IP Library › Granted Patent US 12,150,470
Granted Patent B2
US 12,150,470 · App. 17/859,136 · Granted Nov 26, 2024

Methods for filling cavities in a mould member

Inventor: Hendrikus Petrus Gerardus Van Gerwen (Someren, NL)
Assignee: GEA Food Solutions Bakel B.V.
A23P30/10A22C7/0069A22C7/0076A22C7/0084
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,150,470
App. No.
17/859,136
Granted
Nov 26, 2024
Kind
B2
Abstract

This invention relates to a method for moulding products from a mass of food stuff, comprising: —moving a mould cavity, which is part of a mould member past a feed channel which fills the mass into the cavity, wherein the feed channel is connected to a feed pump which pumps the mass through the feed channel into the cavities. —determining and/or detecting the position of the mould cavity relative to the feed channel, controlling the desired set pressure of the pump.

Claims (10)

1. A method for moulding products from a mass of food stuff, the method comprising:

moving a mould cavity, which is part of a mould member, past a feed channel, the feed channel is connected to a feed pump that pumps the mass of food stuff through the feed channel and into the mould cavity,

determining and/or detecting a position of the mould cavity relative to the feed channel,

controlling the feed pump,

wherein filling of the mould cavity is partially carried out by controlling a pressure of the feed pump and partially by controlling a displaced volume of the feed pump and/or a flow rate of the feed pump, and

during the filling, the method comprises: increasing a desired set pressure based on the position of the mould cavity relative to the feed channel while the mould cavity is being filled and then decreasing the desired set pressure based on the position of the mould cavity relative to the feed channel while the mould cavity is being filled.

2. The method according to claim 1 , wherein the mould cavity is firstly filled by controlling the displaced volume of the feed pump and/or the flow rate of the feed pump and then by controlling the pressure of the feed pump.

3. The method according to claim 1 , wherein the flow rate of the feed pump is not constant during the filling of the mould cavity.

4. The method according to claim 1 , wherein a volume of the mass of food stuff already filled in the mould cavity is measured at least once during the filling.

5. The method according to claim 4 , wherein a flow rate of the mass of food stuff is adjusted based upon the measured volume of the mass of food stuff.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 7, 2022
From: VAN GERWEN, HENDRIKUS PETRUS GERARDUS
To: GEA FOOD SOLUTIONS BAKEL B.V.
Reel/Frame 060428/0928 →
Priority Claims (1)
EP 13195369 · Dec 2, 2013 · regional
Continuity (2)
Division 15035664
Related Publication 20220338527A1 · Oct 27, 2022