IP Library › Granted Patent US 12,241,925
Granted Patent B2
US 12,241,925 · App. 17/789,468 · Granted Mar 4, 2025

Arc fault detection modules for vehicle electrical systems

Inventors: Chaitanya Bhalwankar (Pune, IN); Ritika Shetty (Pune, IN); Brandon William Fisher (Portland, OR); Kumar Prasad Telikepalli (Pune, IN); Naresh Kumar Kodela (Pune, IN)
Assignee: EATON INTELLIGENT POWER LIMITED
G01R31/007G01R31/1272
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,241,925
App. No.
17/789,468
Granted
Mar 4, 2025
Kind
B2
Abstract

Arc fault detection modules for vehicles intended to supervise circuits and detect arc fault conditions in both alternating current and direct current circuits. A number of these arc fault detection modules may be integrated into a vehicle's electrical system in strategic locations. Each arc fault module contains sensing capabilities for monitoring the circuit, and may also include signal conditioning capabilities, processing capabilities for determining the occurrence of an arc fault, contactors for disabling the supervised circuit, and communications capabilities to interact with other vehicle components and telematics systems. As a result arc fault detection odules can be customized to leverage existing features of a vehicle's electrical system or to provide fully redundant arc fault protection.

Claims (19)

1. A vehicle electric system comprising:

one or more circuits, the one or more circuits comprising a plurality of modules, each module of the plurality of modules, comprising:

an arc fault detection unit comprising:

one or more sensors configured for monitoring an alternating current circuit or a direct current circuit for signs of an arc fault and configured for outputting arc fault data, and

a signal conditioning circuitry for receiving and translating arc fault data for processing,

a processing unit connected directly or indirectly to the signal conditioning circuitry, the processing unit configured to receive arc fault data from the signal conditioning circuitry and configured to identify an arc fault condition, and

a notification device connected to the processing unit, the notification device configured to notify a supervisory controller of an arc fault and configured to communicate other data to the supervisory controller, and

the supervisory controller networked to the plurality of modules,

wherein the vehicle electric system is configured with a plurality of remote contactors,

wherein each module of the plurality of modules is configured to supervise respective one of the alternating current circuit or direct current circuit to collect and process arc fault data;

wherein each module of the plurality of modules is configured to transmit arc fault detection data to the supervisory controller; and

wherein the supervisory controller is programmed to manage current flow in the vehicle electrical system by commanding one or more of the remote contactors to open, disabling current flow to the one or more circuits, when an arc fault condition is detected.

2. The vehicle electric system of claim 1 , wherein the processing unit is connected directly to the signal conditioning circuitry in the arc fault detection unit.

3. The vehicle electric system of claim 2 , wherein the notification device is connected to the arc fault detection unit.

4. The vehicle electric system of claim 1 , wherein the processing unit is an external circuit from the arc fault detection unit.

5. The modulevehicle electric system of claim 1 , further comprising a contactor directly or indirectly connected to the processing unit, the contactor configured to interrupt a flow of current through the monitored circuit when an arc fault condition is identified.

6. The vehicle electric system of claim 5 , wherein the processing unit is a microcontroller, and wherein the microcontroller is configured to command the notification device to indicate an operational status or a non-operational status; and wherein the microcontroller is configured to command the contactor to interrupt a flow of the alternating current circuit or direct current through the circuit monitored by the arc fault detection unit.

7. The vehicle electric system of claim 5 , wherein the processing unit comprises a centralized electronic control unit, wherein the centralized electronic control unit is configured to receive and process signal data from other controllers connected to the power distribution system of the vehicle, and wherein the centralized electronic control unit is configured to receive and process the arc fault data and to transmit a command to the notification device to indicate an operational status or a non-operational status and is configured to transmit a command to the contactor to interrupt a flow of alternating the current circuit or direct current through the circuit monitored by the arc fault detection unit.

8. The vehicle electric system of claim 1 wherein the one of the alternating current circuit or direct current circuit comprises a direct or indirect connection to a powered unit, and wherein the powered unit comprises one of an On-Board Charger, an inverter, or a DC-DC converter.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 27, 2022
From: BHALWANKAR, CHAITANYA; SHETTY, RITIKA; FISHER, BRANDON WILLIAM; TELIKEPALLI, KUMAR PRASAD; KODELA, NARESH KUMAR
To: EATON INTELLIGENT POWER LIMITED
Reel/Frame 061231/0672 →
Priority Claims (2)
IN 201911054197 · Dec 27, 2019 · national
IN 202011048605 · Nov 6, 2020 · national
Continuity (1)
Related Publication 20230034902A1 · Feb 2, 2023
References Cited (49)
US 6057997A · Mackenzie et al. · 2000 [cited by applicant]
US 6567759B2 · Dollar, II · 2003 [cited by applicant]
US 6577138B2 · Zuercher et al. · 2003 [cited by applicant]
US 6594125B2 · Dollar, II · 2003 [cited by applicant]
US 6633824B2 · Dollar, II · 2003 [cited by applicant]
US 6782329B2 · Scott · 2004 [cited by applicant]
US 7177125B2 · Lazarovich et al. · 2007 [cited by applicant]
US 7205772B2 · Naidu et al. · 2007 [cited by applicant]
US 7406370B2 · Kojori et al. · 2008 [cited by applicant]
US 7460344B2 · Hastings et al. · 2008 [cited by applicant]
US 8218274B2 · Hastings et al. · 2012 [cited by applicant]
US 8289664B2 · Haines et al. · 2012 [cited by applicant]
US 8335062B2 · Haines et al. · 2012 [cited by applicant]
US 9606165B2 · Chatroux et al. · 2017 [cited by applicant]
US 9612267B2 · Kolker et al. · 2017 [cited by applicant]
US 9768605B2 · Kolker et al. · 2017 [cited by applicant]
US 9797940B2 · Kolker et al. · 2017 [cited by applicant]
US 9797941B2 · Kolker et al. · 2017 [cited by applicant]
US 9933463B2 · Danesh et al. · 2018 [cited by applicant]
US 9941683B2 · Olivas et al. · 2018 [cited by applicant]
US 9948087B2 · Haines et al. · 2018 [cited by applicant]
US 20040156154A1 · Lazarovich et al. · 2004 [cited by applicant]
US 20040263183A1 · Naidu et al. · 2004 [cited by applicant]
US 20050017731A1 · Zuercher et al. · 2005 [cited by applicant]
US 20050057261A1 · Hale et al. · 2005 [cited by applicant]
US 20060200688A1 · Tofigh et al. · 2006 [cited by applicant]
US 20060214670A1 · Naidu et al. · 2006 [cited by applicant]
US 20060291109A1 · Wang · 2006 [cited by applicant]
US 20080129307A1 · Yu · 2008 [cited by applicant]
US 20100214703A1 · Tofigh et al. · 2010 [cited by applicant]
US 20120206844A1 · Tofigh et al. · 2012 [cited by applicant]
US 20150194798A1 · Ward · 2015 [cited by applicant]
US 20160341769A1 · Danesh · 2016 [cited by examiner]
US 20180269013A1 · Thompson · 2018 [cited by examiner]
CN 103548226A · 2014 [cited by applicant]
CN 103869226A · 2014 [cited by applicant]
CN 103913663A · 2014 [cited by applicant]
CN 104428160A · 2015 [cited by applicant]
CN 204424865U · 2015 [cited by applicant]
CN 106696705A · 2017 [cited by applicant]
CN 107234969A · 2017 [cited by applicant]
CN 108528241A · 2018 [cited by applicant]
CN 108646724A · 2018 [cited by applicant]
DE 102017004157A1 · 2017 [cited by applicant]
DE 102016219855A1 · 2018 [cited by applicant]
EP 2711236A2 · 2014 [cited by applicant]
GB 2479418A · 2011 [cited by applicant]
WO 2017201125A1 · 2017 [cited by applicant]
International Search Report and Written Opinion for PCT/EP2020/025600; mailed Apr. 12, 2021; pp. 1-11. [cited by applicant]