IP Library Granted Patent US 12,435,533
Granted Patent B2
US 12,435,533 · App. 18/069,501 · Granted Oct 7, 2025

Construction system

Inventors: Yaniv Cohen (Givat Ela, IL); Ziv Raz (Even Yehuda, IL); Brad Cameron (Fountain Hills, AZ); Daniel Kedem (Tel Aviv-Jaffa, IL)
Assignee: Wall to Wall, LLC
E04H9/021E04H9/024
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,435,533
App. No.
18/069,501
Granted
Oct 7, 2025
Kind
B2
Abstract

A modular construction system comprising: a first prefabricated building component including: a first plurality of support members extending parallel to each other in a first direction; and a first lateral force collector configured to transfer lateral forces; a second prefabricated building component including: a second plurality of support members extending parallel to each other in a second direction; and a second lateral force collector configured to transfer the lateral forces; and a connector extending between the first lateral force collector and the second lateral force collector configured to transfer the lateral forces therebetween.

Claims (54)

1. A modular construction system comprising:

a first prefabricated building component including:

a first plurality of support members extending parallel to each other in a first direction, the first plurality of support members comprising a first plurality of trusses, wherein each of the first plurality of trusses includes a first top chord, a first bottom chord, and first web members extending therebetween; and

a first lateral force collector configured to transfer lateral forces, wherein the first lateral force collector extends parallel to the first plurality of support members and comprises one of the first bottom chords;

a second prefabricated building component including:

a second plurality of support members extending parallel to each other in a second direction; and

a second lateral force collector configured to transfer the lateral forces; and

a connector extending between the first lateral force collector and the second lateral force collector configured to transfer the lateral forces therebetween.

2. The modular construction system according to claim 1 , wherein the first lateral force collector and the second lateral force collector are colinear.

3. The modular construction system according to claim 1 , wherein the first lateral force collector is mounted on top of the first bottom chords of the first plurality of trusses.

4. The modular construction system according to claim 3 , wherein the first lateral force collector includes a first extender extending down to a level even with a bottom of the first bottom chord.

5. The modular construction system according to claim 3 , wherein each of the second plurality of trusses including a second top chord, a second bottom chord, and second web members extending therebetween; and wherein the second lateral force collector extends perpendicular to the second plurality of trusses, and is mounted on top of the second bottom chords thereof.

6. The modular construction system according to claim 5 , wherein the second lateral force collector includes a second extender extending down to the level even with a bottom of the second bottom chord.

7. The modular construction system according to claim 6 , wherein the first lateral force collector is mounted on top of the first bottom chords of the first plurality of trusses; and wherein the connector extends between the first extender and the second extender.

8. The modular construction system according to claim 7 , wherein the connector is configured to connect the first extender and the second extender along bottom surfaces of the first and second extenders.

9. The modular construction system according to claim 5 , wherein the first lateral force collector extends out one side of the first prefabricated building component; and

wherein the second lateral force collector extends out one side of the second prefabricated building component; and

wherein the connector includes a first mating connector on the first lateral force collector, and a second mating connector on the second lateral force collector configured to interconnect with the first mating connector.

10. The modular construction system according to claim 1 , wherein the second lateral force collector extends parallel to the second plurality of support members.

11. The modular construction system according to claim 10 , wherein the first lateral force collector and the second lateral force collector extend along parallel axes; and wherein the second plurality of support members comprises a second plurality of trusses, wherein each of the second plurality of trusses including a second top chord, a second bottom chord, and second web members extending therebetween; and wherein the second lateral force collector comprises one of the second bottom chords.

12. The modular construction system according to claim 1 , further comprising a first wall;

wherein the connector comprises:

a first wall mounting member configured to mount on a first side of the first wall and configured to receive a first end of the first lateral force collector;

a second wall mounting member configured to mount on a second side of the first wall configured to be to receive a first end of the second lateral force collector; and

a wall collector configured to mount in the first wall and connected to the first wall mounting member and the second wall mounting member.

13. The modular construction system according to claim 12 , further comprising a second wall; and a first L-bracket mounted on a first side of the second wall configured to receive ends of the first plurality of support members or one of the first plurality of support members.

14. The modular construction system according to claim 1 , further comprising a first bottom layer on the first plurality of support members, and a first top layer mounted on the first plurality of support members.

15. The modular construction system according to claim 14 , wherein the first bottom layer comprises drywall.

16. The modular construction system according to claim 14 , wherein the first top layer comprises concrete.

17. The modular construction system according to claim 1 , further comprising a second bottom layer on the second plurality of support members, and a second top layer of mounted on the second plurality of support members.

18. The modular construction system according to claim 17 , wherein the second bottom layer comprises drywall.

19. The modular construction system according to claim 17 , wherein the second top layer comprises concrete.

20. The modular construction system according to claim 17 , further comprising first bridging members extending between adjacent ones of the first plurality of support members, the first lateral force collector and the first top layer.

21. The modular construction system according claim 1 , wherein the first prefabricated building component or the second prefabricated building component comprises a shear wall.

22. A modular construction system comprising:

a first prefabricated building component including:

a first plurality of support members extending parallel to each other in a first direction; and

a first lateral force collector extending out one side of the first prefabricated building component and configured to transfer lateral forces; and

a connector connected to the first lateral force collector and configured to connect the first lateral force collector to a second lateral force collector for transferring the lateral forces therebetween, wherein the connector includes a first mating connector on the first lateral force collector configured to mate with a second mating connector on the second lateral force collector.

23. The modular construction system according to claim 22 , wherein the first plurality of support members comprises a first plurality of trusses, wherein each of the first plurality of trusses including a first top chord, a first bottom chord, and first web members extending therebetween; and wherein the first lateral force collector extends perpendicular to the first plurality of trusses, and is mounted on top of the first bottom chords of the first plurality of trusses.

24. The modular construction system according to claim 23 , wherein the first lateral force collector includes a first extender extending down to a level even with a bottom of the first bottom chord.

25. The modular construction system according to claim 24 , wherein the connector is configured to connect the first extender to a second extender in an adjacent floor component along bottom surfaces of the first and second extenders.

26. The modular construction system according to claim 22 , wherein the first plurality of support members comprises a first plurality of trusses, wherein each of the first plurality of trusses including a first top chord, a first bottom chord, and first web members extending therebetween; and wherein the first lateral force collector extends parallel to the first plurality of trusses.

27. The modular construction system according to claim 26 , wherein the first lateral force collector comprises one of the first bottom chords.

28. The modular construction system according to claim 22 , further comprising a first wall;

wherein the connector comprises:

a first wall mounting member configured to mount on a first side of the first wall and configured to receive a first end of the first lateral force collector;

a second wall mounting member configured to mount on a second side of the first wall configured to be to receive a first end of the second lateral force collector; and

a wall collector configured to mount in the first wall and connected to the first wall mounting member and the second wall mounting member.

29. The modular construction system according to claim 28 , further comprising a first L-bracket for mounting on a first side of a second wall configured to receive ends of the first plurality of support members.

30. The modular construction system according to claim 22 , further comprising a first bottom layer on the first plurality of support members, and a first top layer mounted on the first plurality of support members.

31. The modular construction system according to claim 30 , wherein the first bottom layer comprises drywall.

32. The modular construction system according to claim 30 , wherein the first top layer comprises one or more of concrete, insulation, RPG, PV cells.

33. The modular construction system according claim 22 , further comprising a shear wall connected to the first lateral force collector.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 11, 2025
From: VEEV GROUP, INC.
To: WALL TO WALL, LLC
Reel/Frame 072229/0186 →
INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Dec 19, 2023
From: VEEV (ASSIGNMENT FOR THE BENEFIT OF CREDITORS), LLC
To: LEN FW INVESTOR, LLC
Reel/Frame 066076/0711 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 28, 2023
From: COHEN, YANIV; RAZ, ZIV; CAMERON, BRAD; KEDEM, DANIEL
To: VEEV GROUP, INC.
Reel/Frame 064721/0234 →
INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Feb 7, 2023
From: VEEV GROUP, INC.
To: LEN FW INVESTOR, LLC
Reel/Frame 062669/0279 →
Priority Claims (1)
IL 289522 · Dec 30, 2021 · national
Continuity (1)
Related Publication 20230212870A1 · Jul 6, 2023
References Cited (26)
US 3067544A · Willatts · 1962 [cited by examiner]
US 4187652A · Bobrovnikov · 1980 [cited by examiner]
US 4648216A · Reaves · 1987 [cited by examiner]
US 5218804A · Campbell · 1993 [cited by examiner]
US 6158189A · Lau · 2000 [cited by examiner]
US 7549263B1 · Porter · 2009 [cited by examiner]
US 7779590B2 · Hsu et al. · 2010 [cited by applicant]
US 7849649B2 · Tonyan · 2010 [cited by examiner]
US 20020007611A1 · Sanford · 2002 [cited by examiner]
US 20090272051A1 · Sipe · 2009 [cited by examiner]
US 20100180540A1 · Shepard · 2010 [cited by examiner]
US 20140260024A1 · Tate · 2014 [cited by examiner]
US 20150167289A1 · Wang · 2015 [cited by applicant]
US 20150211229A1 · Gosling · 2015 [cited by examiner]
US 20160024779A1 · Clus · 2016 [cited by examiner]
US 20160053488A1 · Lehane · 2016 [cited by examiner]
US 20170197811A1 · Cui · 2017 [cited by examiner]
US 20180305925A1 · Cecchetto, Jr. · 2018 [cited by examiner]
US 20180328034A1 · Cecchetto, Jr. · 2018 [cited by examiner]
US 20180355603A1 · Hall · 2018 [cited by examiner]
US 20190242112A1 · LeBlang · 2019 [cited by examiner]
US 20220025663A1 · Heitsman · 2022 [cited by examiner]
US 20220145632A1 · Aitken · 2022 [cited by examiner]
US 20220389709A1 · LeBlang · 2022 [cited by examiner]
ALL-FAB (Year: 2021). [cited by examiner]
Office Action and Search Report dated May 12, 2024, directed to IL Application No. 289522; 8 pages. [cited by applicant]