IP Library Granted Patent US 11,834,275
Granted Patent B1
US 11,834,275 · App. 17/864,988 · Granted Dec 5, 2023

Chain slack adjustment mechanism for mail sortation systems

Inventor: Fred Ayala (Fort Worth, TX)
Assignee: National Presort, LLC
B65G23/44B07C3/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,834,275
App. No.
17/864,988
Granted
Dec 5, 2023
Kind
B1
Abstract

A mail sortation system includes a frame system, a conveyor carried by the frame system, a driven axle on one end of the conveyor, a pair of split idler axles, one idler axel on each side of the conveyor, a chain from each idler axel to the driven axel, and a chain slack adjustment mechanism. The idler axels are configured to rotate independently of each other. The chains are coupled to the conveyor, such that rotation of the driven axle causes the idler axles to rotate and the conveyor to translate. The chain slack adjustment mechanisms remove slack in each chain by increasing the distance between the driven axle and the idler axles.

Claims (54)

1. A mail sortation system, comprising:

a frame system;

a conveyor carried by the frame system;

a driven axle on one end of the conveyor, the driven axle having driven axle chain sprockets on each side of the conveyor;

a pair of split idler axles, each idler axle having idler axel chain sprockets;

a chain on each side of the conveyor, and

a chain slack adjustment mechanism for removing slack in each chain;

wherein each chain may be individually adjusted and tensioned independently.

2. The mail sortation system of claim 1 , wherein the chain slack adjustment mechanism is adjusted in a sliding fashion.

3. The mail sortation system of claim 1 , wherein the distance between the driven axle and the idler axles is manually adjusted by actuating the chain slack adjustment mechanism manually.

4. The mail sortation system of claim 1 , wherein the distance between the driven axle and the idler axles is adjusted by the chain slack adjustment mechanism automatically.

5. The mail sortation system of claim 1 , wherein the chain slack adjustment mechanism can be used while the mail sortation system is in use.

6. The mail sortation system of claim 1 , wherein the actuation of chain slack adjustment mechanism minimizes wear on the chains.

7. The mail sortation system of claim 1 , wherein each chain slack adjustment mechanism comprises:

at least one side rail coupled to the frame system; and

a slide assembly slidingly coupled to the side rail;

wherein the idler axle slides relative to the frame system in response to movement of the slide assembly.

8. The mail sortation system of claim 7 , wherein each chain slack adjustment mechanism further comprises:

an adjustable tensioning rod assembly mounted to the slide assembly and the side rail.

9. The mail sortation system of claim 8 , wherein each chain slack adjustment mechanism further comprises:

a tension spring operably associated with the tensioning rod.

10. The mail sortation system of claim 8 , wherein each chain slack adjustment mechanism further comprises:

a position sensor.

11. The mail sortation system of claim 8 , wherein each chain slack adjustment mechanism further comprises:

an end stop travel adjustment assembly.

12. The mail sortation system of claim 1 , further comprising:

a control system.

13. A chain slack adjustment mechanism for adjusting slack in a chain of a mail sortation system having a frame, the chain slack adjustment mechanism comprising:

at least one side rail coupled to the frame;

a slide assembly slidingly coupled to the side rail;

an idler axle coupled to the slide assembly;

wherein the idler axle slides relative to the frame;

wherein each chain may be individually adjusted and tensioned independently.

14. The chain slack adjustment mechanism of claim 13 , further comprising:

an adjustable tensioning rod assembly mounted to the slide assembly and the side rail.

15. The chain slack adjustment mechanism of claim 14 , further comprising:

a tension spring operably associated with the tensioning rod.

16. The chain slack adjustment mechanism of claim 14 , further comprising:

a position sensor.

17. The chain slack adjustment mechanism of claim 13 , further comprising:

an end stop travel adjustment assembly.

18. The chain slack adjustment mechanism of claim 13 , further comprising:

a control system.

19. A mail sortation system, comprising:

a frame system;

a conveyor carried by the frame system;

a driven axle on one end of the conveyor, the driven axle having a driven axle belt pulley on each side of the conveyor;

a pair of split idler axles, the idler axles being on an opposite end of the conveyor from the driven axle, each idler axle having an idler axel belt pulley;

a belt on each side of the conveyor, each belt being coupled to the conveyor;

a belt slack adjustment mechanism for removing slack in each belt;

wherein the slack in each belt is removed by the belt slack adjustment mechanism by increasing the distance between the driven axle and the idler axles;

wherein each belt may be individually adjusted and tensioned independently.

20. The mail sortation system of claim 19 , further comprising:

an adjustable tensioning rod assembly coupled to each belt slack adjustment mechanism.

Assignments (2)
MERGER AND CHANGE OF NAME Recorded Oct 27, 2023
From: NATIONAL PRESORT, L.P.; NATIONAL PRESORT, LLC
To: NATIONAL PRESORT, LLC
Reel/Frame 065385/0632 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 22, 2022
From: AYALA, FRED
To: NATIONAL PRESORT, L.P.
Reel/Frame 060594/0565 →
Continuity (1)
Continuation 17173377 · Feb 11, 2021