IP Library › Granted Patent US 12,150,076
Granted Patent B2
US 12,150,076 · App. 17/765,735 · Granted Nov 19, 2024

Synchronisation signaling for integrated access and backhaul nodes

Inventors: Yezi Huang (Täby, SE); Erik Dahlman (Stockholm, SE); Boris Dortschy (Hägersten, SE); Lei Bao (Gothenburg, SE)
Assignee: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
H04W56/0015H04B7/0695H04B7/088
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,150,076
App. No.
17/765,735
Granted
Nov 19, 2024
Kind
B2
Abstract

There is disclosed a method of operating an Integrated Access and Backhaul (IAB) node ( 200 , C, N 3 ) in a wireless communication network, the IAB node being in a communication link with a second IAB node using a signaling beam, the IAB node further being scheduled to perform beam sweeping with a plurality of synchronisation beams, one of the synchronisation beams corresponding to the signaling beam; wherein a synchronisation beam is scheduled to carry synchronisation signaling; and wherein the method comprises performing beam sweeping such that the synchronisation beam corresponding to the signaling beam carries information signaling replacing the synchronisation signaling at least in part. The disclosure also pertains to related methods and devices.

Claims (12)

1. Method of operating an Integrated Access and Backhaul (IAB) node in a wireless communication network, the IAB node being in a communication link with a second IAB node using a signaling beam, the IAB node further being scheduled to perform beam sweeping with a plurality of synchronisation beams, one of the synchronisation beams corresponding to the signaling beam; wherein a synchronisation beam is scheduled to carry synchronisation signaling; and wherein the method comprises performing beam sweeping such that the synchronisation beam corresponding to the signaling beam carries information signaling replacing the synchronisation signaling at least in part.

2. Program product comprising instructions adapted for causing processing circuitry to control and/or perform a method according to claim 1 .

3. Carrier medium arrangement carrying and/or storing a program product according to claim 2 .

4. Integrated Access and Backhaul (IAB) node for a wireless communication network, the IAB node being adapted for communicating in a communication link with a second IAB node using a signaling beam, the IAB node further being adapted for being scheduled to perform beam sweeping with a plurality of synchronisation beams, one of the synchronisation beams corresponding to the signaling beam; wherein a synchronisation beam is scheduled to carry synchronisation signaling; and wherein the IAB node is adapted for performing beam sweeping such that the synchronisation beam corresponding to the signaling beam carries information signaling replacing the synchronisation signaling at least in part.

5. The node according to claim 4 , wherein the communication link comprises a beam pair comprising the signaling beam.

6. The node according to claim 4 , wherein synchronisation signaling corresponds to and/or comprises SS/PBCH block signaling.

7. The node according to claim 4 , wherein the information signaling is transmitted on a resource structure corresponding to a resource structure used for synchronisation signaling.

8. The node according to claim 4 , wherein the information signaling indicates timing information, e.g. timing information pertaining to the communication link and/or to a southbound link of the IAB node.

9. The node according to claim 4 , wherein the information signaling replaces primary synchronisation signaling and/or secondary synchronisation signaling and/or demodulation reference signaling and/or broadcast channel signaling.

10. The node according to claim 4 , wherein the information signaling indicates power control information.

11. The node according to claim 4 , wherein the information signaling is transmitted using the same modulation as the synchronisation signaling.

12. The node according to claim 4 , wherein the information signaling indicates a resource misalignment parameter.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 31, 2022
From: BAO, LEI; DAHLMAN, ERIK; DORTSCHY, BORIS; HUANG, YEZI
To: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
Reel/Frame 059462/0583 →
Continuity (1)
Related Publication 20220346046A1 · Oct 27, 2022
Cited By (1)
US 12,362,797