IP Library Granted Patent US 12,020,067
Granted Patent B2
US 12,020,067 · App. 17/746,862 · Granted Jun 25, 2024

Scheduling tasks using targeted pipelines

Inventors: Simon Nield (Kings Langley, GB); Yoong-Chert Foo (Kings Langley, GB); Adam de Grasse (Kings Langley, GB); Luca Iuliano (Kings Langley, GB)
Assignee: Imagination Technologies Limited
G06F9/4881G06F7/575G06F9/3001G06F9/3016G06F9/3836G06F9/3851G06F9/3867
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,020,067
App. No.
17/746,862
Granted
Jun 25, 2024
Kind
B2
Abstract

A method of scheduling instructions within a parallel processing unit is described. The method comprises decoding, in an instruction decoder, an instruction in a scheduled task in an active state, and checking, by an instruction controller, if an ALU targeted by the decoded instruction is a primary instruction pipeline. If the targeted ALU is a primary instruction pipeline, a list associated with the primary instruction pipeline is checked to determine whether the scheduled task is already included in the list. If the scheduled task is already included in the list, the decoded instruction is sent to the primary instruction pipeline.

Claims (53)

1. A method of scheduling instructions within a parallel processing unit, comprising:

decoding, in an instruction decoder, an instruction in a scheduled task for a targeted ALU (Arithmetic Logic Unit);

if the targeted ALU is identified as a primary instruction pipeline, determining whether the scheduled task is already associated with the primary instruction pipeline from data associated with the primary instruction pipeline and sending the decoded instruction to the primary instruction pipeline; and

if the targeted ALU is not identified as a primary instruction pipeline, sending the decoded instruction to the pipeline associated with the targeted ALU.

2. The method according to claim 1 , further comprising:

if the scheduled task is not already included in the data, determining if the data is full; and triggering the scheduler to de-activate the scheduled task by changing the scheduled task from the active state to a non-active state; and

if the scheduled task is not already included in the data and that the data is not full, adding the scheduled task to the data and sending the decoded instruction to the primary instruction pipeline.

3. The method according to claim 1 , further comprising:

if the targeted ALU is not a primary instruction pipeline, checking the data to determine whether the scheduled task is already included in the data; removing the scheduled task from the data; and sending the decoded instruction to the targeted ALU.

4. The method according to claim 1 , further comprising:

if the primary instruction pipeline is full; and if the data has changed from being full to not being full, triggering the scheduler to re-activate an oldest scheduled task waiting for the primary instruction pipeline by removing the oldest scheduled task from the waiting state.

5. The method according to claim 1 , further comprising:

if a particular scheduled task has been de-activated, checking if the particular scheduled task is included in the data and in response to determining that the particular scheduled task is included in the data, removing the particular scheduled task from the data associated with the primary instruction pipeline.

6. The method according to claim 1 , further comprising:

when a particular scheduled task completes, checking if the particular scheduled task is included in the data and in response to determining that the particular scheduled task is included in the data, removing the particular scheduled task from the data.

7. An instruction controller comprising:

an input for receiving an instruction in a scheduled task for a targeted ALU (Arithmetic Logic Unit);

an instruction decoder arranged to decode the received instruction;

a memory element arranged to store data associating scheduled tasks with a primary instruction pipeline in a parallel processing unit; and

hardware logic arranged to determine:

if the targeted ALU is identified as a primary instruction pipeline, whether the scheduled task is already associated with the primary instruction pipeline based on the data and to send the decoded instruction to the primary instruction pipeline; and

if the targeted ALU is not identified as a primary instruction pipeline, to send the decoded instruction to the pipeline associated with the targeted ALU.

8. The instruction controller according to claim 7 , wherein the data comprises the data associating the scheduled tasks with the primary instruction pipeline.

9. The instruction controller according to claim 8 , further comprising:

hardware logic arranged, if scheduled task is not already included in the data and if the data is full, to trigger de-activating hardware logic in the scheduler to de-activate the scheduled task by changing the scheduled task from the active state to a waiting state; and

if the scheduled task is not already included in the data and the data is not full, to add the scheduled task to the data and send the decoded instruction to the primary instruction pipeline.

10. The instruction controller according to claim 8 , further comprising:

hardware logic arranged, if the targeted ALU is not a primary instruction pipeline, to check the data to determine whether the scheduled task is already included in the data; and

if the scheduled task is already included in the data, remove the scheduled task from the data and send the decoded instruction to the targeted ALU.

11. The instruction controller according to claim 8 , further comprising:

hardware logic arranged, if the data is full and the data has changed from being full to not being full, to trigger the scheduler to re-activate an oldest scheduled task waiting for the primary instruction pipeline by removing the oldest scheduled task from the waiting state.

12. The instruction controller according to claim 8 , further comprising:

hardware logic arranged, if a particular scheduled task has been de-activated and if the particular scheduled task is included in the data, to remove the particular scheduled task from the data.

13. The instruction controller according to claim 8 , further comprising:

hardware logic arranged, if a particular scheduled task completes and the particular scheduled task is included in the data, to remove the particular scheduled task from the data.

14. A non-transitory computer readable storage medium having stored thereon a computer readable dataset description of an integrated circuit that, when processed in an integrated circuit manufacturing system, causes the integrated circuit manufacturing system to manufacture an instruction controller, the instruction controller comprising:

an input for receiving an instruction in a scheduled task for a targeted ALU (Arithmetic Logic Unit);

an instruction decoder arranged to decode the received instruction;

a memory element arranged to store data associating scheduled tasks with a primary instruction pipeline in a parallel processing unit; and

hardware logic arranged to determine:

if the targeted ALU is identified as a primary instruction pipeline, whether the scheduled task is already associated with the primary instruction pipeline and to send the decoded instruction to the primary instruction pipeline based on the data; and

if the targeted ALU is not identified as a primary instruction pipeline, to send the decoded instruction to the pipeline associated with the targeted ALU.

15. The non-transitory computer readable storage medium according to claim 14 , wherein the data comprises the data associating the scheduled tasks with the primary instruction pipeline.

16. The non-transitory computer readable storage medium according to claim 15 , further comprising:

hardware logic arranged, if scheduled task is not already included in the data and if the data is full, to trigger de-activating hardware logic in the scheduler to de-activate the scheduled task by changing the scheduled task from the active state to a waiting state; and

if the scheduled task is not already included in the data and the data is not full, to add the scheduled task to the data and send the decoded instruction to the primary instruction pipeline.

17. The non-transitory computer readable storage medium according to claim 15 , further comprising:

hardware logic arranged, if the targeted ALU is not a primary instruction pipeline, to check the data to determine whether the scheduled task is already included in the data; and

if the scheduled task is already included in the data, remove the scheduled task from the data and send the decoded instruction to the targeted ALU.

18. The non-transitory computer readable storage medium according to claim 15 , further comprising:

hardware logic arranged, if the data is full and the data has changed from being full to not being full, to trigger the scheduler to re-activate an oldest scheduled task waiting for the primary instruction pipeline by removing the oldest scheduled task from the waiting state.

19. The non-transitory computer readable storage medium according to claim 15 , further comprising:

hardware logic arranged, if a particular scheduled task has been de-activated and if the particular scheduled task is included in the data, to remove the particular scheduled task from the data.

Assignments (1)
SECURITY INTEREST Recorded Jul 31, 2024
From: IMAGINATION TECHNOLOGIES LIMITED
To: FORTRESS INVESTMENT GROUP (UK) LTD
Reel/Frame 068221/0001 →
Priority Claims (1)
GB 1709653 · Jun 16, 2017 · national
Continuity (3)
Continuation 17108526 · Dec 1, 2020
Continuation 16011093 · Jun 18, 2018
Related Publication 20220276895A1 · Sep 1, 2022