IP Library Granted Patent US 12,188,679
Granted Patent B2
US 12,188,679 · App. 17/821,771 · Granted Jan 7, 2025

Pre-fabricated modular fire-rated conduit assembly

Inventor: William Christopher Duffy (Thornhill, CA)
Assignee: VAUGHANAIR CANADA ULC
F24F13/0263F16L59/143F24F13/0209F24F13/0272F24F13/0281
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,188,679
App. No.
17/821,771
Granted
Jan 7, 2025
Kind
B2
Abstract

A modular fire-rated conduit or duct assembly suitable for applications such as ventilation systems in a multi-floor or multi-room building. According to an embodiment, the modular fire-rated conduit assembly comprises two or more duct or conduit sections, each of the duct sections includes an inner duct liner and an outer casing, and a plurality of casing spacers configured to form a thermal insulating cavity between at least a portion of space between the inner duct liner and the outer casing, and the thermal insulating cavity is configured to receive a thermal material, a first exterior flange connector is attached to one end of each of the inner duct liners, a second exterior flange connector attached to another end of each of the inner duct liners, the first and the second exterior flange connectors are configured to form an assembly junction for coupling respective ends of the duct or conduit sections to form a connected run of the conduit or duct sections, and a joint connection end is formed between the exterior flange connector and the outer casing, and the joint connection end is configured to receive a joint insulating material, and further includes a return configured to receive a connection edge of a joint cover, and the joint cover is configured to encapsulate the joint connection ends of adjacent duct sections modules.

Claims (31)

1. A modular conduit assembly utilizing a fire-barrier structure, said conduit assembly comprising:

two or more duct sections;

each of said duct sections having three walls, comprising first and second side walls and an outer wall, and being joined to form a three-sided configuration with an open side;

each of said first side wall and said second side wall having a mounting channel, said mounting channel being configured to provide a mounting surface for mounting said respective side wall to the fire-barrier structure, so that said open side is enclosed by the fire-barrier structure;

each of said duct sections having an inner duct liner and an outer casing;

a first exterior flange connector attached to one end of each of said inner duct liners;

a second exterior flange connector attached to another end of each of said inner duct liners; and

said first and said second exterior flange connectors being configured to form an assembly junction for coupling respective ends of said duct sections to form a connected run of said duct sections.

2. The modular conduit assembly as claimed in claim 1 , wherein each of said duct sections includes a plurality of casing spacers configured to form a thermal insulating cavity between at least a portion of space between said inner duct liner and said outer casing, said thermal insulating cavity being configured for receiving a thermal material.

3. The modular conduit assembly as claimed in claim 2 , wherein said inner duct liner is formed from a metallic material having a thickness for providing a specified fire-rating.

4. The modular conduit assembly as claimed in claim 3 , further including a joint connection end formed between said exterior flange connector and said outer casing, said joint connection end being configured to receive a joint insulating material, and further comprising a return configured for receiving a connection edge of a joint cover, said joint cover being configured to encapsulate said joint connection ends of adjacent duct sections modules.

5. The modular conduit assembly as claimed in claim 4 , further including a joint cover configured for sealing said mounting channel.

6. The modular conduit assembly as claimed in claim 1 , wherein

each of said duct sections comprise first and second side walls joined to form a two-sided configuration;

the fire-barrier comprising a first surface and a second surface oriented at an approximately right angle;

each of said first side wall and said second side wall having a mounting channel, said mounting channel for said first side wall being configured to provide a mounting surface for mounting said first side wall to the first surface of the fire-barrier structure, and said mounting channel for said second side wall being configured to provide a mounting surface for mounting said second side wall to the second surface of the fire-barrier structure;

a first exterior flange connector attached to one end of each of said inner duct liners;

a second exterior flange connector attached to another end of each of said inner duct liners; and

said first and said second exterior flange connectors being configured to form an assembly junction for coupling respective ends of said duct sections to form a connected run of said duct sections.

7. The modular conduit assembly as claimed in claim 6 , wherein each of said duct sections includes a plurality of casing spacers configured to form a thermal insulating cavity between at least a portion of space between said inner duct liner and said outer casing, said thermal insulating cavity being configured for receiving a thermal material.

8. The modular conduit assembly as claimed in claim 7 , wherein said inner duct liner is formed from a metallic material having a thickness for providing a specified fire-rating.

9. The modular conduit assembly as claimed in claim 8 , further including a joint cover configured for sealing said mounting channel.

10. The modular conduit assembly as claimed in claim 1 , wherein

each of said duct sections comprise a single wall section;

the fire-barrier comprising a first wall, a second wall and a base configured to form a channel with an open end;

said single wall section having first and second mounting channels, said first mounting channel being configured to provide a mounting surface for mounting one side of said single wall section to a surface of said first wall of the fire-barrier structure, and said second mounting channel being configured to provide a mounting surface for mounting the other side of said single wall section to a surface of said second wall of the fire-barrier structure;

a first exterior flange connector attached to one end of each of said inner duct liners;

a second exterior flange connector attached to another end of each of said inner duct liners; and

said first and said second exterior flange connectors being configured to form an assembly junction for coupling respective ends of said duct sections to form a connected run of said duct sections.

11. The modular conduit assembly as claimed in claim 10 , wherein said duct section includes a plurality of casing spacers configured to form a thermal insulating cavity between at least a portion of space between said inner duct liner and said outer casing, said thermal insulating cavity being configured for receiving a thermal material.

12. The modular conduit assembly as claimed in claim 11 , wherein said inner duct liner is formed from a metallic material having a thickness for providing a specified fire-rating.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 31, 2024
From: DURASYSTEMS BARRIERS INC.
To: VAUGHANAIR CANADA ULC
Reel/Frame 068137/0383 →
SECURITY AGREEMENT Recorded Jun 27, 2024
From: VAUGHANAIR CANADA ULC
To: M&T BANK
Reel/Frame 067944/0532 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 25, 2022
From: DUFFY, WILLIAM CHRISTOPHER
To: DURASYSTEMS BARRIERS INC.
Reel/Frame 060905/0443 →
Continuity (2)
Division 15820275 · Nov 21, 2017
Related Publication 20220404063A1 · Dec 22, 2022
References Cited (38)
US 2123410A · Fawcett · 1938 [cited by examiner]
US 2870623A · Murray · 1959 [cited by examiner]
US 2916054A · Callan · 1959 [cited by applicant]
US 3690243A · Lambert · 1972 [cited by examiner]
US 3827202A · Phillips · 1974 [cited by examiner]
US 3835606A · Liberman · 1974 [cited by examiner]
US 3918354A · Lambert · 1975 [cited by examiner]
US 4029344A · Stone · 1977 [cited by applicant]
US 4294054A · Kuhr · 1981 [cited by examiner]
US 4441402A · Harris · 1984 [cited by examiner]
US 4724750A · Coleman · 1988 [cited by applicant]
US 5743054A · Luchetti · 1998 [cited by examiner]
US 6231704B1 · Carpinetti · 2001 [cited by examiner]
US 7699078B1 · Husmann · 2010 [cited by applicant]
US 9074788B2 · Duffy · 2015 [cited by applicant]
US 9371941B1 · Faverio · 2016 [cited by applicant]
US 11441810B2 · Duffy · 2022 [cited by applicant]
US 20030051764A1 · Jungers · 2003 [cited by applicant]
US 20050116470A1 · Duffy · 2005 [cited by applicant]
US 20100201122A1 · Zhi · 2010 [cited by examiner]
US 20110194894A1 · Seraphinoff · 2011 [cited by applicant]
US 20110274886A1 · Flennert · 2011 [cited by examiner]
US 20130174934A1 · Duffy · 2013 [cited by applicant]
US 20140154478A1 · Fellinger · 2014 [cited by examiner]
US 20140271972A1 · Lanciaux · 2014 [cited by examiner]
US 20150101697A1 · Duffy · 2015 [cited by applicant]
US 20180087700A1 · Plantz · 2018 [cited by applicant]
US 20190154295A1 · Duffy · 2019 [cited by applicant]
CA 2829645 · 2015 [cited by applicant]
CN 2233059 · 1996 [cited by applicant]
Canadian Office Action for Application No. 2,800,362 dated Feb. 27, 2019. [cited by applicant]
Canadian Office Action for Application No. 2,800,362 dated Nov. 7, 2019. [cited by applicant]
Canadian Office Action for Application No. 2,829,645 dated Oct. 18, 2019. [cited by applicant]
Final Office Action received for U.S. Appl. No. 15/820,275, mailed on Aug. 20, 2021, 9 pages. [cited by applicant]
Final Office Action received for U.S. Appl. No. 15/820,275, mailed on Feb. 4, 2022, 5 pages. [cited by applicant]
International Search Report and Written Opinion for PCT/CA2018/051473 dated Feb. 13, 2019. [cited by applicant]
Notice of Allowance and Fees Due (PTOL-85) Mailed on Apr. 18, 2022 for U.S. Appl. No. 15/820,275 5 pages. [cited by applicant]
Notice of Allowance received for U.S. Appl. No. 15/820,275, mailed on Jun. 2, 2022, 2 pages. [cited by applicant]