IP Library › Granted Patent US 12,291,994
Granted Patent B2
US 12,291,994 · App. 17/769,401 · Granted May 6, 2025

Power plant system and method of operating the same

Inventor: Tobias Rether (Berlin, DE)
Assignee: Siemens Energy Global GmbH & Co. KG
F02C3/34F02C6/18H01M8/0618H01M2008/1293
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,291,994
App. No.
17/769,401
Granted
May 6, 2025
Kind
B2
Abstract

Power plant system and method of operating the same, the power plant system having a solid oxide fuel cell and a gas turbine, wherein the fuel cell and the gas turbine are set up such that compressed charge air of a compressor of the gas turbine can be provided to the fuel cell and/or an exhaust gas of the fuel cell can be provided to a combustion chamber of the gas turbine, wherein the system is configured such that the solid oxide fuel cell can be operated in a cell mode as well as in an electrolysis mode and wherein the solid oxide fuel cell is set up such that an excess grid energy is used for executing an electrolysis in the electrolysis mode of the fuel cell and thereby to chemically reduce water and/or carbon dioxide into hydrogen and/or syngas.

Claims (19)

1. A power plant system, comprising:

a single solid oxide fuel cell and a gas turbine,

wherein the single solid oxide fuel cell and the gas turbine are set up such that compressed charge air of a compressor of the gas turbine is provided to the solid oxide fuel cell and/or an exhaust gas of the solid oxide fuel cell is provided to a combustion chamber of the gas turbine,

wherein the power plant system is configured such that the single solid oxide fuel cell is operated in a load or cell mode as well as in an electrolysis mode and wherein the single solid oxide fuel cell is set up such that an excess grid energy is used for executing an electrolysis in the electrolysis mode of the solid oxide fuel cell and thereby to chemically reduce water and/or carbon dioxide into hydrogen and/or syngas.

2. The power plant system as claimed in claim 1 , further comprising:

a steam turbine being functionally coupled to the gas turbine such that a combined-cycle plant operation is facilitated.

3. A method of operating a power plant system as claimed in claim 1 , comprising:

operating the solid oxide fuel cell in a load or a cell mode.

4. A method of operating a power plant system as claimed in claim 1 , operating the solid oxide fuel cell in an electrolysis mode.

5. The method of operating a power plant system as claimed in claim 3 , further comprising:

using an excess grid energy for executing an electrolysis in the electrolysis mode of the solid oxide fuel cell and thereby to chemically reduce water and/or carbon dioxide into hydrogen and syngas.

6. The method of operating a power plant system as claimed in claim 5 , further comprising:

operating the solid oxide fuel cell in an ambient of compressed charge air being generated by the compressor of the gas turbine.

7. The method of operating a power plant system as claimed in claim 3 , further comprising:

providing an exhaust gas of the solid oxide fuel cell still containing a fuel to the combustion chamber of the gas turbine.

8. The method of operating a power plant system as claimed in claim 4 , further comprising:

applying a Sabatier reaction to the syngas in order to provide methane.

9. The method of operating a power plant system as claimed in claim 8 , further comprising:

using waste heat from the Sabatier reaction for thermally regulating the solid oxide fuel cell.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 6, 2022
From: RETHER, TOBIAS
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 061336/0426 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 6, 2022
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 061336/0465 →
Priority Claims (1)
EP 19205050 · Oct 24, 2019 · regional
Continuity (1)
Related Publication 20240125269A1 · Apr 18, 2024
References Cited (7)
US 5413879A · Domeracki et al. · 1995 [cited by applicant]
US 20040191595A1 · McElroy · 2004 [cited by examiner]
US 20050048334A1 · Sridhar et al. · 2005 [cited by applicant]
US 20080314741A1 · Balestrino · 2008 [cited by examiner]
US 20210143645A1 · Uechi · 2021 [cited by examiner]
WO 9827004A1 · 1998 [cited by applicant]
PCT International Search Report and Written Opinion of International Searching Authority mailed Feb. 16, 2021 1 corresponding to PCT International Application No. PCT/EP2020/079844 filed Oct. 23, 2020. [cited by applicant]