IP Library › Granted Patent US 12,621,816
Granted Patent B2
US 12,621,816 · App. 18/244,451 · Granted May 5, 2026

Common frequency resources for multicast and broadcast services

Inventors: Hua Zhou (Vienna, VA); Esmael Hejazi Dinan (McLean, VA); Yunjung Yi (Vienna, VA); Ali Cagatay Cirik (Chantilly, VA); Hyoungsuk Jeon (Centreville, VA); Hyukjin Chae (San Diego, CA); Jonghyun Park (Syosset, NY); Kai Xu (Great Falls, VA)
Assignee: Ofinno, LLC
H04W72/0453H04L1/1854H04W4/06H04W72/232
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,621,816
App. No.
18/244,451
Granted
May 5, 2026
Kind
B2
Abstract

A wireless device receives a radio network temporary identifier (RNTI) for multicast and broadcast services (MBS) of a cell, a first parameter indicating a first location of first common frequency resources (CFR) for the MBS within a first BWP and a second parameter indicating a second location of second CFR for the MBS within a second BWP. The wireless device receives, based on the RNTI, via an active BWP of the cell a group common downlink control information (DCI) scheduling a transport block of the MBS, wherein: the group common DCI is received via the first CFR for the MBS based on the first BWP being the active BWP or the group common DCI is received via the second CFR for the MBS based on the second BWP being the active BWP; and the transport block of the MBS.

Claims (64)

1 . A method comprising:

receiving, by a wireless device, one or more radio resource control (RRC) messages comprising:

a radio network temporary identifier (RNTI) for multicast and broadcast services (MBS) of a cell; and

configuration parameters of a first bandwidth part (BWP) and a second BWP of the cell, the configuration parameters comprising:

a first parameter indicating a first location of first common frequency resources (CFR) for the MBS within the first BWP; and

a second parameter indicating a second location of second CFR for the MBS within the second BWP; and

receiving, based on the RNTI, via an active BWP of the cell:

a group common downlink control information (DCI) scheduling a transport block of the MBS, wherein:

the group common DCI is received via the first CFR for the MBS based on the first BWP being the active BWP; or

the group common DCI is received via the second CFR for the MBS based on the second BWP being the active BWP; and

the transport block of the MBS.

2 . The method of claim 1 , wherein the configuration parameters indicate a first starting resource block (RB) of first RBs of the first CFR and a number of the first RBs.

3 . The method of claim 1 , wherein the configuration parameters indicate a second starting resource block (RB) of second RBs of the second CFR and a number of the second RBs.

4 . The method of claim 1 , further comprising receiving a second DCI in the active BWP, wherein:

the second DCI is a wireless device specific DCI addressed to a cell-RNTI (C-RNTI) that dedicatedly identifies the wireless device;

the second DCI indicates a unicast transmission of a second transport block; and

the second CFR is within the active BWP and outside of the first CFR for the MBS.

5 . The method of claim 1 , wherein the receiving the group common DCI is based on monitoring a downlink control channel for the group common DCI with cyclic redundancy check (CRC) bits, of the group common DCI, being scrambled by the RNTI for the MBS.

6 . The method of claim 1 , wherein the RNTI is a G-RNTI.

7 . The method of claim 1 , further comprising transmitting, by the wireless device, a first message indicating MBS.

8 . A method comprising:

transmitting, by a base station, one or more radio resource control (RRC) messages comprising:

a radio network temporary identifier (RNTI) for multicast and broadcast services (MBS) of a cell; and

configuration parameters of a first bandwidth part (BWP) and a second BWP of the cell, the configuration parameters comprising:

a first parameter indicating a first location of first common frequency resources (CFR) for the MBS within the first BWP; and

a second parameter indicating a second location of second CFR for the MBS within the second BWP; and

transmitting, based on the RNTI, via an active BWP of the cell:

a group common downlink control information (DCI) scheduling a transport block of the MBS, wherein:

the group common DCI is transmitted via the first CFR for the MBS based on the first BWP being the active BWP; or

the group common DCI is transmitted via the second CFR for the MBS based on the second BWP being the active BWP; and

the transport block of the MBS.

9 . The method of claim 8 , wherein the configuration parameters indicate a first starting resource block (RB) of first RBs of the first CFR and a number of the first RBs.

10 . The method of claim 8 , wherein the configuration parameters indicate a second starting resource block (RB) of second RBs of the second CFR and a number of the second RBs.

11 . The method of claim 8 , further comprising transmitting a second DCI in the active BWP, wherein:

the second DCI is a wireless device specific DCI addressed to a cell-RNTI (C-RNTI) that dedicatedly identifies the wireless device;

the second DCI indicates a unicast transmission of a second transport block; and

the second CFR is within the active BWP and outside of the first CFR for the MBS.

12 . The method of claim 8 , wherein;

the transmitting the group common DCI is via a downlink control channel for the group common DCI; and

cyclic redundancy check (CRC) bits, of the group common DCI, are scrambled by the RNTI for the MBS.

13 . The method of claim 8 , wherein the RNTI is a G-RNTI.

14 . The method of claim 8 , further comprising receiving, by the base station, a first message indicating MBS.

15 . A non-transitory computer-readable medium comprising instructions that, when executed by one or more processors of a base station, cause the base station to:

transmit one or more radio resource control (RRC) messages comprising:

a radio network temporary identifier (RNTI) for multicast and broadcast services (MBS) of a cell; and

configuration parameters of a first bandwidth part (BWP) and a second BWP of the cell, the configuration parameters comprising:

a first parameter indicating a first location of first common frequency resources (CFR) for the MBS within the first BWP; and

a second parameter indicating a second location of second CFR for the MBS within the second BWP; and

transmit, based on the RNTI, via an active BWP of the cell:

a group common downlink control information (DCI) scheduling a transport block of the MBS, wherein:

the group common DCI is transmitted via the first CFR for the MBS based on the first BWP being the active BWP; or

the group common DCI is transmitted via the second CFR for the MBS based on the second BWP being the active BWP; and

the transport block of the MBS.

16 . The non-transitory computer-readable medium of claim 15 , wherein the configuration parameters indicate a first starting resource block (RB) of first RBs of the first CFR and a number of the first RBs.

17 . The non-transitory computer-readable medium of claim 15 , wherein the configuration parameters indicate a second starting resource block (RB) of second RBs of the second CFR and a number of the second RBs.

18 . The non-transitory computer-readable medium of claim 15 , wherein the instructions further cause the base station to:

transmit a second DCI in the active BWP, wherein:

the second DCI is a wireless device specific DCI addressed to a cell-RNTI (C-RNTI) that dedicatedly identifies the wireless device;

the second DCI indicates a unicast transmission of a second transport block; and

the second CFR is within the active BWP and outside of the first CFR for the MBS.

19 . The non-transitory computer-readable medium of claim 15 , wherein;

transmitting the group common DCI is via a downlink control channel for the group common DCI; and

cyclic redundancy check (CRC) bits, of the group common DCI, are scrambled by the RNTI for the MBS.

20 . The non-transitory computer-readable medium of claim 15 , wherein the RNTI is a G-RNTI.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 16, 2023
From: ZHOU, HUA; DINAN, ESMAEL HEJAZI; YI, YUNJUNG; CIRIK, ALI CAGATAY; JEON, HYOUNGSUK; CHAE, HYUKJIN; PARK, JONGHYUN; XU, KAI
To: OFINNO, LLC
Reel/Frame 065228/0426 →
Continuity (4)
Continuation 18110167 · Feb 15, 2023
Continuation PCTUS2021055215 · Oct 15, 2021
Provisional Application 63092137 · Oct 15, 2020
Related Publication 20230422227A1 · Dec 28, 2023
References Cited (78)
US 10834642B2 · Baghel · 2020 [cited by examiner]
US 11070951B2 · Abdoli · 2021 [cited by examiner]
US 11570784B2 · Kim · 2023 [cited by examiner]
US 20110149879A1 · Noriega · 2011 [cited by examiner]
US 20190261425A1 · Park et al. · 2019 [cited by applicant]
US 20200196310A1 · Tang · 2020 [cited by examiner]
US 20200267511A1 · Abdoli et al. · 2020 [cited by applicant]
US 20210127359A1 · Takeda et al. · 2021 [cited by applicant]
US 20210168815A1 · Kim et al. · 2021 [cited by applicant]
US 20210314953A1 · Park et al. · 2021 [cited by applicant]
US 20220030577A1 · Zhou et al. · 2022 [cited by applicant]
US 20220039088A1 · Zhang et al. · 2022 [cited by applicant]
US 20220078728A1 · Yi et al. · 2022 [cited by applicant]
US 20220095083A1 · Yeo et al. · 2022 [cited by applicant]
US 20220124654A1 · Takeda et al. · 2022 [cited by applicant]
US 20220353710A1 · Yoshida et al. · 2022 [cited by applicant]
US 20230093727A1 · Lin · 2023 [cited by examiner]
US 20240251408A1 · Jung · 2024 [cited by examiner]
CN 109819520A · 2019 [cited by applicant]
JP 2023528213A · 2023 [cited by applicant]
R2-2007036; 3GPP TSG-RAN WG2 Meeting #111 electronic; E-Meeting, Aug. 17-28, 2020; Source: vivo; Title: Discussion on dynamic control of transmission area for MBS; Agenda Item: 8.1.2.3; Document for: Discussion and Deci… [cited by applicant]
R1-2007341; 3G PP TSG RAN WG 1 #102-e; e-Meeting, Aug. 17-28, 2020; Agenda item: 8.12; Source: Moderator (CMCC); Title: Summary#3 on NR Multicast and Broadcast Services; Document for: Discussion/decision. [cited by applicant]
Japanese Office Action, mailed Sep. 28, 2023, in JP Patent Application No. 2023-523035. [cited by applicant]
R1-2009000; 3GPP TSG RAN WG1 #103-e; e-Meeting, Oct. 26-Nov. 13, 2020; Source: Intel Corporation; Title: Group Scheduling for NR MBS; Agenda item: 8.12.1; Document for: Discussion and Decision. [cited by applicant]
Chinese Office Action, mailed Mar. 30, 2024, in CN Patent Application No. 2021800703880. [cited by applicant]
Notice of Allowance, mailed Dec. 18, 2023, in KR Patent Application No. 2023-7016394. [cited by applicant]
R1-1812925; 3GPP TSG-RAN WG1 Meeting #95; Spokane, USA, Nov. 12-16, 2018; Agenda Item: 7.2.9.2.1; Source: Apple Inc.; Title: Power Saving Techniques based on UE Adaptation; Document for: Discussion, Decision. [cited by applicant]
R3-205424; 3GPP TSG-RAN WG3 Meeting #109-e; Aug. 17-28, 2020, E-Meeting; Agenda item: 22.3.3; Source: LG Electronics Inc.; Title: Consideration on Dynamic Control of the Broadcast/Multicast Transmission Area; Document f… [cited by applicant]
3GPP TS 36.212 V16.1.0 (Mar. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Multiplexing and … [cited by applicant]
3GPP TS 36.321 V16.0.0 (Mar. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Con… [cited by applicant]
3GPP TS 36.331 V16.0.0 (Mar. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Co… [cited by applicant]
3GPP TS 38.211 V16.2.0 (Jun. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical channels and modulation; (Release 16). [cited by applicant]
3GPP TS 38.212 V16.2.0 (Jun. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Multiplexing and channel coding; (Release 16). [cited by applicant]
3GPP TS 38.213 V16.2.0 (Jun. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for control; (Release 16). [cited by applicant]
3GPP TS 38.214 V16.2.0 (Jun. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for data; (Release 16). [cited by applicant]
3GPP TS 38.321 V16.1.0 (Jul. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification; (Release 16). [cited by applicant]
3GPP TS 38.331 V16.1.0 (Jul. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification; (Release 16). [cited by applicant]
R1-2005249; 3GPP TSG RAN WG1 Meeting #102-e; E-meeting, Aug. 17-28, 2020; Agenda Item: 8.12.1; Source: Huawei, HiSilicon; Title: Resource configuration and group scheduling for RRC_CONNECTED UEs; Document for: Discussio… [cited by applicant]
R1-2005250; 3GPP TSG RAN WG1 Meeting #102-e; E-meeting, Aug. 17-28, 2020; Agenda Item: 8.12.2; Source: Huawei, HiSilicon; Title: Mechanisms to improve reliability for RRC_CONNECTED UEs; Document for: Discussion and Deci… [cited by applicant]
R1-2005406; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Source: vivo; Title: Discussion on mechanisms to support group scheduling for RRC_CONNECTED UEs; Agenda Item: 8.12.1; Document for: Discussion and Decisi… [cited by applicant]
R1-2005407; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Source: vivo; Title: Discussion on mechanisms to improve reliability for RRC_CONNECTED UEs; Agenda Item: 8.12.2; Document for: Discussion and Decision. [cited by applicant]
R1-2005436; 3GPP TSG RAN WG1 Meeting #102-e; e-Meeting, Aug. 17-28, 2020; Source: ZTE; Title: Mechanisms to Support Group Scheduling for RRC_CONNECTED UEs; Agenda item: 8.12.1; Document for: Discussion/Decision. [cited by applicant]
R1-2005437; 3GPP TSG RAN WG1 Meeting #102-e; e-Meeting, Aug. 17-28, 2020; Source: ZTE; Title: Mechanisms to Improve Reliability for RRC_CONNECTED UEs; Agenda item: 8.12.2; Document for: Discussion/Decision. [cited by applicant]
R1-2005531; 3GPP TSG RAN WG1 Meeting #102-e; e-Meeting, Aug. 17-Aug. 28, 2020; Agenda item: 8.12.1; Source: Nokia, Nokia Shanghai Bell; Title: Group Scheduling Mechanisms to Support 5G Multicast / Broadcast Services for… [cited by applicant]
R1-2005532; 3GPP TSG RAN WG1 Meeting #102-e; e-Meeting, Aug. 17-Aug. 28, 2020; Agenda item: 8.12.2; Source: Nokia, Nokia Shanghai Bell; Title: Mechanisms for 5G Multicast / Broadcast Reliability Improvements for RRC_CON… [cited by applicant]
R1-2005589; 3GPP TSG RAN WG1 Meeting #102-e; e-Meeting, Aug. 17-28, 2020; Agenda Item: 8.12.1; Source: Sony; Title: Considerations on MBMS group scheduling for RRC_CONNECTED UEs; Document for: Discussion and Decision. [cited by applicant]
R1-2005590; 3GPP TSG RAN WG1 Meeting #102-e; e-Meeting, Aug. 17-28, 2020; Agenda Item: 8.12.2; Source: Sony; Title: Considerations on MBMS reliability for RRC_CONNECTED UEs; Document for: Discussion and Decision. [cited by applicant]
R1-2005693; 3GPP TSG RAN WG1 Meeting #102-e; e-Meeting, Aug. 17-28, 2020; Source: CATT; Title: Discussion on group scheduling mechanism for RRC_CONNECTED UEs in MBS; Agenda Item: 8.12.1; Document for: Discussion and Dec… [cited by applicant]
R1-2005694; 3GPP TSG RAN WG1 #102e; e-Meeting, Aug. 17-28, 2020; Source: CATT; Title: Discussion on reliability improvement mechanism for RRC_CONNECTED UEs in MBS; Agenda Item: 8.12.2; Document for: Discussion and Decis… [cited by applicant]
R1-2005898; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 18-28, 2020; Source: Intel Corporation; Title: Group Scheduling for NR MBS; Agenda item: 8.12.1; Document for: Discussion and Decision. [cited by applicant]
R1-2005899; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 18-28, 2020; Source: Intel Corporation; Title: Mechanisms to Improve Reliability of NR MBS; Agenda item: 8.12.2; Document for: Discussion and Decision. [cited by applicant]
R1-2006013; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Source: OPPO; Title: Group scheduling for NR Multicast and Broadcast Services; Agenda Item: 8.12.1; Document for: Discussion and Decision. [cited by applicant]
R1-2006014; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Source: OPPO; Title: UL feedback for RRC-CONNECTED UEs in MBMS; Agenda Item: 8.12.2; Document for: Discussion and Decision. [cited by applicant]
R1-2006173; 3GPP TSG RAN WG1 #102-e Meeting; e-Meeting, Aug. 17-28, 2020; Agenda item: 8.12.1; Source: Samsung; Title: On Mechanisms to support group scheduling for RRC_CONNECTED UEs; Document for: Discussion and Decisi… [cited by applicant]
R1-2006174; 3GPP TSG RAN WG1 #102-e Meeting; e-Meeting, Aug. 17-28, 2020; Agenda item: 8.12.2; Source: Samsung; Title: On Mechanisms to improve reliability for RRC_CONNECTED UEs; Document for: Discussion and Decision. [cited by applicant]
R1-2006233; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Source: CMCC; Title: Discussion on group scheduling mechanisms in NR MBS; Agenda item: 8.12.1; Document for: Discussion & Decision. [cited by applicant]
R1-2006234; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Source: CMCC; Title: Discussion on reliability improvement in NR MBS; Agenda item: 8.12.2; Document for: Discussion & Decision. [cited by applicant]
R1-2006320; 3GPP TSG RAN WG1 Meeting #102-e; Online, Aug. 17-28, 2020; Agenda Item: 8.12.1; Source: LG Electronics Inc.; Title: Support of group scheduling for RRC_CONNECTED UEs; Document for: Discussion and decision. [cited by applicant]
R1-2006321; 3GPP TSG RAN WG1 Meeting #102-e; Online, Aug. 17-28, 2020; Agenda Item: 8.12.2; Source: LG Electronics Inc.; Title: Mechanisms to improve Reliability of Broadcast/Multicast service; Document for: Discussion … [cited by applicant]
R1-2006631; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Agenda item: 8.12.1 Mechanisms to support group scheduling for RRC_CONNECTED UEs; Title: On group scheduling mechanism for NR multicast and broadcast; So… [cited by applicant]
R1-2006632; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Agenda item: 8.12.2 Mechanisms to improve reliability for RRC_CONNECTED UEs; Title: On reliability enhancement for NR multicast and broadcast; Source: Co… [cited by applicant]
R1-2006830; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Agenda item: 8.12.1; Source: Qualcomm Incorporated; Title: View on group scheduling for Multicast RRC_CONNECTED UEs; Document for: Discussion and Decisio… [cited by applicant]
R1-2006831; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Agenda item: 8.12.2; Source: Qualcomm Incorporated; Title: View on UE feedback for Multicast RRC_CONNECTED UEs; Document for: Discussion and Decision. [cited by applicant]
R1-2006863; 3GPP TSG RAN WG1 #102-e; e-Meeting, Aug. 17-28, 2020; Agenda item: 8.12.2; Source: BBC; Title: HARQ-based time-interleaving for NR Multicast/Broadcast; Document for: Discussion. [cited by applicant]
R1-2006918; 3GPP TSG-RAN WG1 Meeting #102-e; eMeeting, Aug. 17-28, 2020; Agenda Item: 8.12.1; Source: Ericsson; Title: Mechanisms for group scheduling of RRC_CONNECTED UEs in NR; Document for: Discussion. [cited by applicant]
R1-2006919; 3GPP TSG-RAN WG1 Meeting #102-e; eMeeting, Aug. 17-28, 2020; Agenda Item: 8.12.2; Source: Ericsson; Title: Mechanisms to improve reliability for RRC_Connected UEs receiving PTM transmission; Document for: Di… [cited by applicant]
R2-2006597; 3GPP TSG RAN WG2#111-e; Electronic meeting, Aug. 17-Aug. 28, 2020; Source: CATT; Title: Consideration on Idle and Inactive mode UEs; Agenda Item: 8.1.3; Document for: Discussion and Decision. [cited by applicant]
R2-2006804; 3GPP TSG-RAN WG2 Meeting #111 electronic; Online, Aug. 17-28, 2020; Agenda Item: 8.1.1; Source: OPPO; Title: General considerations for MBS in RRC_CONNECTED; Document for: Discussion and decision. [cited by applicant]
R2-2007178; 3GPP TSG RAN WG2 Meeting# 111 electronic; Electronic Aug. 17-28, 2020; Agenda Item: 8.1.2; Source: Sony; Title: NR multicast in connected mode; Document for: Discussion. [cited by applicant]
R2-2007442; 3GPP TSG-RAN WG2 Meeting #111 electronic; Online, Aug. 17-28, 2020; Title: Scope and Architecture analysis of NR MBS; Source: ZTE, Sanechips; Agenda Item: 8.1.1; Document for: Discussion, Decision. [cited by applicant]
R2-2007466; 3GPP TSG-RAN WG2 Meeting #111e; Online, Aug. 17-28, 2020; Agenda item: 8.1.2.1; Source: Lenovo, Motorola Mobility; Title: Protocols and Dynamic Switching for 5G MBS PTP and PTM; Document for: Discussion and … [cited by applicant]
R2-2007672; 3GPP TSG RAN WG2 Meeting #111-e; e-Meeting, Aug. 17-Aug. 28, 2020; Agenda item: 8.1.1; Source: Samsung; Title: On Stage-2 aspects and overview of NR MBS; WID/SID: NR_MBS—Release 17; Document for: Discussion … [cited by applicant]
R2-2007993; 3GPP TSG-RAN WG2 Meeting #111 electronic; Online, Aug. 17-28, 2020; Agenda item: 8.1.1; Source: LG Electronics Inc.; Title: Consideration on BWP and beam in NR multicast; Document for: Discussion and Decisio… [cited by applicant]
3GPP TS 36.211 V16.1.0 (Mar. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels… [cited by applicant]
3GPP TS 36.213 V16.1.0 (Mar. 2020); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer pr… [cited by applicant]
R1-2007501; 3GPP TSG RAN WG1 Meeting #103-e; e-Meeting, Oct. 26-Nov. 13, 2020; Source: MCC Support; Title: Final Report of 3GPP TSG RAN WG1 #102-e v1.0.0 (Online meeting, Aug. 17-28, 2020); Document for: Approval. [cited by applicant]
3GPP TS 36.213 V14.7.0 (Jun. 2018); Release 14; pp. 50-237. [cited by applicant]
International Search Report and Written Opinion of the International Searching authority mailed Feb. 23, 2022, in International Application No. PCT/US2021/055215. [cited by applicant]