IP Library › Granted Patent US 12,289,674
Granted Patent B2
US 12,289,674 · App. 17/789,125 · Granted Apr 29, 2025

User equipment (UE)

Inventor: Yasuo Sugawara (Sakai, JP)
Assignee: SHARP KABUSHIKI KAISHA
H04W48/18H04W24/04H04W28/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,289,674
App. No.
17/789,125
Granted
Apr 29, 2025
Kind
B2
Abstract

A User Equipment (UE) comprises control circuitry and transmission and reception circuitry. The transmission and reception circuitry is configured to receive, from an Access and Mobility Management Function (AMF), a first configuration update command message including a rejected Network Slice Selection Assistance Information (NSSAI) including a Single Network Slice Selection Assistance Information for which a maximum number of UEs has been reached, a cause value indicating that the S-NSSAI is not available due to the maximum number of UEs being reached, and a back-off timer value for the S-NSSAI. The control circuitry is configured to start a timer with the back-off timer value for the S-NSSAI. The transmission and reception circuitry is further configured not to attempt to use the S-NSSAI while the back-off timer is running.

Claims (8)

1. A User Equipment (UE) comprising:

control circuitry; and

transmission and reception circuitry;

wherein

the transmission and reception circuitry is configured to receive, from an Access and Mobility Management Function (AMF), a first configuration update command message including a rejected Network Slice Selection Assistance Information (NSSAI) including a Single Network Slice Selection Assistance Information (S-NSSAI) for which a maximum number of UEs has been reached, a cause value indicating that the S-NSSAI is not available due to the maximum number of UEs being reached, and a back-off timer value for the S-NSSAI,

the control circuitry is configured to start a timer with the back-off timer value for the S-NSSAI, and

the transmission and reception circuitry is further configured not to attempt to use the S-NSSAI while the back-off timer is running.

2. The UE according to claim 1 , wherein the transmission and reception circuitry is further configured to receive the S-NSSAI included in an allowed NSSAI in a registration accept message or a second configuration update command message before reaching the maximum number of UEs for the S-NSSAI.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2022
From: SUGAWARA, YASUO
To: SHARP KABUSHIKI KAISHA
Reel/Frame 060311/0425 →
Priority Claims (1)
JP 2019-238126 · Dec 27, 2019 · national
Continuity (1)
Related Publication 20230053127A1 · Feb 16, 2023
References Cited (19)
US 20190029065A1 · Park · 2019 [cited by examiner]
US 20190200285A1 · Velev · 2019 [cited by examiner]
US 20190223093A1 · Watfa · 2019 [cited by examiner]
US 20190261185A1 · Velev · 2019 [cited by examiner]
US 20190306823A1 · Babu · 2019 [cited by examiner]
US 20190373441A1 · Ryu · 2019 [cited by examiner]
US 20200196130A1 · Tamura · 2020 [cited by examiner]
US 20200322879A1 · Zhu et al. · 2020 [cited by applicant]
US 20200367149A1 · Kang · 2020 [cited by examiner]
US 20200413241A1 · Park · 2020 [cited by examiner]
US 20210014781A1 · Ianev · 2021 [cited by examiner]
US 20210051515A1 · Huang-Fu · 2021 [cited by examiner]
US 20210051516A1 · Huang-Fu · 2021 [cited by examiner]
US 20210084529A1 · Chiba · 2021 [cited by examiner]
CN 109951877A · 2019 [cited by applicant]
3GPP TS 23.501 V16.3.0 (Dec. 2019) 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; System architecture for the 5G System (5GS); Stage 2 (Release 16). [cited by applicant]
3GPP TS 23.502 V16.3.0 (Dec. 2019) Brd Generation Partnership Project; Technical Specification Group Services and System Aspects; Procedures for the 5G System (5GS); Stage 2 (Release 16). [cited by applicant]
3GPP TS 24.501 V16.3.0 (Dec. 2019) 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Non-Access-Stratum (NAS) protocol for 5G System (5GS); Stage 3 (Release 16). [cited by applicant]
3GPP TR 23.700-40 V0.2.0 (Dec. 2019) 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on Enhancement of Network Slicing Phase 2 (Release 17). [cited by applicant]
Cited By (1)
US 12,672,054