IP Library › Granted Patent US 12,620,636
Granted Patent B2
US 12,620,636 · App. 17/978,419 · Granted May 5, 2026

Method for monitoring and controlling a battery pack, system for monitoring and controlling a battery pack, battery management system

Inventors: Abouzede Mondoha (Stuttgart, DE); Simon Tippmann (Stuttgart, DE)
Assignee: Robert Bosch GmbH
H01M10/425B60L58/10H01M10/0445H01M10/482H01M2010/4271H01M2220/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,620,636
App. No.
17/978,419
Granted
May 5, 2026
Kind
B2
Abstract

A method for monitoring and controlling a vehicle battery pack that includes a plurality of battery cells. The battery cells each include a switching unit which serves to connect and disconnect the respective battery cells. Pack information of the battery pack is acquired, a pack voltage of the battery pack is calculated on the basis of the cell voltages and a current activation pattern for actuating the switching units. An electrical power requirement of the vehicle is predicted based on GPS information. A state of the battery pack is estimated based on the pack information and the current activation pattern and an optimized activation pattern for actuating the switching units on the basis of the predicted electrical power requirement and the estimated state of the battery pack is calculated. The switching units of the respective battery cells are actuated according to the optimized activation pattern.

Claims (40)

1 . A method for monitoring and controlling a battery pack ( 24 ) of a vehicle ( 10 ), which battery pack comprises a plurality of battery cells ( 2 ) interconnected in parallel and/or in series, the battery cells ( 2 ) each comprising a switching unit ( 40 ) which serves to connect and disconnect the respective battery cells ( 2 ) separately,

the method comprising the steps of:

acquiring, via one or more sensors, pack information of the battery pack ( 24 ), the pack information comprising at least cell voltages (V mes ), cell temperature (T mes ) of the respective battery cells ( 2 ), and a pack current (I pack,mes );

calculating a pack voltage (V pack ) of the battery pack ( 24 ) on the basis of the cell voltages (V mes ) of the respective battery cells ( 2 ) and a current activation pattern (u) for actuating the switching units ( 40 );

predicting, via a power prediction module ( 14 ), an electrical power requirement (P elec ) of the vehicle ( 10 ) based on information GPS Info acquired by a GPS module ( 12 ), wherein the information GPS Info includes a speed and location of the vehicle ( 10 );

estimating, via a state estimation module ( 60 ), the state (x s ) of the battery pack ( 24 ) based on the pack information and the current activation pattern (u);

calculating, via a control device, an optimized activation pattern (u*) for actuating the switching units ( 40 ) on the basis of the predicted electrical power requirement (P elec ) and the estimated state (x s ) of the battery pack ( 24 ); and

actuating, via the control device, the switching units ( 40 ) of the respective battery cells ( 2 ) according to the optimized activation pattern (u*) for actuating the switching units ( 40 ) for connecting and disconnecting the respective battery cells ( 2 ).

2 . The method according to claim 1 , wherein

the optimized activation pattern (u*) is calculated by means of model predictive control ( 76 ).

3 . The method according to claim 2 , wherein

the model predictive control ( 76 ) is performed based on Pareto optimization.

4 . A system ( 100 ) for monitoring and controlling a battery pack ( 24 ) of a vehicle ( 10 ), which battery pack comprises a plurality of battery cells ( 2 ) interconnected in parallel and/or in series, the battery cells ( 2 ) each comprising a switching unit ( 40 ) which serves to connect and disconnect the respective battery cells ( 2 ) separately, the system ( 100 ) comprising:

a GPS module ( 12 ) of the vehicle ( 10 ),

a power prediction module ( 14 ) configured to predict an electrical power requirement (P elec ) of the vehicle ( 10 ) on the basis of information GPS Info acquired by the GPS module ( 12 ), wherein the information GPS Info includes a speed and location of the vehicle ( 10 ),

a state estimation module ( 60 ) configured to estimate a state (x s ) of the battery pack ( 24 ) on the basis of pack information, and

a control device ( 70 ) configured to calculate an optimized activation pattern (u*) for actuating the switching units ( 40 ) on the basis of the predicted electrical power requirement (P elec ) and the estimated state (x s ) of the battery pack ( 24 ), and to actuate the switching units ( 40 ) of the respective battery cells ( 2 ) according to the optimized activation pattern (u*) for actuating the switching units ( 40 ) for connecting and disconnecting the respective battery cells ( 2 ).

5 . A battery management system for monitoring and controlling a battery system ( 20 ) of a vehicle ( 10 ), which battery system comprises at least one battery pack ( 24 ) having a plurality of battery cells ( 2 ) interconnected in parallel and/or in series, each comprising a switching unit ( 40 ) which serves to connect and disconnect the respective battery cells ( 2 ) separately, the battery management system comprising:

a power prediction module ( 14 ) configured to predict an electrical power requirement (P elec ) of the vehicle ( 10 ) based on information GPS Info acquired by the GPS module ( 12 ), wherein the information GPS Info includes a speed and location of the vehicle ( 10 ),

a state estimation module ( 60 ) configured to estimate a state (x s ) of the at least one battery pack ( 24 ), and

a control device ( 70 ) configured to calculate an optimized activation pattern (u*) for actuating the switching units ( 40 ) on the basis of the predicted electrical power requirement (P elec ) and the estimated state (x s ) of the at least one battery pack ( 24 ), and to actuate the switching units ( 40 ) of the respective battery cells ( 2 ) according to the optimized activation pattern (u*) for actuating the switching units ( 40 ) for connecting and disconnecting the respective battery cells ( 2 ).

6 . A battery system ( 20 ) of a vehicle ( 10 ), comprising at least one battery pack ( 24 ) having a plurality of battery cells ( 2 ) interconnected in parallel and/or in series, each comprising a switching unit ( 40 ) which serves to connect and disconnect the respective battery cells ( 2 ) separately,

wherein

the battery system ( 20 ) is configured to

predict an electrical power requirement (P elec ) of the vehicle ( 10 ) on the basis of information GPS Info acquired via a GPS module ( 12 ), wherein the information GPS Info includes a speed and location of the vehicle ( 10 ),

estimate a state (x s ) of the battery pack ( 24 ) on the basis of pack information, and

calculate an optimized activation pattern (u*) for actuating the switching units ( 40 ) on the basis of the predicted electrical power requirement (P elec ) and the estimated state (x s ) of the battery pack ( 24 ), and to actuate switching units ( 40 ) of the respective battery cells ( 2 ) according to the optimized activation pattern (u*) for actuating the switching units ( 40 ) for connecting and disconnecting the respective battery cells ( 2 ).

7 . The battery system ( 20 ) according to claim 6 , wherein the at least one battery pack ( 24 ) comprises one or more strings ( 26 ) of battery cells ( 2 ) which are interconnected in series within the respective strings ( 26 ).

8 . The battery system ( 20 ) according to claim 6 , wherein

the switching units ( 40 ) each comprise a first switching element ( 42 ) and a second switching element ( 44 ), the first switching element ( 42 ) and the corresponding battery cell ( 2 ) forming a series circuit ( 30 ), and the second switching element ( 44 ) being connected in parallel with the series circuit ( 30 ).

9 . The battery system ( 20 ) according to claim 8 , wherein

the first and the second switching element ( 42 , 44 ) are each designed as semiconductor switches.

10 . A vehicle ( 10 ) comprising

A battery pack having a plurality of battery cells ( 2 ) interconnected in parallel and/or in series, the battery cells ( 2 ) each comprising a switching unit ( 40 ) which serves to connect and disconnect the respective battery cells ( 2 ) separately, the vehicle configured to:

acquire, via one or more sensors, pack information of the battery pack ( 24 ), the pack information comprising at least cell voltages (V mes ), cell temperature (T mes ) of the respective battery cells ( 2 ), and a pack current (I pack, mes );

calculate a pack voltage (V pack ) of the battery pack ( 24 ) on the basis of the cell voltages (V mes ) of the respective battery cells ( 2 ) and a current activation pattern (u) for actuating the switching units ( 40 );

predict, via a power prediction module ( 14 ), an electrical power requirement (P elec ) of the vehicle ( 10 ) based on information GPS Info acquired by a GPS module ( 12 ) of the vehicle ( 10 ), wherein the information GPS Info includes a speed and location of the vehicle ( 10 );

estimate, via a state estimation module ( 60 ), the state (x s ) of the battery pack ( 24 ) based on the pack information and the current activation pattern (u);

calculate, via a control device, an optimized activation pattern (u*) for actuating the switching units ( 40 ) on the basis of the predicted electrical power requirement (P elec ) and the estimated state (x s ) of the battery pack ( 24 ); and

actuate, via the control device, the switching units ( 40 ) of the respective battery cells ( 2 ) according to the optimized activation pattern (u*) for actuating the switching units ( 40 ) for connecting and disconnecting the respective battery cells ( 2 ).

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 6, 2023
From: MONDOHA, ABOUZEDE; TIPPMANN, SIMON
To: ROBERT BOSCH GMBH
Reel/Frame 062598/0469 →
Priority Claims (1)
DE 102021212315.5 · Nov 2, 2021 · national
Continuity (1)
Related Publication 20230136580A1 · May 4, 2023
References Cited (14)
US 12395083B2 · Nakano · 2025 [cited by examiner]
US 20170361832A1 · Schwartz et al. · 2017 [cited by applicant]
US 20180131204A1 · Weicker · 2018 [cited by examiner]
US 20190052119A1 · Hendrix et al. · 2019 [cited by applicant]
US 20190196427A1 · Kaucic et al. · 2019 [cited by applicant]
US 20190273389A1 · Kahnt · 2019 [cited by examiner]
US 20200086748A1 · Bolger · 2020 [cited by examiner]
US 20200262308A1 · Sasahara · 2020 [cited by applicant]
US 20200293103A1 · Stanley · 2020 [cited by examiner]
US 20200381923A1 · Chow · 2020 [cited by examiner]
US 20210305653A1 · Liu · 2021 [cited by examiner]
US 20210339650A1 · Hashimoto · 2021 [cited by examiner]
US 20220242272A1 · Okamoto · 2022 [cited by examiner]
US 20220349718A1 · Nardimon · 2022 [cited by examiner]