IP Library › Granted Patent US 12,348,316
Granted Patent B2
US 12,348,316 · App. 17/904,784 · Granted Jul 1, 2025

Semi-persistent scheduling opportunities for jittered periodic traffic

Inventors: Yisheng Xue (San Diego, CA); Jing Sun (San Diego, CA); Xiaoxia Zhang (San Diego, CA); Chih-Hao Liu (San Diego, CA); Ozcan Ozturk (San Diego, CA); Tao Luo (San Diego, CA); Juan Montojo (San Diego, CA); Peter Gaal (San Diego, CA); Mostafa Khoshnevisan (San Diego, CA); Piyush Gupta (Bridgewater, NJ); Changlong Xu (Beijing, CN)
Assignee: QUALCOMM Incorporated
H04L1/1854H04L1/1822H04L1/1887H04W72/20H04W72/52
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,348,316
App. No.
17/904,784
Granted
Jul 1, 2025
Kind
B2
Abstract

A method, a computer-readable medium, and an apparatus are provided for wireless communication at a user equipment (UE) and a base station. The UE receives a configuration for a plurality of semi-persistent scheduling (SPS) occasions each SPS occasion including multiple opportunities for a downlink transmission by a base station. The UE monitors for the downlink transmission during one or more opportunities of an SPS occasion. The base station transmits a packet to the UE in an opportunity of an SPS occasion based on an arrival time of the packet. In various configurations, a base station may transmit first information via a first communication opportunity and second information via a second communication opportunity of that same SPS occasion. A wireless communication device may monitor all communication opportunities of an SPS occasion to decode the information sent in two or more of the communication opportunities of the SPS occasion.

Claims (78)

1. A user equipment (UE), comprising:

one or more transceivers;

one or more memories, individually or in combination, having instructions; and

one or more processors, individually or in combination, configured to execute the instructions and cause the UE to:

receive, via the one or more transceivers, a configuration associated with a plurality of semi-persistent scheduling (SPS) occasions, with each SPS occasion including multiple opportunities associated with downlink transmission, wherein the plurality of SPS occasions include a first SPS occasion, and wherein the first SPS occasion includes a first set of multiple opportunities associated with downlink transmission;

receive, via the one or more transceivers, a first downlink transmission during one or more opportunities of the first set of multiple opportunities; and

transmit, via the one or more transceiver after receiving the first downlink transmission, a hybrid automatic repeat request (HARQ) feedback via an uplink resource, wherein the uplink resource is a same resource associated with each opportunity of the first set of multiple opportunities.

2. The UE of claim 1 , wherein the configuration comprises an indication of an offset time associated with a first opportunity of the first set of multiple opportunities, wherein the offset time is indicative of a slot start time relative to a scheduled arrival time of the first downlink transmission.

3. The UE of claim 2 , wherein the slot start time occurs prior to the scheduled arrival time of the first downlink transmission.

4. The UE of claim 1 , wherein the first downlink transmission is received via blind decoding each opportunity of the first set of multiple opportunities until the first downlink transmission is successfully received.

5. The UE of claim 1 , wherein each of the first set of multiple opportunities associated with the first SPS occasion map to the same uplink resource associated with the HARQ feedback associated with the first downlink transmission.

6. The UE of claim 5 , wherein the HARQ feedback comprises one bit associated with each opportunity of the first set of multiple opportunities.

7. The UE of claim 1 , wherein the one or more processors, individually or in combination, are further configured to:

receive, via the one or more transceivers, a downlink control information (DCI) comprising scheduling information associated with a retransmission and an index configured to indicate a HARQ identifier associated with a second SPS occasion for the retransmission.

8. The UE of claim 7 , wherein the one or more processors, individually or in combination, are further configured to:

perform HARQ combination of the retransmission with an opportunity of the second SPS occasion having a highest detection metric.

9. A base station, comprising:

one or more transceivers;

one or more memories, individually or in combination, having instructions; and

one or more processors, individually or in combination, configured to execute the instructions and cause the base station to:

transmit, via the one or more transceivers, a configuration associated with a plurality of semi-persistent scheduling (SPS) occasions including a first SPS occasion, with each SPS occasion including multiple opportunities associated with downlink transmission, wherein the first SPS occasion includes a first set of multiple opportunities associated with downlink transmission;

transmit, via the one or more transceivers, a first downlink transmission during one or more opportunities of the first set of multiple opportunities associated with the first SPS occasion based on an arrival time of the first downlink transmission; and

receive, via the one or more transceivers after the first downlink transmission, a hybrid automatic repeat request (HARQ) feedback via an uplink resource, wherein the uplink resource is a same resource associated with each opportunity of the first set of multiple opportunities.

10. The base station of claim 9 , wherein the configuration comprises an indication of an offset time associated with a first opportunity of the first set of multiple opportunities, wherein the offset time is indicative of a slot start time relative to a scheduled arrival time of the first downlink transmission.

11. The base station of claim 9 , wherein each of the first set of multiple opportunities associated with the first SPS occasion map to the same uplink resource associated with the HARQ feedback of the first downlink transmission.

12. A user equipment (UE), comprising:

one or more transceivers;

one or more memories, individually or in combination, having instructions; and

one or more processors, individually or in combination, configured to execute the instructions and cause the UE to:

receive, via the one or more transceivers, a message indicating a periodicity between multiple semi-persistent scheduling (SPS) occasions associated with a configured SPS;

receive, via the one or more transceivers and according to the periodicity, downlink information during a first SPS occasion of the multiple SPS occasions and via at least two of a plurality of communication opportunities, wherein the first SPS occasion comprises the plurality of communication opportunities; and

decode the downlink information.

13. The UE of claim 5 , wherein the downlink information comprises:

first information in a first communication opportunity of the plurality of communication opportunities; and

second information in a second communication opportunity of the plurality of communication opportunities.

14. The UE of claim 13 , wherein the one or more processors, individually or in combination, are further configured to:

conduct a first hybrid automatic repeat request (HARQ) process associated with the first information; and

conduct a second HARQ process associated with the second information in the second communication opportunity.

15. The UE of claim 13 , wherein the one or more processors, individually or in combination, are further configured to transmit, a physical uplink control channel (PUSCH) message comprising:

a first acknowledgement associated with the first information; and

a second acknowledgement associated with the second information.

16. The UE of claim 15 , wherein the one or more processors, individually or in combination, are further configured to receive, via the one or more transceivers, a downlink control information (DCI) after transmitting the PUSCH message, the DCI indicating at least one of:

a first resource associated with a retransmission of the first information; or

a second resource associated with a retransmission of the second information.

17. The UE of claim 13 , wherein:

the first information is associated with a first transport block; and

the second information is associated with a second transport block.

18. The UE of claim 13 , wherein:

the first communication opportunity is two slots in length; and

the second communication opportunity is one slot in length.

19. The UE of claim 13 , wherein the is one or more processors, individually or in combination, are further configured to:

generate a first acknowledgement associated with the first information; and

generate a second acknowledgement associated with the second information.

20. The UE of claim 13 , wherein the one or more processors, individually or in combination, are further configured to:

receive, via the one or more transceivers, the first information in the first communication opportunity via a first radio frequency (RF) band; and

receive, via the one or more transceivers, the second information in the second communication opportunity via a second RF band that is different from the first RF band.

21. A base station, comprising:

one or more transceivers;

one or more memories, individually or in combination, having instructions; and

one or more processors, individually or in combination, configured to execute the instructions and cause the base station to:

generate a message indicating a periodicity between multiple semi-persistent scheduling (SPS) occasions associated with a configured SPS;

transmit the message via the one or more transceivers; and

transmit, via the one or more transceivers according to the periodicity, a downlink transmission during a first SPS occasion of the multiple SPS occasions, the first SPS occasion comprising a plurality of communication opportunities, wherein the downlink transmission occupies at least two of the plurality of communication opportunities.

22. The base station of claim 21 , wherein the downlink transmission comprises:

first information in a first communication opportunity of the plurality of communication opportunities; and

second information in a second communication opportunity of the plurality of communication opportunities.

23. The base station of claim 22 , wherein the one or more processors, individually or in combination, are further configured to:

conduct a first hybrid automatic repeat request (HARQ) process associated with the first information; and

conduct a second HARQ process associated with the second information.

24. The base station of claim 22 , wherein the one or more processors, individually or in combination, are further configured to receive, via the one or more transceivers, a physical uplink control channel (PUSCH) message comprising:

a first acknowledgement associated with the first information; and

a second acknowledgement associated with the second information.

25. The base station of claim 24 , wherein the one or more processors, individually or in combination, are further configured to, after receiving the PUSCH message:

generate composite downlink control information (DCI) indicating a first resource associated with a first retransmission of the first information and second resource associated with a second retransmission of the second information; and

transmit the DCI.

26. The base station of claim 22 , wherein:

the first information is associated with a first transport block; and

the second information is associated with a second transport block.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 23, 2022
From: XUE, YISHENG; SUN, JING; ZHANG, XIAOXIA; LIU, CHIH-HAO; OZTURK, OZCAN; LUO, TAO; MONTOJO, JUAN; GAAL, PETER; KHOSHNEVISAN, MOSTAFA; GUPTA, PIYUSH; XU, CHANGLONG
To: QUALCOMM INCORPORATED
Reel/Frame 061311/0001 →
Priority Claims (2)
WO PCT/CN2020/088538 · May 1, 2020 · international
WO PCT/CN2020/088659 · May 6, 2020 · international
Continuity (1)
Related Publication 20220416955A1 · Dec 29, 2022
References Cited (29)
US 8595579B2 · Yang · 2013 [cited by examiner]
US 11646832B2 · Rastegardoost · 2023 [cited by examiner]
US 20150139155A1 · Wang · 2015 [cited by examiner]
US 20190132092A1 · Chen · 2019 [cited by examiner]
US 20190191416A1 · Xie · 2019 [cited by examiner]
US 20190268971A1 · Talarico · 2019 [cited by examiner]
US 20190281606A1 · Liu · 2019 [cited by examiner]
US 20190356455A1 · Yang · 2019 [cited by examiner]
US 20220191900A1 · Takeda · 2022 [cited by examiner]
US 20230112147A1 · Chien · 2023 [cited by examiner]
US 20230135551A1 · Gao · 2023 [cited by examiner]
US 20230164764A1 · Chen · 2023 [cited by examiner]
US 20230239077A1 · Gerami · 2023 [cited by examiner]
CN 103875201A · 2014 [cited by examiner]
CN 109565676A · 2019 [cited by applicant]
EP 3780717A1 · 2021 [cited by examiner]
WO WO2019112186A1 · 2019 [cited by examiner]
WO 2019193700A1 · 2019 [cited by applicant]
WO WO2019243249A1 · 2019 [cited by examiner]
WO 2020188815A1 · 2020 [cited by applicant]
WO 2022006580A1 · 2022 [cited by applicant]
3GPP TSG-RAN WG2 Meeting #108, Reno, USA, Nov. 18-Nov. 22, 2019, R2-1914403, Agenda Item: 6.2.2.5, Source: OPPO, Title: Remaining issues on NR-U configured grant. (Year: 2019). [cited by examiner]
3GPP TSG-RAN WG2 #106, Reno, US, May 13-17, 2019, Tdoc R2-1906838, Agenda Item: 11.7.2.2, Source: Ericsson, Title: On configuration aspects for multiple SPS and CG. (Year: 2019). [cited by examiner]
Supplementary Partial European Search Report—EP21797402—Search Authority—The Hague—Apr. 9, 2024. [cited by applicant]
Ericsson: “On Configuration Aspects for Multiple SPS and CG”, 3GPP TSG-RAN WG2 #106 Tdoc, R2-1906838, May 17, 2019 (May 17, 2019), 4 Pages, section 2.1. [cited by applicant]
International Search Report and Written Opinion—PCT/CN2020/088538—ISA/EPO—Feb. 3, 2021. [cited by applicant]
International Search Report and Written Opinion—PCT/CN2021/091455—ISA/EPO—Aug. 2, 2021. [cited by applicant]
OPPO: “Remaining Issues on NR-U Configured Grant”, 3GPP TSG-RAN WG2 Meeting #108, R2-1914403, Nov. 22, 2019 (Nov. 22, 2019), 7 Pages, section 2.1. [cited by applicant]
Supplementary European Search Report—EP21797402—Search Authority—The Hague—Jul. 25, 2024. [cited by applicant]