IP Library › Granted Patent US 12,348,360
Granted Patent B2
US 12,348,360 · App. 17/901,932 · Granted Jul 1, 2025

Enhancing beam failure recovery procedure of a wireless device

Inventors: Hua Zhou (Vienna, VA); Esmael Hejazi Dinan (McLean, VA); Ali Cagatay Cirik (Chantilly, VA); Hyoungsuk Jeon (Centreville, VA); Alireza Babaei (Fairfax, VA)
Assignee: Ofinno, LLC
H04L41/0668H04B7/06H04L5/0048H04W24/08H04W56/001H04W76/27
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,348,360
App. No.
17/901,932
Filed
Sep 2, 2022
Granted
Jul 1, 2025
Kind
B2
Art Unit
2477
USPC
370/225
Abstract

A wireless device receives configuration parameters of a beam failure recovery (BFR) procedure. The configuration parameters indicate: a first time value of a BFR time window; and a second time value of a response window. Beam failure instances are detected. A preamble associated with a reference signal is transmitted. During the response window after the transmission of the preamble, a downlink control channel is monitored for a response to the preamble. The wireless device stops monitoring the downlink control channel in response to not receiving the response during the BFR time window after the detecting the beam failure instances.

Claims (45)

1. A method comprising:

triggering, by a wireless device, a beam failure recovery (BFR) procedure;

assessing, based on a threshold, a radio link quality of each of a plurality of reference signals (RSs) to detect a candidate beam for the BFR procedure;

transmitting, to a base station, a message comprising an indication indicating that the candidate beam is not available, during a time that a beam failure recovery timer is running, wherein the indication is based on each of the plurality of RSs having a respective radio link quality assessed to be below the threshold; and

completing the BFR procedure after the transmitting the indication.

2. The method of claim 1 , wherein the plurality of RSs comprises at least one of:

one or more CSI-RSs; or

one or more synchronization signal blocks (SSBs).

3. The method of claim 1 , wherein the radio link quality of each of the plurality of RSs comprises a value of reference signal received power (RSRP) of each of the plurality of RSs.

4. The method of claim 1 , further comprising:

receiving one or more radio resource control (RRC) messages comprising BFR configuration parameters comprising the threshold.

5. The method of claim 1 , wherein the BFR is triggered in response to detecting a number of beam failure instances based on a second plurality of reference signals.

6. The method of claim 1 , further comprising:

starting, for the BFR procedure, a beam failure recovery timer with a timer value.

7. The method of claim 6 , wherein the assessing is during the beam failure recovery timer being running.

8. The method of claim 1 , wherein the indication is transmitted in one or more radio resource control (RRC) messages.

9. A wireless device comprising:

one or more processors; and

memory storing instructions that, when executed by the one or more processors, further cause the wireless device to:

trigger a beam failure recovery (BFR) procedure;

assess, based on a threshold, a radio link quality of each of a plurality of reference signals (RSs) to detect a candidate beam for the BFR procedure;

transmit, to a base station, a message comprising an indication indicating that the candidate beam is not available, during a time that a beam failure recovery timer is running, wherein the indication is based on each of the plurality of RSs having a respective radio link quality assessed to be below the threshold; and

complete the BFR procedure after the transmitting the indication.

10. The wireless device of claim 9 , wherein the plurality of RSs comprises at least one of:

one or more CSI-RSs; or

one or more synchronization signal blocks (SSBs).

11. The wireless device of claim 9 , wherein the radio link quality of each of the plurality of RSs comprises a value of reference signal received power (RSRP) of each of the plurality of RSs.

12. The wireless device of claim 9 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to:

receive one or more radio resource control (RRC) messages comprising BFR configuration parameters comprising the threshold.

13. The wireless device of claim 9 , wherein the BFR is triggered in response to detecting a number of beam failure instances based on a second plurality of reference signals.

14. The wireless device of claim 9 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to:

start, for the BFR procedure, a beam failure recovery timer with a timer value.

15. The wireless device of claim 14 , wherein the assessing is during the beam failure recovery timer being running.

16. The wireless device of claim 9 , wherein the indication is transmitted in one or more radio resource control (RRC) messages.

17. A non-transitory computer-readable medium comprising instructions that, when executed by one or more processors of a wireless device, cause the wireless device to:

trigger a beam failure recovery (BFR) procedure;

assess, based on a threshold, a radio link quality of each of a plurality of reference signals (RSs) to detect a candidate beam for the BFR procedure;

transmit, to a base station, a message comprising an indication indicating that the candidate beam is not available, during a time that a beam failure recovery timer is running, wherein the indication is based on each of the plurality of RSs having a respective radio link quality assessed to be below the threshold; and

complete the BFR procedure after the transmitting the indication.

18. The non-transitory computer-readable medium of claim 17 , wherein the plurality of RSs comprises at least one of:

one or more CSI-RSs; or

one or more synchronization signal blocks (SSBs).

19. The non-transitory computer-readable medium of claim 17 , wherein the radio link quality of each of the plurality of RSs comprises a value of reference signal received power (RSRP) of each of the plurality of RSs.

20. The non-transitory computer-readable medium of claim 17 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to:

receive one or more radio resource control (RRC) messages comprising BFR configuration parameters comprising the threshold.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 13, 2022
From: ZHOU, HUA; DINAN, ESMAEL HEJAZI; CIRIK, ALI; JEON, HYOUNGSUK; BABAEI, ALIREZA
To: OFINNO, LLC
Reel/Frame 061070/0638 →
Continuity (4)
Continuation 17068022 · Oct 12, 2020
Continuation 16268038 · Feb 5, 2019
Provisional Application 62626328 · Feb 5, 2018
Related Publication 20230113640A1 · Apr 13, 2023
References Cited (192)
US 10925116B2 · Zhang et al. · 2021 [cited by applicant]
US 11206596B2 · Chen · 2021 [cited by examiner]
US 20180270700A1 · Babaei et al. · 2018 [cited by applicant]
US 20180302889A1 · Guo et al. · 2018 [cited by applicant]
US 20180323856A1 · Xiong · 2018 [cited by examiner]
US 20180359790A1 · Ingale et al. · 2018 [cited by applicant]
US 20180368124A1 · Liu · 2018 [cited by examiner]
US 20190037498A1 · Tseng · 2019 [cited by applicant]
US 20190037604A1 · Akkarakaran et al. · 2019 [cited by applicant]
US 20190052342A1 · Maattanen et al. · 2019 [cited by applicant]
US 20190053314A1 · Zhou · 2019 [cited by examiner]
US 20190075599A1 · Xia · 2019 [cited by examiner]
US 20190075600A1 · Kwon · 2019 [cited by examiner]
US 20190081753A1 · Jung et al. · 2019 [cited by applicant]
US 20190097874A1 · Zhou et al. · 2019 [cited by applicant]
US 20190141552A1 · Chen · 2019 [cited by examiner]
US 20190159100A1 · Liou · 2019 [cited by examiner]
US 20190190582A1 · Guo · 2019 [cited by applicant]
US 20190200396A1 · Agiwal · 2019 [cited by applicant]
US 20190215048A1 · Cirik · 2019 [cited by examiner]
US 20190215863A1 · Kim et al. · 2019 [cited by applicant]
US 20190215888A1 · Cirik · 2019 [cited by examiner]
US 20190230545A1 · Liou et al. · 2019 [cited by applicant]
US 20190245737A1 · Zhou · 2019 [cited by examiner]
US 20190253127A1 · Kang · 2019 [cited by examiner]
US 20190280756A1 · Fan et al. · 2019 [cited by applicant]
US 20190281480A1 · Wei et al. · 2019 [cited by applicant]
US 20200196327A1 · Zhang · 2020 [cited by examiner]
US 20200245214A1 · Chen · 2020 [cited by applicant]
US 20200322035A1 · Shi · 2020 [cited by examiner]
US 20200344835A1 · Wang et al. · 2020 [cited by applicant]
US 20200374960A1 · Deenoo · 2020 [cited by applicant]
US 20200404559A1 · Koskela · 2020 [cited by examiner]
US 20200413395A1 · Chen · 2020 [cited by applicant]
US 20200413475A1 · Wei · 2020 [cited by applicant]
US 20210013951A1 · Chen et al. · 2021 [cited by applicant]
US 20210021320A1 · Koskela et al. · 2021 [cited by applicant]
US 20210058130A1 · Zhu et al. · 2021 [cited by applicant]
US 20210067231A1 · Yang · 2021 [cited by applicant]
US 20210068162A1 · Agiwal · 2021 [cited by examiner]
US 20210091844A1 · Koskela et al. · 2021 [cited by applicant]
US 20210135927A1 · Yang et al. · 2021 [cited by applicant]
US 20210185754A1 · Da Silva · 2021 [cited by examiner]
US 20210204346A1 · Ye · 2021 [cited by examiner]
US 20210234752A1 · Matsumura et al. · 2021 [cited by applicant]
US 20210344405A1 · Yuan et al. · 2021 [cited by applicant]
US 20210385896A1 · Kim · 2021 [cited by applicant]
US 20220007258A1 · Liou · 2022 [cited by examiner]
US 20220061087A1 · Koskela et al. · 2022 [cited by applicant]
US 20220095410A1 · Shih et al. · 2022 [cited by applicant]
3GPP TSG-RAN WG2 NR Ad Hoc #3 R2-1801477; Vancouver, Canada, Jan. 22-26, 2018; CR-Form-v11.1 Change Request. [cited by applicant]
3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Title: RAN1 Chairman's Notes; 1 Opening of the Meeting (Day 1: 9.00 AM) 2. [cited by applicant]
R1-1800101; 3GPP TSG RAN WG1 Ad Hoc Meeting; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item: 7.2.2.4; Source: Huawei, HiSilicon; Title: Summary of remaining issues on beam failure recovery. [cited by applicant]
R1-1800111 Remaining details on beam recovery; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Source:ZTE, Sanechips; Title: Remaining details on beam recovery; Agenda Item: 7.2.2.4; Document for:… [cited by applicant]
R1-1800160_BFR_final; 3GPP TSG RAN WG1 Meeting AH1801; Vancouver, CA, Jan. 22-26, 2018; Agenda Item: 7.2.2.4; Source: MediaTek Inc.; Title: Clarifications on Beam Failure Recovery; Document for: Discussion. [cited by applicant]
R1-1800186_Remaining issues and text proposals on mechanism to recover from beam failure; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Source: vivo; Title: Remaining issues and text proposals o… [cited by applicant]
R1-1800242; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Source: CATT; Title: Remaining issues on DL beam recovery; Agenda Item: 7.2.2.4. [cited by applicant]
R1-1800312 Remaining Issues on Beam Failure Recovery_r1; 3GPP TSG-RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Source: Intel Corporation; Title: Remaining Issues on Beam Failure Recovery; Agenda item:7.… [cited by applicant]
R1-1800364 BFR; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda tem: 7.2.2.4; Source: LG Electronics; Title: Discussion on PHY and MAC operation for beam failure recovery; Document for: Dis… [cited by applicant]
R1-1800402—Beam Recovery; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item:7.2.2.4; Source: Lenovo, Motorola Mobility; Title: Corrections on beam failure recovery. [cited by applicant]
R1-1800434; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda item: 7.2.2.4; Source: Samsung; Title: Issues on beam failure recovery; Document for: Discussion and Decision. [cited by applicant]
R1-1800583 In support of partial beam failure—Copy; 3GPP TSG RAN WG1 Meeting AH 1801R1-1800583; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item: 7.2.2.4; Source: AT&T. [cited by applicant]
R1-1800622 Remaining Issues for Beam Failure Recovery Procedure; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item: 7.2.2.4; Source:ASUSTek; Title : Remaining Issues for Beam Failure Rec… [cited by applicant]
R1-1800629 beam recovery_FINAL; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item: 7.2.2.4; Source: InterDigital, Inc. ; Title: Remaining details on beam failure recovery. [cited by applicant]
R1-1800642; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item: 7.2.2.4; Source: ITRI; Title: Discussion on timer for beam failure recovery. [cited by applicant]
R1-1800661_Beam_Failure_Recovery; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Source: NTT Docomo; Title: Remaining issues on beam recovery; Agenda Item: 7.2.2.4. [cited by applicant]
R1-1800700 Remaining details and corrections on beam recovery; 3GPP TSG RAN WG1 Meeting AH 1801; Vancouver, Canada, Jan. 22-26, 2018; Source: Ericsson; Title: Remaining details and corrections for beam recovery; Agenda … [cited by applicant]
R1-1800752; 3GPP TSG-RAN WG1 NR AH #1801; Vancouver, Canada Jan. 22-26, 2018; Agenda item: 7.2.2.4.; Source: Nokia, Nokia Shanghai Bell; Title: Remaining Details on Beam Recovery. [cited by applicant]
R2-1800086_Issues and Corrections for Beam Failure Recovery Request Procedure; 3GPP TSG-RAN2 AH-1801; Vancouver, Canada, Jan. 22-Jan. 26, 2018; Agenda item: 10.3.1.4.2; Source: Samsung; Title: Issues/Corrections: Beam F… [cited by applicant]
R2-1800095_Draft CR_Corrections for Beam Failure Recovery Request Procedure; 3GPP TSG-RAN WG2 AH-1801; Vancouver, Canada, Jan. 22-Jan. 26, 2018; CR-Form-v11.2; Change Request. [cited by applicant]
R2-1800652 Further Clarification on Beam Failure Recovery Procedure; 3GPP TSG-RAN WG2 Meeting AH-1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item: 10.3.1.4.2; Souce: MediaTek Inc.; Title: Further Clarification on … [cited by applicant]
R2-1800963 Clarifications to beam recovery procedure; 3GPP TSG-RAN WG2 NR Ad hoc 1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda item: 10.3.1.4.2; Source: Nokia, Nokia Shanghai Bell. [cited by applicant]
R2-1800964 Draft CR to 38.321 on Beam recovery procedure; 3GPP TSG-RAN WG2 NR Ad hoc 1801; Vancouver, Canada, Jan. 22-26, 2018; CR-Form-v11.2; Draft Change Request. [cited by applicant]
R2-1801404_Beam failure recovery_r4; 3GPP TSG-RAN WG2 NR Ad hoc 1801; Vancouver, Canada, Jan. 22-Jan. 26, 2018; Source: NTT Docomo, Inc. ; Title:Discussion on Beam failure recovery; Document for: Discussion and decision… [cited by applicant]
R2-1801405_Draft CR to 38.321 on Clarification on beam failure recovery_r1; 3GPP TSG-RAN WG2 NR Ad hoc 1801; Vancouver, Canada, Jan. 22-Jan. 26, 2018; CR-Form-v11.2; Change Request. [cited by applicant]
R2-1801545_NR UP minutes RAN2-NR-AH1801; 3GPP TSG-RAN WG2 NR Ad hoc 1801; Vancouver, Canada, Jan. 22-Jan. 26, 2018; Agenda Item: 12.1.2; Source: Session Chair (InterDigital); Title: Report from LTE and NR User Plane Bre… [cited by applicant]
R2-1801558 Summary on BFR detection and other BFR issues; x3GPP TSG-RAN WG2 NR Ad hoc 0118; Vancouver, Canada, Jan. 22-Jan. 26, 2018; Source: CATT; Title: Summary on BFR detection and other BFR issues; Agenda Item:10.3.… [cited by applicant]
RAN2-NR-AH1801-Chair-Notes-eom; 3GPP TSG-RAN WG2 NR Ad hoc 1801 Vancouver, Canada, Jan. 22-Jan. 26, 2018; Source: RAN2 Chairman (Intel); Title: Chairman Notes; 1 Opening of the meeting (9 AM). [cited by applicant]
R2-1811483; 3GPP TSG-RAN WG2 Meeting #103; Gothenburg, Sweden, Aug. 20-24, 2018; CR-Form-v11.2; Change Request; 38.321 CR 0340 rev—Current version: 15.2.0; Title: CR for the reset of BFD in 38.321; Source: ZTE, Sanechip… [cited by applicant]
R2-1812108; 3GPP TSG-RAN WG2 Meeting #103; Gothenburg, Sweden, Aug. 20-24, 2018, CR-Form-v11.2; Draft Change Request; 38.331 CR 0170 rev—Current version: 15.2.1; Title: Reset of BFD; Source: Nokia, Nokia Shanghai Bell. [cited by applicant]
3GPP TS 38.213 V15.2.0 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for control (Release 15). [cited by applicant]
R2-1806229; 3GPP TSG-RAN WG2 Meeting #101 bis; Sanya, China, Apr. 16-20, 2018, CR-Form-v11.2; Change Request 38.321 CR 0057 rev 2; Current version: 15.1.0; Source: Samsung, Title: Miscellaneous corrections. [cited by applicant]
R2-1811325; 3GPP TSG-RAN WG2 Meeting #103; Gothenburg, Sweden, Aug. 20-24, 2018; CR-Form-v11.2; Change Request 38.321 CR 0316 rev Current version: 15.2.0; Source: Samsung Electronics; Title: Handling Beam Failure Recove… [cited by applicant]
3GPP TS 38.321 V15.2.0 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification (Release 15). [cited by applicant]
R2-1811149; 3GPP TSG-RAN WG2 Meeting #103; Gothenburg, Sweden, Aug. 20-24, 2018; CR-Form-v11.2; Change Request 38.331 CR draftCR rev—Current version: 15.2.1; Title: CR on beam failure receovery configuration—O301, O302. [cited by applicant]
R2-1811593; 3GPP TSG-RAN WG2 Meeting #103; Gothenburg, Sweden, Aug. 20-24, 2018, CR-Form-v11.2; Change Request 38.331CR CRNum rev—Current version: 15.2.0; Title: CR for the configuration of BeamFailureRecoveryConfig. [cited by applicant]
3GPP TS 38.331 V15.2.1 (Jun. 2018); Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 15). [cited by applicant]
R1-180XXXX; 3GPP TSG-RAN WG1 Meeting #94; Gothenburg, Sweden, Aug. 20-24, 2018; Agenda: 7.1.2.3; Source: Ericsson; Title: Feature lead summary beam management v2; Document for: Discussion, Decision. [cited by applicant]
R1-180XXXX; 3GPP TSG-RAN WG1 Meeting #94; Gothenburg, Sweden, Aug. 20-24, 2018; Source: NTT Docomo, Inc.; Title: Oflline summary for PDCCH structure and search space; Agenda Item: 7.1.3.1; Document for: Discussion and D… [cited by applicant]
R1-180XXXX; 3GPP TSG-RAN WG1 Meeting #94; Gothenburg, Sweden, Aug. 20-24, 2018; Agenda Item: 7.1.2.3; Source: MediaTek Inc.; Title: Summary #1 on Remaining Issues on Beam Failure Recovery; Document for: Discussion. [cited by applicant]
R1-1801722; 3GPP TSG RAN WG1 Meeting #92; Athens, Greece, Feb. 26-Mar. 2, 2018, Source: CATT; Title: Remaining issues on DL beam failure recovery; Agenda Item: 7.1.2.2.4; Document for: Discussion and Decision. [cited by applicant]
R1-1802824; 3GPP TSG RAN WG1 Meeting #92; Athens, Greece, Feb. 26-Mar. 2, 2018; Agenda item: 7.1.2.2.4; Source: Qualcomm Incorporated; Title: Beam recovery procedures; Document for: Discussion and Decision. [cited by applicant]
R1-1803622; 3GPP TSG RAN WG1 Meeting #92; Sanya, China, Apr. 16-20, 2018; Agenda item: 7.1.2.2.4; Source: NEC, Title: Remaining issues on beam failure recovery; Document for: Discussion and Decision. [cited by applicant]
R1-1804211; 3GPP TSG-RAN WG1 Meeting #92bis; Sanya, China, Apr. 16-20, 2018; Agenda Item: 7.1.2.2.4; Source: Lenovo, Motorola; Mobility, Title: Discussion of beam failure recovery for Carrier Aggregation; Document for: … [cited by applicant]
R1-1806281; 3GPP TSG-RAN WG1 #93; Busan, Korea, May 21-25, 2018; Source: CATT; Title: Remaining issues on beam failure recovery; Agenda Item: 7.1.2.2.4; Document for: Discussion and Decision. [cited by applicant]
R1-1806789; 3GPP TSG-RAN WG1 #93; Busan, Korea, May 21-25, 2018; Agenda Item: 7.1.2.2.4; Source: MediaTek Inc., Title: Remaining Issues on beam failure recovery; Document for: Discussion. [cited by applicant]
R1-1807796; 3GPP TSG-RAN WG1 #93; Busan, Korea, May 21-25, 2018; Agenda Item: 7.1.2.2.4; Source: MediaTek Inc., Title: Summary 2 on Remaining issues on beam failure recovery; Document for: Discussion. [cited by applicant]
R1-1808720; 3GPP TSG-RAN WG1 Meeting #94; Gothenburg, Sweden, Aug. 20-24, 2018; Source: Intel Corporation; Title: On SCell Beam Failure Recovery; Agenda item: 7.2.8; Document for: Discussion and Decision. [cited by applicant]
R1-1810020; 3GPP TSG-RAN WG1 Meeting #94; Gothenburg, Sweden, Aug. 20-24, 2018; CR-Form-v11.2; Change Request 38.213 CR Draft rev—Current version: 15.2.0; Title: CR to 38.213 capturing the RAN1#94 meeting agreements. [cited by applicant]
R1-1810105; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.6; Source: Huawei, HiSilicon; Title: Beam management enhancements for latency and overhead reduction; Document for: Dis… [cited by applicant]
R1-1810106; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.6; Source: Huawei, HiSilicon; Title: Beam failure recovery for SCell; Document for: Discussion and Decision. [cited by applicant]
R1-1810221; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: ZTE; Title: Enhancements on multi-beam operation; Agenda Item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R1-1810303; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018, Source: LG Electronics Title: Discussion on multi-beam based operations and enhancements; Document for: Discussion and Decision. [cited by applicant]
R1-1810403; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: vivo; Title: Discussion on Enhancements on Multi-Beam Operation; Agenda Item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R1-1810408; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: vivo; Title: Discussion on beam measurement and reporting; Agenda Item: 7.2.8.6; Document for: Discussion and Decision. [cited by applicant]
R1-1810409; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: vivo; Title: Discussion on SCell BFR; Agenda Item: 7.2.8.6; Document for: Discussion and Decision. [cited by applicant]
R1-1810410; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: vivo; Title: Discussion on UL multi-beam transmission; Agenda Item: 7.2.8.6; Document for: Discussion and Decision. [cited by applicant]
R1-1810411; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: vivo; Title: Discussion on beam management latency and overhead reduction; Agenda Item: 7.2.8.6; Document for: Discussion and Deci… [cited by applicant]
R1-1810435; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: MediaTek Inc.; Title: Enhancements on multi-beam operation; Document for: Discussion. [cited by applicant]
R1-1810556; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: CATT; Title: Consideration on multi-beam operation enhancements; Agenda Item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R1-1810572; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: Lenovo, Motorola Mobility; Title: Discussion of enhancements for multi-beam operation; Agenda Item: 7.2.8.3; Document for: Discuss… [cited by applicant]
R1-1810598; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: Fujitsu; Title: Discussion on beam failure recovery for SCell; Agenda Item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R1-1810644; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: Sony; Title: Considerations on multi-beam operation; Document for: Discussion. [cited by applicant]
R1-1810688; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: AT&T Title: Enhancements on Multi-Beam Operation for NR; Agenda Item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R1-1810791; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: Intel Corporation; Title: On Beam Management Enhancement; Agenda item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R1-1810805; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda item: 7.2.8.3; Source: NEC; Title: Discussion on Beam Failure Recovery; Document for: Discussion and Decision. [cited by applicant]
R1-1810886; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda item: 7.2.8.4; Source: Samsung; Title: Enhancements on multi-beam operations; Document for: Discussion and Decision. [cited by applicant]
R1-1810970; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: OPPO; Title: Discussion on Multi-beam Operation Enhancements; Agenda Item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R1-1811002; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: Spreadtrum Communications; Title: Discussion on multi-beam operation; Document for: Discussion and decision. [cited by applicant]
R1-1811086; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: Fraunhofer IIS, Fraunhofer HHI; Title: Discussion on signaling of beam correspondence; Document for: Decisio… [cited by applicant]
R1-1811188; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: Ericsson; Title: Enhancements on Multi-beam Operation; Document for: Discussion. [cited by applicant]
R1-1811189; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.6; Source: Ericsson; Title: Link recovery on SCell; Document for: Discussion and Decision. [cited by applicant]
R1-1811223; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: InterDigital nc.; Title: Discussion on Multi-Beam Operation Enhancements; Document for: Discussion and Decis… [cited by applicant]
R1-1811278; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda item: 7.2.8.3; Source: Qualcomm Incorporated; Title: Enhancements on Multi-beam Operation; Document for: Discussion/Decision. [cited by applicant]
R1-1811349; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: NTT Docomo, Inc.; Title: Discussion on multi-beam enhancement; Agenda Item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R1-1811393; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: Xiaomi; Title: Enhancements on beam management; Document for: Discussion and Decision. [cited by applicant]
R1-1811408; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda item: 7.2.8.4; Source: Nokia, Nokia Shanghai Bell; Title: Enhancements on Multi-beam Operation; Document for: Discussion and Decisi… [cited by applicant]
R1-1811470; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: Huawei, HiSilicon; Title: Enhancements on multi-beam operation; Document for: Discussion and Decision. [cited by applicant]
R2-1810008; 3GPP TSG RAN WG2 AH-1807 Meeting; Montreal, Canada, Jul. 2-6, 2018; Agenda Item: 10.3.1.2; Source: Sharp; Title: Remaining issues on DL BWP switching upon RACH procedure initiation; Document for: Discussion … [cited by applicant]
R2-1810091; 3GPP TSG RAN WG2 AH-1807 Meeting; Montreal, Canada, Jul. 2-6, 2018; Agenda item: 10.3.1.2; Source: Huawei, HiSilicon; Title: BWP switch for BFR; Document for: Discussion. [cited by applicant]
R2-1810513; 3GPP TSG RAN WG2 AH-1807 Meeting; Montreal, Canada, Jul. 2-6, 2018; Source: Huawei, HiSilicon; Title: Clarification on RA procedure for BFR on BWPs without CBRA occasions; Document for: Discussion. [cited by applicant]
R2-1810641; 3GPP TSG RAN WG2 AH-1807; Montreal, Canada, Jul. 2-6, 2018; Agenda Item: 10.2.2.1; Source: Huawei, HiSilicon; Title: Issues on BWP switch and search space configuration for BFR; Document for: Discussion and … [cited by applicant]
R2-1810643; 3GPP TSG RAN WG2 AH-1807; Montreal, Canada, Jul. 2-6, 2018; Agenda item: 10.2.2.1; Source: Huawei, HiSilicon; Title: RACH configuration on BWPs; Document for: Discussion and Decision. [cited by applicant]
R2-1810797; 3GPP TSG RAN WG2 AH-1807; Montreal, Canada, Jul. 2-6, 2018; Source: CATT; Title: Offline discussion #100 on DL-UL linking for CFRA; Agenda Item: 10.3.1.2; Document for: Discussion and Decision. [cited by applicant]
R2-1811482; 3GPP TSG-RAN WG2 Meeting #103; Gothenburg, Sweden, Aug. 20-24, 2018; Agenda item: 10.3.1.4.2; Source: ZTE, Sanechips; Title: Consideration on implicit configuration of RS for BFD; Document for: Discussion an… [cited by applicant]
R2-1811896; 3GPP TSG-RAN WG2 Meeting #103; Gothenburg, Sweden, Aug. 20-24, 2018; Agenda item: 10.3.1.2; Source: Huawei, HiSilicon; Title: BWP switch for BFR; Document for: Discussion. [cited by applicant]
R2-1812639; 3GPP TSG-RAN WG2 Meeting #103; Gothenburg, Sweden, Aug. 20-24, 2018; Agenda Item: 10.3.1.4.2 (NR_newRAT-Core); Source: LG Electronics Inc.; Title: BWP operation for BFR RA; Document for : Discussion and Deci… [cited by applicant]
R2-1807584; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; revision of R2-1804696; Source: vivo; Title: Discussion on the SCell BFR; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
European Extended Search Report mailed Feb. 12, 2020 in EP Patent Application No. 19206560.5. [cited by applicant]
European Office Action mailed Aug. 16, 2021 in EP Patent Application No. 19206560.5. [cited by applicant]
Non-Final Office Action mailed Jul. 21, 2021 in U.S. Appl. No. 16/670,225. [cited by applicant]
Final Office Action mailed Mar. 2, 2022 in U.S. Appl. No. 16/670,225. [cited by applicant]
R1-1811472; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: ASUS TeK; Title: Discussion on enhancements on multi-beam operation; Document for: Discussion and Decision. [cited by applicant]
R1-1811526; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Agenda Item: 7.2.8.3; Source: CEWiT, Title: On fast SRS precoder updation; Document for: Discussion and decision. [cited by applicant]
R1-1811635; 3GPP TSG-RAN WG1 Meeting #94bis; Chengdu, PR China, Oct. 8-12, 2018; Source: OPPO; Title: Discussion on Multi-beam Operation Enhancements; Agenda Item: 7.2.8.3; Document for: Discussion and Decision. [cited by applicant]
R2-1800049; 3GPP TSG-RAN WG2 Meeting #AH-1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item: 10.3.1.13; Source: ASUSTeK; Title: UE behaviours upon beam failure and recovery; Document for: Discussion and Decision. [cited by applicant]
R2-1800632; 3GPP TSG-RAN WG2 Ad Hoc; Vancouver, Canada, Jan. 22-26, 2018; Agenda item: 10.2.2.1; Source: Huawei, HiSilicon; Title: Remaining issue for beam failure recovery; Document for: Discussion. [cited by applicant]
R2-1800895; 3GPP TSG-RAN WG2 Meeting #AH-1801; Vancouver, Canada, Jan. 22-26, 2018; Source: vivo; Title: Discussion on the impact of beam failure recovery; Agenda Item: 10.3.1.4.3; Document for: Discussion and Decision. [cited by applicant]
R2-1801009; 3GPP TSG-RAN WG2 Meeting #AH-1801; Vancouver, Canada, Jan. 22-26, 2018; Agenda Item: 10.3.1.4.3; Source: Huawei, HiSilicon; Title: General consideration on RA procedure for beam failure recovery; Document fo… [cited by applicant]
R2-1801049; 3GPP TSG-RAN WG2 Meeting #AH-1801; Vancouver, Canada, Jan. 22-26, 2018; Source: Huawei, HiSilicon; Title: Non-contention based random access for beam failrue recovery in CA; Agenda Item: 10.3.1.4.3; Document… [cited by applicant]
R2-1801814; 3GPP TSG-RAN WG2 #101; Athens, Greece, Feb. 26-Mar. 2, 2018; Agenda item: 10.3.1.13; Source: Huawei, HiSilicon; Title: Beam failure recovery for SCell; Document for: Discussion. [cited by applicant]
R2-1801926; 3GPP TSG-RAN WG2 #101; Athens, Greece, Feb. 26-Mar. 2, 2018; Source: ZTE, Sanechips; Title Remaining considerations on RACH procedure for BFR; Agenda Item: 10.3.1.4.2; Document for: Discussion & Decision. [cited by applicant]
R2-1802143; 3GPP TSG-RAN WG2 #101; Athens, Greece, Feb. 26-Mar. 2, 2018; Source: CATT; Title: RACH reattempt considering beam selection; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
R2-1802151; 3GPP TSG-RAN WG2 #101; Athens, Greece, Feb. 26-Mar. 2, 2018; Source: CATT; Title: Beam failure recovery; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
R2-1802490; 3GPP TSG-RAN WG2 #101; Athens, Greece, Feb. 26-Mar. 2, 2018; Agenda item: 10.3.1.4.2; Source: CATT, Huawei, HiSilicon; Title: Discussion on Beam Failure Recovery for CA; Document for: Discussion and Decision. [cited by applicant]
R2-1803045; 3GPP TSG-RAN WG2 #101; Athens, Greece, Feb. 26-Mar. 2, 2018; Agenda Item: 10.3.1.4.2; Source: Sharp; Title: Identification of Contention based random access for beam failure recovery; Document for: Discussio… [cited by applicant]
R2-1803198; 3GPP TSG-RAN WG2 #101; Athens, Greece, Feb. 26-Mar. 2, 2018; Revision of R2-1800340; Agenda Item: 10.3.1.4.2; Source: Ericsson; Title: Contention based random access for beam failure recovery; Document for: … [cited by applicant]
R2-1803229; 3GPP TSG-RAN WG2 #101; Athens, Greece, Feb. 26-Mar. 2, 2018; Revision of R2-1800961; Agenda item: 10.3.1.4.2; Source: Nokia, Nokia Shanghai! Bell; Title: BWP switch interaction with contention free BFR pream… [cited by applicant]
R2-1804279; 3GPP TSG-RAN WG2 Meeting #101; Sanya, China, Apr. 16-20, 2018; Agenda Item: 10.3.1.4.2; Source: ASUSTeK; Title: UE behaviours upon beam failure and recovery; Document for: Discussion and Decision. [cited by applicant]
R2-1804303; 3GPP TSG-RAN WG2 Meeting #101; Sanya, China, Apr. 16-20, 2018; Agenda item: 10.3.1.4.2; Source: Samsung; Title: MAC Impacts: Beam Failure Recovery for SCell; Document for: Discussion & Decision. [cited by applicant]
R2-1804304; 3GPP TSG-RAN WG2 Meeting #101; Sanya, China, Apr. 16-20, 2018; Agenda item: 10.3.1.4.2; Source: Samsung; Title: Contention Based BFR Procedure: Reporting Candidate Beam; Document for: Discussion & Decision. [cited by applicant]
R2-1804407; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Source: ZTE, Sanechips; Title: Consideration on beam failure recovery for SCell; Agenda Item: 10.3.1.4.3; Document for: Discussion & Decision. [cited by applicant]
R2-1804410; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Agenda item: 10.3.1.2; Source: Huawei, HiSilicon; Title: Beam failure recovery using MAC CE; Document for: Discussion. [cited by applicant]
R2-1804411; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Agenda item: 10.3.1.2; Source: Huawei, HiSilicon; Title: BWP issues for BFR; Document for: Discussion. [cited by applicant]
R2-1804434; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Agenda Item: 10.3.1.4.2; Source: OPPO; Title: Issues on supporting SCell BFR RACH; Document for: Discussion, Decision. [cited by applicant]
R2-1804481; 3GPP TSG-RAN WG2 Meeting #101-bis; Sanya, China, Apr. 16-20, 2018; Source: CATT; Title: Leftover issues for BFR; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
R2-1804482; 3GPP TSG-RAN WG2 Meeting #101-bis; Sanya, China, Apr. 16-20, 2018; Source: CATT; Title: BFR configurations and fallback options; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
R2-1804483; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Source: CATT; Title: BFR on SCell; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
R2-1804696; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Source: vivo; Title: Discussion on the SCell BFR; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
R2-1805005; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Agenda item: 10.3.1.4.2; Source: Intel Corporation; Title: On beam failure detection and recovery using random access; Document for: Discussi… [cited by applicant]
R2-1805342; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Agenda item: 10.3.1.4.2; Source: Nokia, Nokia Shanghai Bell; Title: SCell Beam Failure Recovery; WID/SID: NR_newRAT-Core—Release 15; Document… [cited by applicant]
R2-1805414; 3GPP TSG-RAN WG2 Meeting #101Bis; Sanya, China, Apr. 16-20, 2018; Agenda Item: 10.3.1.4.2; Source: Ericsson; Title: Beam Failure Recovery in SCell and contention-based BFR on SpCell; Document for: Discussion… [cited by applicant]
R2-1805896; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Agenda item: 10.4.1.3.1.1; Source: Huawei, HiSilicon; Title: ASN.1 for Beam Failure Recovery; Document for: Discussion and Decision. [cited by applicant]
R2-1805905; 3GPP TSG-RAN WG2 Meeting #102; Sanya, China, Apr. 16-20, 2018; Agenda item: 10.3.1.4.2; Source: Huawei, HiSilicon; Title: Discussions on RA for SCells BFR; Document for: Discussion and Decision. [cited by applicant]
R2-1806120; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; Agenda Item: 10.3.1.4.2; Source: ITL; Title: Beam Failure Recovery on SCell; Document for: Discussion and decision. [cited by applicant]
R2-1806166; 3GPP TSG-RAN WG2 Meeting #101Bis; Sanya, China, Apr. 16-20, 2018; Agenda Item: 10.3.1.4.3; Source: MediaTek, Inc.; Title: On switching between CFRA and CBRA; Document for: Discussion and Decision. [cited by applicant]
R2-1806819; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Agenda item: 10.3.1.4.2; Source: Samsung; Title: MAC Impacts: Beam Failure Recovery for SCell; Document for: Discussion & Decision. [cited by applicant]
R2-1806821; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Agenda Item: 10.3.1.4.2; Source: InterDigital, Inc.; Title: BFRon SCell; Document for: Discussion, Decision. [cited by applicant]
R2-1806824; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Agenda item: 10.3.1.4.2; Source: Samsung; Title: Contention Based BFR Procedure: Reporting Candidate Beam; Document for: Discussion & Decision. [cited by applicant]
R2-1807405; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Source: ZTE; Title: Discussion on he beam failure recovery timer; Agenda Item: 10.3.1.4.2; Document for: Discussion & Decision. [cited by applicant]
R2-1807415; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Agenda Item: 10.3.1.4.2; Source: OPPO; Title: MAC impacts on supporting BFR procedure on SCell; Document for: Discussion and Decision. [cited by applicant]
R2-1807444; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Resubmission of R2-1804411; Agenda item: 10.3.1.2; Source: Huawei, HiSilicon; Title: BWP switch for BFR; Document for: Discussion. [cited by applicant]
R2-1807961; 3GPP TSG RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Agenda item: 10.4.1.3.1.1; Source: Huawei, HiSilicon; Title: Discussion on BFR-config for SCell BFR; Document for: Discussion and Decision. [cited by applicant]
R2-1807975; 3GPP TSG RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Agenda item: 10.3.1.4.2; Source: Huawei, HiSilicon; Title: Discussion on beam failure recovery for SCell; Document for: Discussion and Decision. [cited by applicant]
R2-1808024; 3GPP TSG RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Agenda item: 10.3.1.4.2; Source: Nokia, Nokia Shanghai Bell; Title: SCell Beam Failure Recovery; WID/SID: NR_newRAT-Core—Release 15; Document for… [cited by applicant]
R2-1808658; 3GPP TSG RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; Agenda Item: 10.3.1.4.2; Source: ITL; Title: Beam failure Recovery on SCell; Document for: Discussion and decision. [cited by applicant]
R2-1809515; 3GPP TSG RAN WG2 AH-1807; Montreal, Canada, Jul. 2-6, 2018; Source: CATT; Title: Further issues with DL BWP switching for CFRA; Agenda Item: 10.3.1.2; Document for: Discussion and Decision. [cited by applicant]
R2-1809523; 3GPP TSG RAN WG2 AH-1807; Montreal, Canada, Jul. 2-6, 2018; Source: CATT; Title: Further discussion on BFR termination criterion; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
R2-1809721; 3GPP TSG RAN WG2 AH-1807; Montreal, Canada, Jul. 2-6, 2018; Agenda Item: 10.3.1.4.2; Source: InterDigital; Title: BWP switching for RA-BFR; Document for: Discussion, Decision. [cited by applicant]
R2-1809872; 3GPP TSG RAN WG2 AH-1802; Montreal, Canada, Jul. 2-6, 2018; Source: vivo; Title: Remaining configuration issues for BFR; Agenda Item: 10.4.1.3.1.1; Document for: Discussion and Decision. [cited by applicant]
R2-1809894; 3GPP TSG RAN WG2 AH-1807 Meeting; Montreal, Canada, Jul. 2-6, 2018; Source: vivo; Title: Preamble Selection when CFRA Resource Available; Agenda Item: 10.3.1.4.2; Document for: Discussion and Decision. [cited by applicant]
R2-1809925; 3GPP TSG RAN WG2 AH-1807; Montreal, Canada, Jul. 2-6, 2018; Agenda Item: 10.3.1.2; Source: OPPO; Title: The issue of BWP switching for BFR RACH; Document for: Discussion, Decision. [cited by applicant]