserved communications path for communicating with the second infrastructure equipment.

5. The method of claim 4 , further comprising:

transmitting, by the first infrastructure equipment to the second infrastructure equipment, an indication of the selection of the reserved communications path for communications between the first infrastructure equipment and the second infrastructure equipment.

6. The method of claim 5 , wherein the determining that the communications path between the first infrastructure equipment and the second infrastructure equipment via the one or more other infrastructure equipment acting as the relay nodes should be reserved comprises reserving all of the communications resources of the one or more other infrastructure equipment acting as the relay nodes for use in communications between the first infrastructure equipment and the second infrastructure equipment via the reserved communications path.

7. The method of claim 5 , wherein the determining that the communications path between the first infrastructure equipment and the second infrastructure equipment via the one or more other infrastructure equipment acting as the relay nodes should be reserved comprises reserving a portion of the communications resources of each of the one or more other infrastructure equipment acting as the relay nodes for use in communications between the first e-infrastructure equipment and the second infrastructure equipment via the reserved communications path.

8. The method of claim 5 , wherein the reserved communications path is selected for communications between the first infrastructure equipment and the second infrastructure equipment instead of a currently used communications path for communications between the first infrastructure equipment and the second infrastructure equipment.

9. The method of claim 5 , wherein the reserved communications path is selected for communications between the first infrastructure equipment and the second infrastructure equipment in addition to a currently used communications path for communications between the first infrastructure equipment and the second infrastructure equipment.

10. The method of claim 1 , wherein the determining by the first infrastructure equipment that the plurality of different communications path exists is based on receiving, at the first infrastructure equipment, from the second infrastructure equipment, information relating to each of the plurality of different communications paths from the second infrastructure equipment to the first infrastructure equipment via the one or more other infrastructure equipment acting as the relay nodes.

11. A method of operating a second infrastructure equipment forming part of a wireless communications network, the method comprising:

receiving, from a first infrastructure equipment acting as a donor node connected to a core network part of the wireless communications network, an indication regarding at least part of each of one or more of a plurality of communications paths between the first infrastructure equipment and the second infrastructure equipment via one or more other infrastructure equipment acting as relay nodes; and

selecting, based on the indication received from the first infrastructure equipment, at least one of the plurality of communications paths for communicating with the first infrastructure equipment,

wherein at least one of the plurality of different communications paths is a reserved communications path between the first infrastructure equipment and the second infrastructure equipment via the one or more other infrastructure equipment acting as the relay nodes, wherein use of the reserved communications path is triggered in response to one or more predetermined conditions being met.

12. The method of claim 11 , further comprising:

in response to the second infrastructure equipment selecting more than one of the plurality of different communications paths for communicating with the first infrastructure equipment

determining, by the second infrastructure equipment, a relative portion of data to be transmitted to the first infrastructure equipment or received from the infrastructure equipment using each of the selected communications paths; and

transmitting, by the second infrastructure equipment to the first infrastructure equipment, an indication of the relative portion of data to be transmitted to the first infrastructure equipment or received from the first infrastructure equipment using each of the selected communications paths.

13. The method of claim 11 , further comprising:

selecting, by the second infrastructure equipment, the at least one of the plurality of different communications paths for communicating with the first infrastructure equipment based on a relative link quality, in addition to the indication received from the first infrastructure equipment.

14. The method of claim 11 , further comprising:

selecting, by the second infrastructure equipment, the at least one of the plurality of different communications paths for communicating with the first infrastructure equipment based on the second infrastructure equipment and the one or more other infrastructure equipment acting as the relay nodes, in addition to the indication received from the first infrastructure equipment.

15. The method of claim 11 , further comprising:

selecting, by the second infrastructure equipment, the at least one of the plurality of different communications paths for communicating with the first infrastructure equipment based on a relative load at one or more of the first infrastructure equipment, in addition to the indication received from the first infrastructure equipment.

16. The method of claim 11 , further comprising:

selecting, by the second infrastructure equipment, the at least one of the plurality of different communications paths for communicating with the first infrastructure equipment based on a relative latency of communications, in addition to the indication received from the first infrastructure equipment.

17. The method of claim 11 , further comprising:

selecting, by the second infrastructure equipment, the at least one of the plurality of different communications paths for communicating with the first infrastructure equipment based on the second infrastructure equipment and the one or more other infrastructure equipment acting as the relay nodes.

18. The method of claim 11 , further comprising:

selecting, by the second infrastructure equipment, the at least one of the plurality of different communications paths for communicating with the first infrastructure equipment based on a relative bit rate of communications between any two of the first infrastructure equipment, the second infrastructure equipment and the one or more other infrastructure equipment acting as the relay nodes, in addition to the indication received from the first infrastructure equipment.

Assignments (1)
CHANGE OF NAME Recorded Apr 29, 2022
From: SONY CORPORATION
To: SONY GROUP CORPORATION
Reel/Frame 059823/0001 →
Priority Claims (1)
EP 18164792 · Mar 28, 2018 · regional
Continuity (2)
Continuation 17041451
Related Publication 20220256435A1 · Aug 11, 2022
References Cited (18)
US 10009825B1 · Marupaduga · 2018 [cited by examiner]
US 20070030809A1 · Dayama · 2007 [cited by applicant]
US 20080144512A1 · Molisch et al. · 2008 [cited by applicant]
US 20100046418A1 · Horn · 2010 [cited by examiner]
US 20130310052A1 · Timus et al. · 2013 [cited by applicant]
US 20160337938A1 · Tercero Vargas · 2016 [cited by examiner]
US 20160374007A1 · Tian · 2016 [cited by examiner]
US 20170289976A1 · Lai et al. · 2017 [cited by applicant]
US 20180124677A1 · He · 2018 [cited by examiner]
US 20180337846A1 · Lee · 2018 [cited by examiner]
KR 20090030685A · 2009 [cited by applicant]
WO 2017004253A1 · 2017 [cited by applicant]
International Search Report and Written Opinion mailed on Jul. 10, 2019 for PCT/EP2019/056670 filed on Mar. 18, 2019, 13 pages. [cited by applicant]
3GPP, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on Integrated Access and Backhaul,” Release 15, 3GPP TR 38.874 V0.1.0, Feb. 2018, pp. 1-11. [cited by applicant]
AT&T, et al., “New SID Proposal: Study on Integrated Access and Backhaul for NR,” 8881123GPP TSG RAN Meeting No. 75, RP-170821, Dubrovnik, Croatia, Mar. 6-9, 2017, 5 pages. [cited by applicant]
Holma, H. and Toskala, A., “System Architecture Based on 3GPP SAE,” LTE for UMTS OFDMA and SC-FDMA based radio access, John Wiley and Sons, 2009, pp. 25-27. [cited by applicant]
Huawei and Hisilicon, “Revised work item proposal: Enhancements of NB-IoT,” 3GPP TSG RAN Meeting No. 73, RP-161901, revision of RP-161324, New Orleans, USA, Sep. 19-22, 2016, 8 pages. [cited by applicant]
Qualcomm, et al., “Proposals on IAB Architecture,” 3GPP TSG-RAN WG2 NR Ad hoc 1801, R2-1801606, Vancouver, Canada, Jan. 22-26, 2018, 7 pages. [cited by applicant]