IP Library › Granted Patent US 12,242,236
Granted Patent B2
US 12,242,236 · App. 18/079,632 · Granted Mar 4, 2025

Control system and control method for remotely installed controller devices

Inventors: Yuuzou Hasegawa (Tokyo, JP); Kazuyuki Ito (Tokyo, JP); Masanori Shibayama (Tokyo, JP)
Assignees: YOKOGAWA ELECTRIC CORPORATION; NTT Communications Corporation
G05B19/054G05B19/058G06F11/3006G06F11/3055G06F11/3089
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,242,236
App. No.
18/079,632
Granted
Mar 4, 2025
Kind
B2
Abstract

A process control system 100 includes a plurality of controller devices 10 each of which performs process control on a plant, and an input-output device 20 that is connected to a target device of the process control. The input-output device 20 is installed in a different on-premise environment from the plurality of controller devices 10 . Each of the controller devices 10 is connected to the input-output device 20 by a different closed network 40 , and transmits and receives information on the process control on the plant to and from the input-output device 20.

Claims (32)

1. A control system comprising:

a plurality of controller devices each performing process control on a plant and being installed in a different data center from one another;

an input-output device that is connected to a target device of the process control;

a control switching device that switches a state of each of the controller devices to one of an active state, a standby state, and a stopped state; and

a monitoring device that receives information on switching of the state, wherein

the control switching device includes a switch control unit that performs switching such that the state of at least one of the controller devices enters the active state upon receiving a notice related to switching of the state from the monitoring device,

the input-output device is installed in an on-premise environment, separate from the environment that includes the plurality of controller devices,

each of the controller devices is connected to the input-output device by a different dedicated closed network, and includes a control unit that transmits and receives information on the process control to and from the input-output device, and

the monitoring device further includes

an external monitoring device that is installed in a different data center from each of the data centers in which each of the controller devices is installed and that is configured to monitor information on planned maintenance that is notified by one of a cloud vender and a communication vender and that is configured to switch the state of the controller devices according to the information on the planned maintenance, and

a plurality of internal monitoring devices that are installed in each of the data centers in which each of the controller devices is installed and that are configured to monitor information on a failure in one of a cloud infrastructure and a communication infrastructure and that are configured to switch the state of the controller devices according to the information on the failure.

2. The control system according to claim 1 , wherein

the external monitoring device further includes

a notifying unit that transmits the notice related to switching of the state to each of control switching devices installed in each of the data centers.

3. The control system according to claim 1 , wherein

the external monitoring device further includes

a receiving unit that receives, as the information on switching of the state, information on planned maintenance that is notified by one of the cloud vender and the communication vender.

4. The control system according to claim 1 , wherein

each of the internal monitoring devices includes a notifying unit that transmits the notice related to switching of the state to the control switching device installed in each of the data centers.

5. The control system according to claim 1 , wherein each of the internal monitoring devices includes a receiving unit that receives, as the information on switching of the state, information on a failure in one of the cloud infrastructure and the communication infrastructure.

6. A control method of a control system, the control system including

a plurality of controller devices each performing process control on a plant and being installed in a different data center from one another;

an input-output device that is connected to a target device of the process control;

a control switching device that switches a state of each of the controller devices to one of an active state, a standby state, and a stopped state; and

a monitoring device that receives information on switching of the state, wherein

the input-output device is installed in an on-premise environment, separate from the environment that includes the plurality of controller devices,

each of the controller devices is connected to the input-output device by a different dedicated closed network,

the monitoring device further includes

an external monitoring device that is installed in a different data center from each of the data centers in which each of the controller devices is installed and that is configured to monitor information on planned maintenance that is notified by one of a cloud vender and a communication vender and that is configured to switch the state of the controller devices according to the information on the planned maintenance, and

a plurality of internal monitoring devices that are installed in each of the data centers in which each of the controller devices is installed and that are configured to monitor information on a failure in one of a cloud infrastructure and a communication infrastructure and that are configured to switch the state of the controller devices according to the information on the failure, and

the control method comprising:

transmitting and receiving information on the process control between each of the controller devices and the input-output device.

Assignments (2)
CHANGE OF NAME Recorded Feb 10, 2026
From: NTT COMMUNICATIONS CORPORATION
To: NTT DOCOMO BUSINESS, INC.
Reel/Frame 074717/0186 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 12, 2022
From: HASEGAWA, YUUZOU; ITO, KAZUYUKI; SHIBAYAMA, MASANORI
To: YOKOGAWA ELECTRIC CORPORATION; NTT COMMUNICATIONS CORPORATION
Reel/Frame 062060/0143 →
Priority Claims (1)
JP 2021-205142 · Dec 17, 2021 · national
Continuity (1)
Related Publication 20230195070A1 · Jun 22, 2023
References Cited (32)
US 5088021A · McLaughlin · 1992 [cited by examiner]
US 5898829A · Morikawa · 1999 [cited by applicant]
US 6272386B1 · McLaughlin · 2001 [cited by examiner]
US 10152048B2 · Hefeeda · 2018 [cited by examiner]
US 10573147B1 · Mousavi · 2020 [cited by examiner]
US 10917358B1 · Herle · 2021 [cited by examiner]
US 11481282B2 · McLaughlin · 2022 [cited by examiner]
US 12069498B2 · Shahdad · 2024 [cited by examiner]
US 20130041485A1 · Gunzert · 2013 [cited by examiner]
US 20130211546A1 · Lawson · 2013 [cited by examiner]
US 20130268672A1 · Justafort · 2013 [cited by examiner]
US 20150036480A1 · Huang · 2015 [cited by examiner]
US 20150378356A1 · Hefeeda · 2015 [cited by examiner]
US 20170199515A1 · Bhat · 2017 [cited by examiner]
US 20180321662A1 · Nixon et al. · 2018 [cited by applicant]
US 20190042378A1 · Wouhaybi · 2019 [cited by examiner]
US 20200103861A1 · Flood · 2020 [cited by examiner]
US 20200310920A1 · McLaughlin · 2020 [cited by examiner]
US 20220353244A1 · Kahn · 2022 [cited by examiner]
US 20240022932A1 · Shahdad · 2024 [cited by examiner]
CA 3156775A1 · 2021 [cited by examiner]
EP 3715970A1 · 2020 [cited by applicant]
JP 2003140986A · 2003 [cited by applicant]
JP 2004112246A · 2004 [cited by applicant]
JP 4099816B2 · 2008 [cited by applicant]
WO WO2018231932A1 · 2018 [cited by examiner]
WO WO2023091036A1 · 2023 [cited by examiner]
Machine Translation of Chinese Patent Application CN 112995001 A, Jun. 18, 2021. (Year: 2021). [cited by examiner]
‘The State of Cloud-Based Automation Today’ by Stephanie Neil, Sep. 14, 2021. (Year: 2021). [cited by examiner]
‘Industrial Automation as a Cloud Service’ by Hegazy and Hefeeda, IEEE Transactions on Parallel and Distributed Systems, vol. 26, No. 10, Oct. 2015. (Year: 2015). [cited by examiner]
Extended European Search Report dated Apr. 28, 2023, issued in counterpart EP Application No. 22213458.7. (9 pages). [cited by applicant]
Office Action dated Nov. 26, 2024, issued in counterpart JP application No. 2021-205142, with English translation. (8 pages). [cited by applicant]