IP Library › Granted Patent US 12,312,774
Granted Patent B2
US 12,312,774 · App. 18/004,196 · Granted May 27, 2025

Excavation information processing device, work machine, excavation support device, and excavation information processing method

Inventors: Ryuta Okuwaki (Tokyo, JP); Kazuhiro Hatake (Tokyo, JP)
Assignee: KOMATSU LTD.
E02F9/26E02F3/32E02F9/261
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,312,774
App. No.
18/004,196
Granted
May 27, 2025
Kind
B2
Abstract

An excavation information processing device includes an acquisition unit configured to acquire target object position information indicating an excavation target object by position information of a plurality of points, and an excavation earth amount estimation unit configured to sequentially estimate and output an excavation earth amount acquired by a bucket when the bucket performs holding at that point in time based on bucket position and posture information indicating a position and a posture of the bucket and the target object position information.

Claims (25)

1. An excavation information processing device, comprising:

a processor configured to acquire target object position information indicating an excavation target object by position information of a plurality of points;

processor configured to sequentially estimate and output an excavation earth amount acquired by a bucket when the bucket performs holding at that point in time, based on a bucket position and posture information indicating a position and a posture of the bucket and the target object position information;

and a processor configured to output a determination result as to whether the excavation earth amount has reached a target excavation earth amount, the processor further configured to estimate an inside-bucket earth amount that is an earth amount stored in the bucket, estimate an outside-bucket earth amount that is an earth amount predicted to be scooped by the bucket in the future, the outside-bucket earth amount being based on a region of the excavation target object extending outwardly from a bucket surface, calculate the excavation earth amount by summing the inside-bucket earth amount and the outside-bucket earth amount;

and an electronic controller configured to switch from an excavation control to a holding control upon determining that the excavation earth amount has reached the target excavation earth amount.

2. The excavation information processing device according to claim 1 , wherein the processor is further configured to extract extracts, from the target object position information, the points located inside a circle drawn by a bucket teeth edge when the bucket is rotated about a bucket pin within a width of the bucket, and estimate estimates the excavation earth amount based on position information of the extracted points.

3. A work machine comprising: the excavation information processing device according to claim 1 ;

and the bucket.

4. An excavation support device, comprising:

a processor configured to acquire target object position information indicating an excavation target object by position information of a plurality of points;

an processor configured to sequentially estimate an excavation earth amount acquired by a bucket when the bucket performs holding at that point in time, based on a bucket position and posture information indicating a position and a posture of the bucket and the target object position information;

and a display unit configured to display the excavation earth amount;

and a processor configured to output a determination result as to whether the excavation earth amount has reached a target excavation earth amount, the processor further configured to estimate an inside-bucket earth amount that is an earth amount stored in the bucket, estimate an outside-bucket earth amount that is an earth amount predicted to be scooped by the bucket in the future, the outside-bucket earth amount being based on a region of the excavation target object extending outwardly from a bucket surface, calculate the excavation earth amount by summing the inside-bucket earth amount and the outside-bucket earth amount;

and an electronic controller configured to switch from an excavation control to a holding control upon determining that the excavation earth amount has reached the target excavation earth amount.

5. An excavation information processing method comprising the steps of:

acquiring target object position information indicating an excavation target object by position information of a plurality of points;

and sequentially estimating and outputting an excavation earth amount acquired by the bucket when a bucket performs holding at that point in time, based on bucket position and posture information indicating a position and a posture of the bucket and the target object position information;

estimating an inside-bucket earth amount that is an earth amount stored in the bucket, estimating an outside-bucket earth amount that is an earth amount predicted to be scooped by the bucket in the future, the outside-bucket earth amount being based on a region of the excavation target object extending outwardly from a bucket surface, calculating the excavation earth amount by summing the inside-bucket earth amount and the outside-bucket earth amount;

determining whether the excavation earth amount has reached a target excavation earth amount;

and switching from an excavation control to a holding control upon determining that the excavation earth amount has reached the target excavation earth amount.

6. A work machine comprising: the excavation information processing device according to claim 4 ;

and the bucket.

7. A work machine comprising: the excavation information processing device according to claim 1 ;

the bucket;

and a work equipment control device configured to move the bucket to a predetermined height when the excavation earth amount has reached the target excavation earth amount.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 4, 2023
From: OKUWAKI, RYUTA; HATAKE, KAZUHIRO
To: KOMATSU LTD.
Reel/Frame 062268/0952 →
Priority Claims (1)
JP 2020-134559 · Aug 7, 2020 · national
Continuity (1)
Related Publication 20230243127A1 · Aug 3, 2023
References Cited (20)
US 8942895B2 · Nomura · 2015 [cited by examiner]
US 11959254B2 · Sano · 2024 [cited by examiner]
US 20130158787A1 · Nomura · 2013 [cited by examiner]
US 20140167971A1 · Stanley · 2014 [cited by examiner]
US 20160040398A1 · Kitajima · 2016 [cited by examiner]
US 20170028922A1 · Matsuo et al. · 2017 [cited by applicant]
US 20170191246A1 · Friend · 2017 [cited by examiner]
US 20200041331A1 · Hoshino · 2020 [cited by examiner]
US 20200056346A1 · Izumikawa · 2020 [cited by examiner]
US 20200131740A1 · Hashimoto · 2020 [cited by examiner]
US 20200407949A1 · Aizawa · 2020 [cited by examiner]
CN 103080437A · 2013 [cited by applicant]
EP 3617410A1 · 2020 [cited by applicant]
EP 3779067A1 · 2021 [cited by applicant]
JP 201939207A · 2019 [cited by applicant]
JP 201939280A · 2019 [cited by applicant]
JP 202020153A · 2020 [cited by applicant]
WO 2015162710A1 · 2015 [cited by applicant]
WO 2018199143A1 · 2018 [cited by applicant]
WO 2019189260A1 · 2019 [cited by applicant]