US 11,542,684 · App. 17/740,908 · Granted Jan 3, 2023

Hydraulic machine

Inventors: Hoenghwan Ahn (Gimhae-si, KR); Taerang Jung (Yangsan-si, KR); Sangkyu Joo (Changwon-si, KR); Seonggeun Yun (Changwon-si, KR); Seunghyun Lee (Changwon-si, KR); Byoungho Lee (Changwon-si, KR)
Assignee: VOLVO CONSTRUCTION EQUIPMENT AB
E02F9/2217E02F9/2296F15B1/024F15B11/024F15B21/14F15B2211/88
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,542,684
App. No.
17/740,908
Granted
Jan 3, 2023
Kind
B2
Abstract

A hydraulic machine is provided. A boom actuator includes a large chamber and a small chamber. A recovery unit receives fluid discharged from the large chamber and then recovers energy. A recovery line connects the large chamber and the recovery unit. An accumulator is connected to the recovery line. A jack-up assist line connects the accumulator and the small chamber. A jack-up assist valve is disposed on the jack-up assist line to block flow of fluid from the accumulator to the small chamber in a first position and allow the flow of fluid from the accumulator to the small chamber in a second position. A controller controls movement of the jack-up assist valve. The controller may determine whether or not the hydraulic machine is in a jack-up condition, and when the hydraulic machine is determined to be in the jack-up condition, moves the jack-up assist valve to the second position.

Claims (19)

1. A hydraulic machine comprising:

a boom actuator comprising a large chamber and a small chamber;

a recovery unit configured to receive fluid discharged from the large chamber and then recover energy;

a recovery line connecting the large chamber and the recovery unit;

an accumulator connected to the recovery line;

a jack-up assist line connecting the accumulator and the small chamber;

a jack-up assist valve disposed on the jack-up assist line to block flow of fluid from the accumulator to the small chamber in a first position and allow the flow of fluid from the accumulator to the small chamber in a second position; and

a controller configured to control movement of the jack-up assist valve,

wherein the controller is configured to:

determine whether or not the hydraulic machine is in a jack-up condition; and

when the hydraulic machine is determined to be in the jack-up condition, move the jack-up assist valve to the second position.

2. The hydraulic machine of claim 1 , further comprising a first sensor configured to measure a pressure in the accumulator,

wherein the controller controls movement of the jack-up assist to the second position such that the greater a value obtained by subtracting a pressure in the small chamber from the pressure in the accumulator measured by the first sensor is, the smaller the amount of the movement of the jack-up assist valve to the second position is.

3. The hydraulic machine of claim 1 , further comprising a first operator input device by which an operator-desired operating speed of the boom actuator is input,

wherein the controller controls movement of the jack-up assist valve to the second position such that the higher the operator-desired operating speed of the boom actuator, the greater the amount of the movement of the jack-up assist valve to the second position is.

4. The hydraulic machine of claim 1 , wherein the controller determines that the hydraulic machine is in the jack-up condition when a load pressure applied to the large chamber by a load is equal to or less than a threshold value.

5. The hydraulic machine of claim 4 , wherein the threshold value is in a range of 0 to 3 bars.

6. The hydraulic machine of claim 4 , wherein the load pressure is Pa−Pb/(Aa/Ab),

where Pa is pressure in the large chamber measured by a second sensor, Pb is pressure in the small chamber measured by a third sensor, Aa is an area of the large chamber, and Ab is an area of the small chamber.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 10, 2022
From: AHN, HOENGHWAN; JUNG, TAERANG; JOO, SANGKYU; YUN, SEONGGEUN; LEE, SEUNGHYUN; LEE, BYOUNGHO
To: VOLVO CONSTRUCTION EQUIPMENT AB
Reel/Frame 059883/0673 →
Priority Claims (1)
KR 10-2021-0062103 · May 13, 2021 · national
Continuity (1)
Related Publication 20220364327A1 · Nov 17, 2022