IP Library Granted Patent US 12,538,249
Granted Patent B2
US 12,538,249 · App. 17/882,083 · Granted Jan 27, 2026

Multi-USIM operation in user equipment

Inventors: Mahmoud Watfa (Middlesex, GB); Lalith Kumar (Bangalore, IN)
Assignee: Samsung Electronics Co., Ltd.
H04W60/00H04W88/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,538,249
App. No.
17/882,083
Granted
Jan 27, 2026
Kind
B2
Abstract

The disclosure relates to 5th generation (5G) and/or 6th generation (6G) communication system for supporting a higher data transmission rate. A method is provided of operating a user equipment (UE) with multi universal subscriber identity module (M-USIM) capability in a wireless communication system. The method includes performing a registration procedure with respect to a connected telecommunication network if the UE is in a non-allowed area and encounters or receives a trigger for a network access stratum (NAS) procedure related to an M-USIM feature.

Claims (50)

1 . A method performed by a user equipment (UE) in a wireless communication system, the method comprising:

identifying that a mobility management back off (BO) timer is running;

identifying that the UE supporting a multi-universal subscriber identity module (MUSIM) is in an evolved packet system (EPS) mobility management (EMM)-connected mode or a fifth generation system (5GS) mobility management (5GMM)-connected mode, and the UE is to transmit a first non-access stratum (NAS) message; and

starting a first service request procedure to transmit the first NAS message for requesting a network entity for managing mobility to release a connection while the mobility management BO timer is running.

2 . The method of claim 1 , further comprising:

identifying that a service gap control (SGC) timer is running;

identifying that the UE supporting the MUSIM is in the EMM-connected mode, and the UE is to transmit a second NAS message to the network entity; and

starting a second service request procedure to transmit the second NAS message to the network entity while the SGC timer is running.

3 . The method of claim 1 , further comprising:

identifying that a service gap control (SGC) timer is running;

identifying that the UE supporting the MUSIM is in the 5GMM-connected mode with a radio resource control (RRC) inactive indication, and the UE is to transmit a second NAS message to the network entity; and

starting a second service request procedure to transmit the second NAS message to the network entity while the SGC timer is running.

4 . The method of claim 1 , further comprising:

receiving, from the network entity via a base station, service area restriction information including information on a non-allowed area; and

transmitting, to the network entity via the base station, a registration request for removing a paging restriction, based on removal of the paging restriction being required while the UE supporting the MUSIM is in a state in which a cell the UE camps on is in the non-allowed area.

5 . A user equipment (UE) in a wireless communication system, the UE comprising:

a transceiver; and

a controller coupled with the transceiver and configured to:

identify that a mobility management back off (BO) timer is running,

identify that the UE supporting a multi-universal subscriber identity module (MUSIM) is in an evolved packet system (EPS) mobility management (EMM)-connected mode or a fifth generation system (5GS) mobility management (5GMM)-connected mode, and the UE is to transmit a first non-access stratum (NAS) message, and

start a first service request procedure to transmit the first NAS message for requesting a network entity for managing mobility to release a connection while the mobility management BO timer is running.

6 . The UE of claim 5 , wherein the controller is further configured to:

identify that a service gap control (SGC) timer is running,

identify that the UE supporting the MUSIM is in the EMM-connected mode, and the UE is to transmit a second NAS message to the network entity, and

start a second service request procedure to transmit the second NAS message to the network entity while the SGC timer is running.

7 . The UE of claim 5 , wherein the controller is further configured to:

identify that a service gap control (SGC) timer is running,

identify that the UE supporting the MUSIM is in the 5GMM-connected mode with a radio resource control (RRC) inactive indication, and the UE is to transmit a second NAS message to the network entity, and

start a second service request procedure to transmit the second NAS message to the network entity while the SGC timer is running.

8 . The UE of claim 5 , wherein the controller is further configured to:

receive, from the network entity via a base station, service area restriction information including information on a non-allowed area, and

transmit, to the network entity via the base station, a registration request for removing a paging restriction, based on removal of the paging restriction being required while the UE supporting the MUSIM is in a state in which a cell the UE camps on is in the non-allowed area.

9 . A method performed by a network entity for managing mobility in a wireless communication system, the method comprising:

receiving, from a user equipment (UE) while a mobility management back off (BO) timer is running, a first non-access stratum (NAS) message associated with a first service request procedure for a release of a connection, based on the UE supporting a multi-universal subscriber identity module (MUSIM) being in an evolved packet system (EPS) mobility management (EMM)-connected mode or a fifth generation system (5GS) mobility management (5GMM)-connected mode; and

transmitting a message as a response to the first NAS message.

10 . The method of claim 9 , wherein a second service request procedure starts while a service gap control (SGC) timer is running, based on a second NAS message associated with the second service request procedure being received from the UE, and based on the UE supporting the MUSIM being in the EMM-connected mode.

11 . The method of claim 9 , wherein a second service request procedure starts while a service gap control (SGC) timer is running, based on a second NAS message associated with the second service request procedure being received from the UE, and based on the UE supporting the MUSIM being in the 5GMM-connected mode with a radio resource control (RRC) inactive indication.

12 . The method of claim 9 , further comprising:

transmitting, to the UE via a base station, service area restriction information including information on a non-allowed area; and

receiving, from the UE via the base station, a registration request for removing a paging restriction, based on removal of the paging restriction being required while the UE supporting the MUSIM is in a state in which a cell the UE camps on is in the non-allowed area.

13 . A network entity for managing mobility in a wireless communication system, the network entity comprising:

a transceiver; and

a controller coupled with the transceiver and configured to:

receive, from a user equipment (UE) while a mobility management back off (BO) timer is running, a first non-access stratum (NAS) message associated with a first service request procedure for a release of a connection, based on the UE supporting a multi-universal subscriber identity module (MUSIM) being in an evolved packet system (EPS) mobility management (EMM)-connected mode or a fifth generation system (5GS) mobility management (5GMM)-connected mode, and

transmit a message as a response to the first NAS message.

14 . The network entity of claim 13 , wherein a second service request procedure starts while a service gap control (SGC) timer is running, based on a second NAS message associated with the second service request procedure being received from the UE, and based on the UE supporting the MUSIM being in the EMM-connected mode.

15 . The network entity of claim 13 , wherein a second service request procedure starts while a service gap control (SGC) timer is running, based on a second NAS message associated with the second service request procedure being received from the UE, and based on the UE supporting the MUSIM being in the 5GMM-connected mode with a radio resource control (RRC) inactive indication.

16 . The network entity of claim 13 , wherein the controller is further configured to:

transmit, to the UE via a base station, service area restriction information including information on a non-allowed area, and

receive, from the UE via the base station, a registration request for removing a paging restriction, based on removal of the paging restriction being required while the UE supporting the MUSIM is in a state in which a cell the UE camps on is in the non-allowed area.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2022
From: WATFA, MAHMOUD; KUMAR, LALITH
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 060743/0210 →
Priority Claims (2)
IN 202131035582 · Aug 6, 2021 · national
GB 2211284 · Aug 3, 2022 · national
Continuity (1)
Related Publication 20230040747A1 · Feb 9, 2023
References Cited (22)
US 20140128110A1 · Wang · 2014 [cited by examiner]
US 20170245188A1 · Kim et al. · 2017 [cited by applicant]
US 20190014530A1 · Aghili · 2019 [cited by examiner]
US 20200359196A1 · Balasubramaniam et al. · 2020 [cited by applicant]
US 20210014822A1 · Gurumoorthy et al. · 2021 [cited by applicant]
US 20220377613A1 · Watfa · 2022 [cited by examiner]
WO WO2020256489 · 2020 [cited by applicant]
WO WO2021056384 · 2021 [cited by applicant]
WO WO2021060893 · 2021 [cited by applicant]
WO WO2021066562 · 2021 [cited by applicant]
WO WO2021206322 · 2021 [cited by applicant]
3GPP TS 24.501 V17.3.1, 3GPP, 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Non-Access-Stratum (NAS) Protocol for 5G System (5GS); Stage 3; (Release 17), Jun. 2021, 813 pa… [cited by applicant]
International Search Report dated Nov. 22, 2022 issued in counterpart application No. PCT/KR2022/011684, 7 pages. [cited by applicant]
British Search Report dated Dec. 22, 2022 issued in counterpart application No. GB 2211284.1, 6 pages. [cited by applicant]
British Search Report dated May 3, 2024 issued in counterpart application No. GB 2211284.1, 5 pages. [cited by applicant]
3GPP TS 24.501 V17.2.0 (Mar. 2021), Technical Specification, 758 pages. [cited by applicant]
3GPP TS 23.502 V17.0.0 (Mar. 2021), Technical Specification, 646 pages. [cited by applicant]
3GPP TS 23.501 V17.0.0 (Mar. 2021), Technical Specification, 489 pages. [cited by applicant]
3GPP TR 23.752 V0.5.0 (Sep. 2020), Technical Report, 162 pages. [cited by applicant]
Apple et al., “Updates to Service Request for MUSIM Leaving and Reject Paging in 5GS”, CP-211322, 3GPP TSG-CT Meeting #92e, Jun. 14-16, 2021, 25 pages. [cited by applicant]
Samsung, “Handling of Wait Time during Resume Procedure”, C1-198356, 3GPP TSG-CT WG1 Meeting #120, Oct. 7-11, 2019, 8 pages. [cited by applicant]
European Search Report dated Oct. 16, 2024 issued in counterpart application No. 22853556.3-1215, 12 pages. [cited by applicant]