IP Library Granted Patent US 12,590,940
Granted Patent B2
US 12,590,940 · App. 18/115,367 · Granted Mar 31, 2026

System and method for estimating reservoir fluid contamination

Inventors: Sefer Coskun (Houston, TX); Anup Hunnur (Houston, TX); Alireza Shahkarami (Houston, TX); Junjie Yang (Houston, TX); Emiliano Hall (Jandakot, AU)
Assignee: Baker Hughes Oilfield Operations LLC
G01N33/2823E21B49/08G01V20/00G06N3/08E21B2200/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,590,940
App. No.
18/115,367
Granted
Mar 31, 2026
Kind
B2
Abstract

A system and method for determining reservoir fluid contamination of a reservoir is disclosed. The system includes one or more sensors to detect field measures from reservoir fluid of the reservoir and includes memory and at least one processor to execute instructions from the memory to cause the system to perform further steps. A step by the at least one processor is to simulate relationship data having purity levels correlated to volumes or times associated with extraction of an applied or simulated fluid for varying modeled rock formations. A further step is to fit one or more of the relationship data to the field measures to generate errors. Yet another step is to determine the reservoir fluid contamination from one of the purity levels that is associated with the relationship data that is within a threshold error value or error range of the errors.

Claims (57)

1 . A system for determining reservoir fluid contamination for a reservoir, the system comprising:

one or more sensors to detect field measures from reservoir fluid of the reservoir; and

memory and at least one processor to execute instructions from the memory to cause the system to:

simulate a plurality of relationship data comprising a plurality of purity levels correlated to a plurality of volumes or times associated with extraction of an applied or simulated fluid for varying modeled rock formations;

fit one or more of the plurality of relationship data to the field measures to generate a plurality of errors; and

determine the reservoir fluid contamination from at least one of the plurality of purity levels that is associated with the one or more of the plurality of relationship data that is within a threshold error value or an error range of the plurality of errors.

2 . The system of claim 1 , wherein the at least one processor executes the instructions from the memory to further cause the system to:

project the plurality of errors to a distribution; and

determine the threshold error value or the error range from a mean of the distribution.

3 . The system of claim 1 , wherein the at least one processor executes the instructions from the memory to further cause the system to:

train one or more neural networks using at least the plurality of relationship data and the plurality of errors; and

infer the reservoir fluid contamination for a new reservoir based in part on new field measures used with the one or more neural networks.

4 . The system of claim 1 , wherein the one or more sensors are adapted for sensing one or more of optical measures, sound speed measures, refractive index measures, density measures, and viscosity measures as part of the field measures from the reservoir fluid of the reservoir.

5 . The system of claim 1 , wherein the at least one processor executes the instructions from the memory to further cause the system to:

generate a modeled rock formation to comprise pore structure using one or more images of a physical rock formation and using a plurality of physical variables; and

simulate purity measures and volume or time measures for the modeled rock formation, the purity measures and the volume or time measures to be comprised in the plurality of relationship data.

6 . The system of claim 1 , wherein the varying modeled rock formations are generated from input data comprising one or more of a simulated formation pressure, a simulated formation porosity, a simulated formation permeability, a simulated formation flow rate, a simulated invasion parameter, a simulated anisotropy ratio, and simulated packers.

7 . The system of claim 1 , wherein the at least one processor executes the instructions from the memory to further cause the system to:

apply a smoothening algorithm to the field measures to generate a smoothened version of the field measures; and

fit an individual set of the smoothened version of the field measures to an individual set of the plurality of relationship data to identify a linear match, wherein the linear match is used in part to generate the plurality of errors.

8 . The system of claim 1 , wherein the at least one processor executes the instructions from the memory to further cause the system to:

determine a purity level based in part on an extracted applied fluid through an individual physical rock formation having an injected contaminant and created as part of one or more physical rock formations from the varying modeled rock formations, the purity level contributing to the plurality of purity levels and a volume or a time of the extracted applied fluid contributing to the plurality of volumes or times.

9 . The system of claim 1 , wherein the at least one processor executes the instructions from the memory to further cause the system to:

determine a volume or a time associated with the reservoir fluid from a sample taken from the reservoir; and

determining the reservoir fluid contamination for the sample based in part on an extrapolation of the volume or the time to at least one of the plurality of relationship data after applying one of the plurality of errors.

10 . The system of claim 1 , wherein the at least one processor executes the instructions from the memory to further cause the system to:

extrapolate, using the reservoir fluid contamination, a further reservoir fluid contamination for future volumes or times of the reservoir fluid extracted from the reservoir.

11 . A method for determining reservoir fluid contamination for a reservoir, the method comprising:

detecting, using one or more sensors, field measures from reservoir fluid of the reservoir;

simulating, using at least one processor, a plurality of relationship data comprising a plurality of purity levels correlated to a plurality of volumes or times associated with extraction of an applied or simulated fluid for varying modeled rock formations;

fitting, using the at least one processor, one or more of the plurality of relationship data to the field measures to generate a plurality of errors; and

determining the reservoir fluid contamination from at least one of the plurality of purity levels that is associated with the one or more of the plurality of relationship data that is within a threshold error value or an error range of the plurality of errors.

12 . The method of claim 11 , further comprising:

projecting the plurality of errors to a distribution; and

determining the threshold error value or the error range from a mean of the distribution.

13 . The method of claim 11 , further comprising:

training one or more neural networks using at least the plurality of relationship data and the plurality of errors; and

inferring the reservoir fluid contamination for a new reservoir based in part on new field measures used with the one or more neural networks.

14 . The method of claim 11 , further comprising:

sensing, using the one or more sensors, one or more of optical measures, sound speed measures, refractive index measures, density measures, and viscosity measures as part of the field measures from the reservoir fluid of the reservoir.

15 . The method of claim 11 , further comprising:

generating a modeled rock formation to comprise pore structure using one or more images of a physical rock formation and using a plurality of physical variables; and

simulating purity measures and volume or time measures for the modeled rock formation, the purity measures and the volume or time measures to be comprised in the plurality of relationship data.

16 . The method of claim 11 , wherein the varying modeled rock formations are generated from input data comprising one or more of a simulated formation pressure, a simulated formation porosity, a simulated formation permeability, a simulated formation flow rate, a simulated invasion parameter, a simulated anisotropy ratio, and simulated packers.

17 . The method of claim 11 , further comprising:

applying a smoothening algorithm to the field measures to generate a smoothened version of the field measures; and

fitting an individual set of the smoothened version of the field measures to an individual set of the plurality of relationship data to identify a linear match, wherein the linear match is used in part to generate the plurality of errors.

18 . The method of claim 11 , further comprising:

providing one or more physical rock formations from the varying modeled rock formations;

injecting a contaminant into an individual physical rock formation;

extracting an applied fluid through the individual physical rock formation; and

determining a purity level based in part on the extracted applied fluid, the purity level contributing to the plurality of purity levels and a volume of the extracted applied fluid contributing to the plurality of volumes.

19 . The method of claim 11 , further comprising:

obtaining a volume or a time of the reservoir fluid from a sample taken from the reservoir; and

determining the reservoir fluid contamination for the sample based in part on an extrapolation of the volume or the time to at least one of the plurality of relationship data after applying one of the plurality of errors.

20 . The method of claim 11 , further comprising:

extrapolating, using the reservoir fluid contamination, a further reservoir fluid contamination for future volumes or times of the reservoir fluid extracted from the reservoir.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 28, 2023
From: COSKUN, SEFER; HUNNUR, ANUP; YANG, JUNJIE; HALL, EMILIANO
To: BAKER HUGHES OILFIELD OPERATIONS LLC
Reel/Frame 062829/0517 →
Continuity (2)
Provisional Application 63318976 · Mar 11, 2022
Related Publication 20230288396A1 · Sep 14, 2023
References Cited (26)
US 6350986B1 · Mullins · 2002 [cited by examiner]
US 6661226B1 · Hou · 2003 [cited by examiner]
US 7299136B2 · DiFoggio · 2007 [cited by applicant]
US 7372264B2 · Akkurt · 2008 [cited by applicant]
US 8099241B2 · Niu · 2012 [cited by examiner]
US 9121263B2 · Zazovsky · 2015 [cited by applicant]
US 10280745B2 · Eyuboglu · 2019 [cited by applicant]
US 10309885B2 · Zuo · 2019 [cited by applicant]
US 10316656B2 · Zuo · 2019 [cited by applicant]
US 10781686B2 · Wang · 2020 [cited by applicant]
US 11021951B2 · Olapade · 2021 [cited by applicant]
US 20050216196A1 · Akkurt · 2005 [cited by examiner]
US 20060250130A1 · Akkurt · 2006 [cited by applicant]
US 20100169020A1 · Niu · 2010 [cited by applicant]
US 20170350236A1 · Shen · 2017 [cited by applicant]
US 20190106987A1 · Kristensen · 2019 [cited by examiner]
US 20200018739A1 · Khan · 2020 [cited by examiner]
US 20200257654A1 · Chen · 2020 [cited by applicant]
US 20210047924A1 · Kallenbasti · 2021 [cited by applicant]
US 20210054738A1 · Dai · 2021 [cited by applicant]
US 20220034224A1 · Hunnur · 2022 [cited by applicant]
WO 2022031533 · 2022 [cited by applicant]
Kallenbasti et al., “Data Driven Model for Contamination Estimation and Monitoring Method to Optimize Fluid Sampling,” SPE International Society of Petroleum Engineers, Nov. 9, 2020, SPE-203325-MS, 15 pages. [cited by applicant]
Kristensen et al., “Real-Time Formation Evaluation and Contamination Prediction Through Inversion of Downhole Fluid-Sampling Measurements,” May 2019 SPE Reservoir Evaluation & Engineering, 17 pages. [cited by applicant]
International Search Report and Written Opinion mailed Jun. 7, 2023 in corresponding PCT Application No. PCT/US2023/014901. [cited by applicant]
Katende et al., “Experimental quantification of the effect of oil based drilling fluid contamination on properties of wellbore cement,” Journal of Natural Gas Science and Engineering, Jul. 2020, vol. 79, 15 pages. [cited by applicant]