IP Library › Granted Patent US 11,846,750
Granted Patent B2
US 11,846,750 · App. 18/118,621 · Granted Dec 19, 2023

Real-time weather forecasting for transportation systems

Inventors: Shimon Elkabetz (Boston, MA); Jacob Ribnik (New York, NY); Itai Zlotnik (Cambridge, MA); Rei Goffer (Boston, MA); Nir Nossenson (Winchester, MA); Daniel Alexander Rothenberg (Salem, MA); Karl Ginter (Beltsville, MD)
Assignee: The Tomorrow Companies Inc.
G01W1/10G01W1/02G08G5/0065G08G5/0091G08G5/025G01W1/00G01W2001/003G01W2001/006G01W2201/00G01W2203/00G06N5/00G06N20/00H04W84/005Y02A90/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,846,750
App. No.
18/118,621
Granted
Dec 19, 2023
Kind
B2
Abstract

Improved mechanisms for collecting information from a diverse suite of sensors and systems, calculating the current precipitation, atmospheric water vapor, atmospheric liquid water content, or precipitable water and other atmospheric-based phenomena, for example presence and intensity of fog, based upon these sensor readings, predicting future precipitation and atmospheric-based phenomena, and estimating effects of the atmospheric-based phenomena on visibility, for example by calculating runway visible range (RVR) estimates and forecasts based on the atmospheric-based phenomena.

Claims (36)

1. A method of automatically forecasting a weather parameter with at least one computer processor, comprising:

generating first weather parameter forecast data during a first cadence instance;

using the generated first weather parameter forecast data to produce a weather parameter forecast;

receiving collected weather parameter data corresponding to the weather parameter forecast during a second cadence instance following the first cadence instance by a first cadence time interval;

comparing the received collected weather parameter data with the generated first weather parameter forecast data to determine one or more differences therebetween;

determining, based on the determined one or more differences, whether at least a first portion of the first weather parameter forecast data can be re-used to produce another weather parameter forecast; and

based on the determining, selectively re-using the at least first portion of the first weather parameter forecast data to produce another weather parameter forecast.

2. Method of claim 1 , wherein the comparing includes using an image processing technique.

3. Method of claim 2 , wherein the comparing includes evaluating differences in location, shape, or size of weather features.

4. Method of claim 1 , wherein the determining includes determining that the one or more differences would affect results of subsequent processing.

5. Method of claim 1 , wherein producing another weather parameter forecast includes generating second weather parameter data for one or more portions of the first forecast weather parameter data that are not selected for re-use.

6. Method of claim 5 , wherein generating second weather forecast parameter data includes replacing at least a second portion of the first weather parameter forecast data with collected weather parameter data.

7. Method of claim 6 , further including updating at least a portion of third weather parameter forecast data that corresponds to the second portion of the first weather parameter data with third weather parameter forecast data,

wherein the third weather parameter forecast data is associated with a weather parameter that is different from the second weather parameter and is generated based on the second weather parameter forecast data.

8. Method of claim 7 , wherein the second weather parameter includes precipitation and the third weather parameter includes fog or RVR.

9. Method of claim 1 , wherein producing another weather parameter forecast includes replacing all of the first weather parameter forecast data with second weather parameter forecast data.

10. Method of claim 1 , further including changing the length of the first cadence time interval based on the first forecast weather parameter data and/or the received collected weather parameter data.

11. Apparatus for automatically forecasting a weather parameter comprising:

at least one computer processor, and

memory connected to the at least one computer processor, the memory storing instructions that when executed by the at least one computer processor cause the at least one computer processor to perform operations comprising:

generating first weather parameter forecast data during a first cadence instance;

using the generated first weather parameter forecast data to produce a weather parameter forecast;

receiving collected weather parameter data corresponding to the weather parameter forecast during a second cadence instance following the first cadence instance by a first cadence time interval;

comparing the received collected weather parameter data with the generated first weather parameter forecast data to determine one or more differences therebetween;

determining, based on the determined one or more differences, whether at least a first portion of the first weather parameter forecast data can be re-used to produce another weather parameter forecast; and

based on the determining, selectively re-using the at least first portion of the first weather parameter forecast data to produce another weather parameter forecast.

12. Apparatus of claim 11 , wherein the comparing includes using an image processing technique.

13. Apparatus of claim 12 , wherein the comparing includes evaluating differences in location, shape, or size of weather features.

14. Apparatus of claim 11 , wherein the determining includes determining that the one or more differences would affect results of subsequent processing.

15. Apparatus of claim 11 , wherein producing another weather parameter forecast includes generating second weather parameter data for one or more portions of the first forecast weather parameter data that are not selected for re-use.

16. Apparatus of claim 15 , wherein generating second weather forecast parameter data includes replacing at least a second portion of the first weather parameter forecast data with collected weather parameter data.

17. Apparatus of claim 16 wherein the memory stores further instructions that when executed by the at least one computer processor cause the at least one computer processor to perform operations comprising updating at least a portion of third weather parameter forecast data that corresponds to the second portion of the first weather parameter data with third weather parameter forecast data,

wherein the third weather parameter forecast data is associated with a weather parameter that is different from the second weather parameter and is generated based on the second weather parameter forecast data.

18. Apparatus of claim 17 , wherein the second weather parameter includes precipitation and the third weather parameter includes fog or RVR.

19. Apparatus of claim 11 , wherein producing another weather parameter forecast includes replacing all of the first weather parameter forecast data with second weather parameter forecast data.

20. Apparatus of claim 11 , wherein the memory stores further instructions that when executed by the at least one computer processor cause the at least one computer processor to perform operations comprising changing the length of the first cadence time interval based on the first forecast weather parameter data and/or the received collected weather parameter data.

Assignments (1)
SECURITY INTEREST Recorded Dec 19, 2024
From: THE TOMORROW COMPANIES INC.
To: FIRST-CITIZENS BANK & TRUST COMPANY, AS AGENT
Reel/Frame 069644/0117 →
Continuity (5)
Continuation 17176886 · Feb 16, 2021
Continuation 16181137 · Nov 5, 2018
Provisional Application 62609096 · Dec 21, 2017
Provisional Application 62581531 · Nov 3, 2017
Related Publication 20230228907A1 · Jul 20, 2023