IP Library Granted Patent US 12,134,949
Granted Patent B2
US 12,134,949 · App. 18/069,365 · Granted Nov 5, 2024

Processes for injection of fluids into a wellbore

Inventors: Francois Xavier Dubost (Villahermosa, MX); Magdy Samir Osman (Bucharest, RO); Ashers Partouche (Katy, TX); Morten Kristensen (Lysaker, NO); Hadrien Dumont (Paris, FR); Adriaan Gerard Gisolf (Voluntari, RO)
Assignee: Schlumberger Technology Corporation
E21B33/124E21B17/023E21B23/06E21B47/11E21B49/083
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,134,949
App. No.
18/069,365
Granted
Nov 5, 2024
Kind
B2
Abstract

Processes for injection of fluids into a wellbore via drill pipe. In some embodiments, the process can include positioning a downhole apparatus on a drill pipe. The process can also include placing the downhole apparatus at a desired station depth within a wellbore. The process can also include attaching a cable to the downhole apparatus from an up-hole environment. The process can also include setting at least one packer to seal a space between at least a portion of the downhole apparatus and an inner surface of the wellbore. The process can also include introducing a fluid to the downhole apparatus through the drill pipe and using a pump to inject at least a portion of the fluid into a geological stratum.

Claims (60)

1. A process comprising:

placing a downhole apparatus at a desired station depth within a wellbore;

attaching a cable to the downhole apparatus from an up-hole environment;

performing a first test of a saturation level of a geological stratum at the desired station depth;

setting a dual packer to seal a space between at least a portion of the downhole apparatus and an inner surface of the wellbore;

introducing a fluid to the downhole apparatus through a drill pipe,

circulating at least a portion of the fluid through a first line from a circulating sub to a bottom outlet;

creating a suction in a dual packer interval from an upper inlet into a secondary flowline;

replacing at least a portion of fluid from the dual packer interval with the portion of fluid circulated;

taking fluid from the dual packer interval;

determining whether the fluid taken from the dual packer interval is clean;

in response to a determination that the fluid taken from the dual packer interval is clean, operating a pump powered by an onboard power module to inject at least a portion of the fluid from the downhole apparatus into the geological stratum at the desired station depth, the onboard power module being included in the downhole apparatus and in electrical communication with the cable;

performing a second test of the saturation level of the geological stratum at the desired station depth; and

determining a change in the saturation level from the first test to the second test.

2. The process according to claim 1 , wherein the wellbore is an open-hole environment.

3. The process according to claim 1 , wherein the wellbore is a cased-hole environment.

4. The process according to claim 1 , wherein the downhole apparatus is a wireline apparatus.

5. The process according to claim 1 , wherein the fluid is one of a liquid and slurry.

6. The process according to claim 1 , wherein the fluid may comprise at least one of an acid, a proppant, an emulsifier, one or more hydrocarbons, a surfactant, a tracer, carbon dioxide, or nitrogen.

7. The process according to claim 1 , wherein the pump is a first pump and the at least a portion of the fluid is injected with a second pump located at a surface of the earth.

8. The process according to claim 1 , wherein the pump is onboard the downhole apparatus.

9. A process comprising:

positioning a downhole apparatus on a drill pipe;

placing the downhole apparatus at a desired station depth within a wellbore;

attaching a cable to the downhole apparatus from an up-hole environment;

performing a first geological stratum test at the desired station depth;

setting a dual packer to seal a space between at least a portion of the downhole apparatus and an inner surface of the wellbore;

introducing a fluid to the downhole apparatus through the drill pipe, wherein the fluid includes both a drill fluid and one of a fresh water volume and a brine volume, the one of the fresh water volume and the brine volume in a pill;

circulating at least a portion of the fresh water volume and the brine volume through a first line from a circulating sub to a bottom outlet;

creating a suction in a dual packer interval from an upper inlet into a secondary flowline;

replacing at least a portion of fluid from the dual packer interval with the portion of the fresh water volume and the brine volume;

taking fluid from the dual packer interval;

determining whether the fluid taken from the dual packer interval is clean;

in response to a determination that the fluid taken from the dual packer interval is clean, operating a pump powered by an onboard power module to inject at least a portion of the fluid from the downhole apparatus into a geological stratum at the desired station depth, the onboard power module being included in the downhole apparatus and in electrical communication with the cable;

performing a second geological stratum test at the desired station depth; and

determining a change from the first geological stratum test to the second geological stratum test.

10. The process according to claim 9 , wherein the dual packer comprises at least a first packer and a second packer longitudinally spaced apart from one another on the downhole apparatus, and wherein, once set, the first packer and the second packer provide a sealed volume therebetween.

11. The process according to claim 9 , wherein the downhole apparatus is a wireline apparatus.

12. The process according to claim 9 , where a volume of the fluid injected into the geological stratum is at least 23 L.

13. The process according to claim 9 , wherein the fluid is a liquid.

14. The process according to claim 9 , wherein the pump is a first pump and the at least a portion of the fluid is injected with a second pump located at a surface of the earth.

15. The process according to claim 9 , wherein the pump is onboard the downhole apparatus.

16. The process according to claim 9 , wherein the fluid comprises at least one of an acid, a proppant, an emulsifier, one or more hydrocarbons, a surfactant, or a tracer.

17. The process according to claim 9 , wherein the fluid further comprises a gas.

18. The process according to claim 17 , wherein the gas is an inert gas.

19. The process according to claim 17 , wherein the inert gas is one of carbon dioxide and nitrogen.

20. A process comprising:

placing a downhole apparatus at a desired station depth within a wellbore;

attaching a cable to the downhole apparatus from an up-hole environment;

performing a first geological stratum test at the desired station depth;

setting a dual packer to seal a space between at least a portion of the downhole apparatus and an inner surface of the wellbore;

introducing a fluid to the downhole apparatus through a drill pipe, wherein the fluid includes both a drill fluid and one of a fresh water volume and a brine volume, the one of the fresh water volume and the brine volume in a pill;

circulating at least a portion of the fresh water volume and the brine volume through a first line from a circulating sub to a bottom outlet;

creating a suction in a dual packer interval from an upper inlet into a secondary flowline;

replacing at least a portion of fluid from the dual packer interval with the portion of the fresh water volume and the brine volume;

taking fluid from the dual packer interval;

determining whether the fluid taken from the dual packer interval is clean;

in response to a determination that the fluid taken from the dual packer interval is clean, operating a pump powered by an onboard power module to inject at least a portion of the fluid from the downhole apparatus into a geological stratum at the desired station depth, the onboard power module being included in the downhole apparatus and in electrical communication with the cable;

performing a second geological stratum test at the desired station depth during presence of the pill at a site of the stratum test; and

determining a change from the first geological stratum test to the second geological stratum test.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2024
From: DUBOST, FRANCOIS XAVIER; OSMAN, MAGDY SAMIR; PARTOUCHE, ASHERS; KRISTENSEN, MORTEN; DUMONT, HADRIEN; GISOLF, ADRIAAN GERARD
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 066573/0976 →
Continuity (1)
Related Publication 20240209728A1 · Jun 27, 2024
Cited By (4)
US 12,428,928 US 12,523,105 US 12,553,333 US 12,704,061