IP Library › Granted Patent US 11,939,854
Granted Patent B2
US 11,939,854 · App. 17/991,007 · Granted Mar 26, 2024

Methods for detection and mitigation of well screen out

Inventors: Tony Yeung (Houston, TX); Ricardo Rodriguez-Ramon (Houston, TX); Joseph Foster (Houston, TX)
Assignee: BJ Energy Solutions, LLC
E21B43/267E21B21/08E21B43/12E21B43/26E21B43/2607G08B21/182
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,939,854
App. No.
17/991,007
Granted
Mar 26, 2024
Kind
B2
Abstract

Methods, systems, and controllers for detecting and mitigating well screen outs may include a controller configured to operate a fracturing pump to supply fluid at a discharge rate to a wellhead at a fracturing well site. The controller may also operate a blender positioned to deliver a blend of proppant and fluid to the fracturing pump. The controller may compare a fluid pressure increase rate to a preselected increase rate indicative of a potential well screen out. The controller may incrementally decrease the discharge rate of the fracturing pump and a flow rate of a blender when the fluid pressure increase rate of the wellhead exceeds the preselected increase rate and the fluid pressure is within a preselected percentage of a maximum wellhead pressure until the fluid pressure of the fluid supplied to the wellhead is stabilized.

Claims (54)

1. A method of detecting and mitigating well screen out at a fracturing well site, the method comprising:

operating one or more fracturing pumps to pump fluid to a wellhead at the fracturing well site;

sensing a fluid pressure of the fluid when supplied to the wellhead with one or more sensors;

measuring the fluid pressure of the fluid supplied to the wellhead; and

in response to:

(i) a fluid pressure increase rate of the fluid supplied to the wellhead being greater than a preselected increase rate, and

(ii) the fluid pressure of the fluid when supplied to the wellhead being greater than a preselected percentage of a selected maximum wellhead pressure:

decreasing incrementally, by a controller in communication with the one or more fracturing pumps and one or more blenders, a discharge rate of the one or more fracturing pumps and a flow rate of the fluid, the decreasing incrementally a discharge rate of the one or more fracturing pumps and a flow rate of the fluid including stopping delivery of the fluid prior to decreasing the discharge rate of the one or more fracturing pumps.

2. The method according to claim 1 , further comprising determining, by the controller, when the fluid pressure increase rate is greater than the preselected increase rate before the pressure of the fluid provided to the wellhead is within the preselected percentage of the maximum wellhead pressure.

3. The method according to claim 1 , wherein decreasing incrementally the discharge rate of the one or more fracturing pumps and the flow rate of the fluid by the controller includes decreasing the discharge rate of the one or more fracturing pumps prior to decreasing the flow rate of the fluid.

4. The method according to claim 1 , further comprising resuming the addition of fluid supplied to the one or more fracturing pumps after fluid pressure is stabilized.

5. The method according to claim 1 , further comprising terminating the detection and mitigation of well screen out in response to (a) the one or more fracturing pumps not operating in a pumping mode, or (b) one or more blenders not adding proppant to the fluid supplied to the one or more fracturing pumps.

6. A method of detecting and mitigating well screen out at a fracturing well site, the method comprising:

operating one or more pumps to pump fluid and proppant to a wellhead at the fracturing well site;

sensing a fluid pressure of the fluid supplied to the wellhead with one or more sensors;

measuring a fluid pressure of the fluid supplied to the wellhead by the one or more sensors at a location of one or more of:

(a) adjacent an output of the one or more fracturing pumps, or

(b) at the wellhead, the one or more sensors each configured to measure a fluid pressure of the fluid provided to the wellhead;

and

in response to:

(i) a fluid pressure increase rate of the fluid supplied to the wellhead being greater than a preselected increase rate, and

(ii) the fluid pressure of the fluid supplied to the wellhead being greater than a preselected percentage of a selected maximum wellhead pressure:

decreasing incrementally, by a controller, a discharge rate of the one or more fracturing pumps and a flow rate of the fluid until the fluid pressure is stabilized.

7. The method according to claim 6 , further comprising determining, by the controller, to provide an alert when the fluid pressure increase rate is greater than the preselected increase rate before the pressure of the fluid provided to the wellhead is within the preselected percentage of the selected maximum wellhead pressure.

8. The method according to claim 6 , wherein decreasing incrementally the discharge rate of the one or more fracturing pumps and the flow rate of the fluid by the controller includes decreasing the discharge rate of the one or more fracturing pumps prior to decreasing the flow rate of the fluid.

9. The method according to claim 6 , further comprising adding proppant to the fluid supplied to the one or more fracturing pumps after fluid pressure is stabilized.

10. The method according to claim 6 , further comprising terminating the detection and mitigation of well screen out in response to (a) the one or more fracturing pumps not operating in a pumping mode, or (b) one or more blenders not adding proppant to the fluid supplied to the one or more fracturing pumps.

11. A method of detecting and mitigating well screen out at a fracturing well site, the method comprising:

operating one or more fracturing pumps to pump fluid and proppant to a wellhead at the fracturing well site; and

controlling a discharge rate of the one or more fracturing pumps by a controller, the controller is:

calculating a fluid pressure increase rate of the fluid pressure;

comparing the fluid pressure increase rate of the fluid pressure to a preselected increase rate; and

decreasing incrementally the discharge rate of the one or more fracturing pumps and a flow rate of the fluid when the fluid pressure increase rate is greater than the preselected increase rate and the fluid pressure is within a preselected percentage of a selected maximum wellhead pressure of the wellhead until the fluid pressure of the fluid supplied to the wellhead is stabilized, the decreasing incrementally a discharge rate of the one or more fracturing pumps and a flow rate of the fluid including stopping delivery of proppant to one or more blenders prior to decreasing the discharge rate of the one or more fracturing pumps.

12. The method according to claim 11 , further comprising determining, by the controller, when the fluid pressure increase rate is greater than the preselected increase rate before the pressure of the fluid provided to the wellhead is within the preselected percentage of the selected maximum wellhead pressure.

13. The method according to claim 12 , further comprising activating an alarm, by the controller, when the fluid pressure increase rate is greater than the preselected increase rate before the pressure of the fluid provided to the wellhead is within the preselected percentage of the selected maximum wellhead pressure.

14. The method according to claim 11 , wherein decreasing incrementally the discharge rate of the one or more fracturing pumps and the flow rate of the fluid includes decreasing the discharge rate of the one or more fracturing pumps prior to decreasing the flow rate of the fluid.

15. The method according to claim 11 , further comprising adding proppant to the fluid supplied to the one or more fracturing pumps after fluid pressure is stabilized.

16. The method according to claim 11 , further comprising terminating the detection and mitigation of well screen out in response to: (a) the one or more fracturing pumps not operating in a pumping mode, or (b) the one or more blenders not adding proppant to the fluid supplied to the one or more fracturing pumps.

17. The method according to claim 11 , further comprising, verifying, by the controller, the preselected percentage of the maximum wellhead pressure of the wellhead is within a preselected range of up to 15,000 per square inch (psi).

18. A method of detecting and mitigating well screen out at a fracturing well site, the method comprising:

operating one or more pumps to pump fluid and proppant to a wellhead at the fracturing well site;

sensing a fluid pressure of the fluid supplied to the wellhead with one or more sensors;

measuring a fluid pressure of the fluid supplied to the wellhead by the one or more sensors at a location of one or more of:

(a) adjacent an output of the one or more fracturing pumps, or

(b) at the wellhead, the one or more sensors each configured to measure a fluid pressure of the fluid provided to the wellhead;

and

in response to:

(i) a fluid pressure increase rate of the fluid supplied to the wellhead being greater than a preselected increase rate, and

(ii) the fluid pressure of the fluid supplied to the wellhead being greater than a preselected percentage of a selected wellhead pressure:

decreasing incrementally, by one or more controllers, a discharge rate of the one or more fracturing pumps and a flow rate of the fluid until the fluid pressure is stabilized.

19. The method according to claim 18 , further comprising determining, by the one or more controllers, to provide an alert when the fluid pressure increase rate is greater than the preselected increase rate before the pressure of the fluid provided to the wellhead is within the preselected percentage of the selected wellhead pressure.

20. The method according to claim 19 , wherein decreasing incrementally the discharge rate of the one or more fracturing pumps and the flow rate of the fluid by the one or more controllers includes decreasing the discharge rate of the one or more fracturing pumps prior to decreasing the flow rate of the fluid.

21. The method according to claim 18 , further comprising adding proppant to the fluid supplied to the one or more fracturing pumps after fluid pressure is stabilized.

22. The method according to claim 18 , further comprising terminating the detection and mitigation of well screen out in response to (a) the one or more fracturing pumps not operating in a pumping mode, or (b) one or more blenders not adding proppant to the fluid supplied to the one or more fracturing pumps.

Assignments (3)
SECURITY INTEREST Recorded Sep 17, 2024
From: BJ ENERGY SOLUTIONS. LLC
To: ECLIPSE BUSINESS CAPITAL LLC. AS AGENT
Reel/Frame 068970/0125 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 21, 2022
From: YEUNG, TONY; RODRIGUEZ-RAMON, RICARDO; FOSTER, JOSEPH
To: BJ SERVICES, LLC
Reel/Frame 061839/0419 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 21, 2022
From: BJ SERVICES, LLC
To: BJ ENERGY SOLUTIONS, LLC
Reel/Frame 061839/0422 →
Continuity (5)
Continuation 17355920 · Jun 23, 2021
Continuation 17303841 · Jun 9, 2021
Continuation 17182408 · Feb 23, 2021
Provisional Application 62705050 · Jun 9, 2020
Related Publication 20230086213A1 · Mar 23, 2023