IP Library › Granted Patent US 12,338,571
Granted Patent B2
US 12,338,571 · App. 18/108,388 · Granted Jun 24, 2025

Method of controlling laundry treating apparatus

Inventors: Hongki Choi (Seoul, KR); Mikyung Kim (Seoul, KR); Deokjoon Jeong (Seoul, KR)
Assignee: LG ELECTRONICS INC.
D06F58/44D06F73/02D06F58/12D06F58/203D06F58/206D06F58/38D06F58/42D06F2103/32D06F2103/36D06F2105/00D06F2105/24D06F2105/26D06F2105/30D06F2105/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,338,571
App. No.
18/108,388
Granted
Jun 24, 2025
Kind
B2
Abstract

Disclosed herein is a method of controlling a laundry treating apparatus, if a user selects a uniform course, including performing a preheating operation of a heater to generate steam, performing a first cooling operation to operate a blower unit and a moving hanger after the preheating operation has been terminated, performing a steam operation to operate the blower unit and a steam unit and to circulate steam to a treating chamber after the first cooling operation has been terminated, performing a standby operation to operate the blower unit after the steam operation has been terminated, performing a second cooling operation to operate the blower unit after the standby operation has been terminated, and performing a drying operation to operate the blower unit and a heat pump unit and to provide heat to the treating chamber to dry the treating chamber after the second cooling operation has been terminated.

Claims (27)

1. A method of controlling a laundry treating apparatus, the laundry treating apparatus comprising a case, a treating chamber located inside the case and configured to receive clothes, a hanger disposed in the treating chamber to hang the clothes thereon, a cycle chamber located below the treating chamber inside the case and configured to accommodate a steam unit for generating and supplying steam and a blower unit, the method comprising:

performing a preheating operation by supplying power to the steam unit for preheating water in the steam unit using a heater of the steam unit;

performing a first cooling operation for circulating air in the treating chamber by operating the blower unit with a first cooling rpm in the treating chamber;

supplying steam into the treating chamber by operation of the steam unit after the first cooling operation;

performing a second cooling operation for circulating air in the treating chamber by operating the blower unit with a second cooling rpm in the treating chamber after supplying steam, and

supplying hot air into the treating chamber for drying clothes by operating a heat pump unit inside the cycle chamber after the second cooling operation,

wherein the preheating operation ends together with the first cooling operation or before the first cooling operation.

2. The method of claim 1 , wherein a first cooling time for performing the first cooling operation is longer than the second cooling time for performing the second cooling operation.

3. The method of claim 1 , wherein the blower unit operates with a steam rpm, while supplying steam.

4. The method of claim 1 , wherein the first cooling rpm is higher than the steam rpm, wherein the second cooling rpm is equal to or higher than the first cooling rpm.

5. The method of claim 1 , wherein, during supplying the hot air into the treating chamber, a blower unit operates with a dryness rpm for circulating air in the treating chamber.

6. The method of claim 1 , wherein the heat pump unit includes a compressor to compress a refrigerant and a condenser to exchange heat between the refrigerant compressed by the compressor and the air circulated by the blower unit, and

wherein, during supplying the hot air into the treating chamber, the compressor operates with a different operating speed based on a preheating inlet temperature measured by an inlet temperature sensor of the blower unit during the preheating operation.

7. The method of claim 6 , wherein the compressor operates at a predetermined first operating speed if the preheating inlet temperature is lower than a predetermined reference inlet temperature, and

wherein the compressor at a predetermined second operating speed if the preheating inlet temperature is higher than or equal to the predetermined reference inlet temperature.

8. The method of claim 7 , wherein the second operating speed is less than the first operating speed.

9. The method of claim 1 , further comprising:

performing a standby operation to operate the blower unit with a standby rpm between supplying steam and performing the second cooling operation.

10. The method of claim 9 , wherein the first cooling rpm is higher than the steam rpm and the standby rpm.

11. The method of claim 9 , wherein the steam rpm is equal to the standby rpm.

12. The method of claim 9 , wherein a standby time for performing the standby operation is longer than a second cooling time for performing the second cooling operation.

13. The method of claim 1 , wherein the preheating operation performs before the first cooling operation or during the first cooling operation.

14. The method of claim 1 , wherein the first cooling operation and the preheating operation end simultaneously.

15. The method of claim 1 , wherein, during the preheating operation, a water supply tank located forward to the cycle chamber below the treating chamber supplies the water to the steam unit.

16. The method of claim 1 , a preheating time for the preheating operation is shorter than a first cooling time for performing the first cooling operation.

17. The method of claim 16 , the first cooling time is longer than a second cooling time for performing the second cooling operation.

18. The method of claim 17 , the preheating time is shorter than the second cooling time.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 10, 2023
From: CHOI, HONGKI; KIM, MIKYUNG; JEONG, DEOKJOON
To: LG ELECTRONICS INC.
Reel/Frame 062703/0606 →
Priority Claims (1)
KR 10-2016-0067278 · May 31, 2016 · national
Continuity (3)
Continuation 17704529 · Mar 25, 2022
Continuation 15608467 · May 30, 2017
Related Publication 20230193552A1 · Jun 22, 2023
References Cited (28)
US 4761896A · Miyata · 1988 [cited by applicant]
US 8726544B2 · Valiyambath Krishnan · 2014 [cited by examiner]
US 11319663B2 · Choi · 2022 [cited by examiner]
US 11578454B2 · Choi · 2023 [cited by examiner]
US 20090126423A1 · Bae · 2009 [cited by examiner]
US 20100050465A1 · Im · 2010 [cited by examiner]
US 20120246839A1 · Park · 2012 [cited by examiner]
US 20130198971A1 · Doh · 2013 [cited by applicant]
US 20160273153A1 · Nam · 2016 [cited by examiner]
CN 1037557A · 1989 [cited by applicant]
CN 101415879A · 2009 [cited by applicant]
CN 101772601A · 2010 [cited by applicant]
CN 102119277A · 2011 [cited by applicant]
CN 102656311A · 2012 [cited by applicant]
CN 102725446A · 2012 [cited by applicant]
EP 1870506A1 · 2007 [cited by applicant]
EP 2182104A2 · 2010 [cited by examiner]
EP 2594690A1 · 2013 [cited by applicant]
EP 2623662A1 · 2013 [cited by applicant]
EP 2733257A1 · 2014 [cited by applicant]
JP 2002028398A · 2002 [cited by applicant]
JP 2009291233A · 2009 [cited by applicant]
KR 1020070052733A · 2007 [cited by applicant]
KR 100808868B1 · 2008 [cited by applicant]
KR 1020110067890A · 2011 [cited by applicant]
KR 1020110067891A · 2011 [cited by applicant]
WO 2009020311A2 · 2009 [cited by applicant]
WO 2011074850A2 · 2011 [cited by applicant]