IP Library › Granted Patent US 12,068,900
Granted Patent B2
US 12,068,900 · App. 18/331,783 · Granted Aug 20, 2024

Method and apparatus for receiving downlink reference signal in wireless communication system

Inventors: Jingxing Fu (Beijing, CN); Bin Yu (Beijing, CN); Chen Qian (Beijing, CN); Qi Xiong (Beijing, CN); Yingjie Zhang (Beijing, CN)
Assignee: Samsung Electronics Co., Ltd.
H04L27/2613H04L5/0048H04L5/0051H04L5/0094H04L5/10H04L27/26025H04L27/2607H04W56/001H04W72/23H04W72/53H04W80/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,068,900
App. No.
18/331,783
Granted
Aug 20, 2024
Kind
B2
Abstract

The present disclosure relates to a pre-5 th -Generation (5G) or 5G communication system to be provided for supporting higher data rates Beyond 4 th -Generation (4G) communication system such as Long Term Evolution (LTE). A method for operating a terminal in a wireless communication system, the method comprises determining a time-frequency structure of a downlink reference signal, and receiving, from a base station, the downlink reference signal according to the time-frequency structure.

Claims (60)

1. A method performed by a terminal in a wireless communication system, the method comprising:

identifying a first time-frequency resource of a first demodulation reference signal (DMRS) for a master information block (MIB) based on information carried on synchronization signals;

identifying a subcarrier spacing of the first DMRS for the MIB based on the synchronization signals;

obtaining the first DMRS for the MIB based on the first time-frequency resource; and

obtaining a second DMRS for a physical downlink shared channel (PDSCH) based on configuration information for a second time-frequency resource of the second DMRS for the PDSCH,

wherein the configuration information for the second time-frequency resource of the second DMRS for the PDSCH is received via a higher layer signaling.

2. The method of claim 1 , wherein the first DMRS for the MIB is obtained based on the subcarrier spacing, and

wherein the subcarrier spacing of the first DMRS for the MIB is same as a subcarrier spacing of the synchronization signals.

3. The method of claim 1 , wherein a number of resource elements (REs) in time-domain and a number of REs in frequency-domain between REs of the second DMRS for the PDSCH are unchanged as a subcarrier spacing of the second DMRS for the PDSCH changes, and

wherein a length of cyclic prefix (CP) changes inversely as the subcarrier spacing of the second DMRS for the PDSCH changes.

4. The method of claim 1 , wherein the configuration information indicates the second time-frequency resource as a first type or a second type, and

wherein the second time-frequency resource is obtained based on the first type or the second type indicated by the configuration information.

5. The method of claim 1 , further comprising:

performing a first channel estimation based on the obtained first DMRS for the MIB;

obtaining the MIB based on a result of the first channel estimation;

performing a second channel estimation based on the obtained second DMRS for the PDSCH; and

obtaining the PDSCH based on a result of the second channel estimation.

6. A method performed by a base station in a wireless communication (Original) system, the method comprising:

transmitting a first demodulation reference signal (DMRS) for a master information block (MIB) based on a first time-frequency resource, wherein the first time-frequency resource is based on information carried on synchronization signals, and a subcarrier spacing of the first DMRS for the MIB is based on the synchronization signals; and

transmitting a second DMRS for a physical downlink shared channel (PDSCH) based on configuration information for a second time-frequency resource, wherein the configuration information for the second time-frequency resource of the second DMRS for the PDSCH is transmitted via a higher layer signaling.

7. The method of claim 6 , wherein the first DMRS for the MIB is transmitted based on the subcarrier spacing, and

wherein the subcarrier spacing of the first DMRS for the MIB is same as a subcarrier spacing of the synchronization signals.

8. The method of claim 6 , wherein a number of resource elements (REs) in time-domain and a number of REs in frequency-domain between REs of the second DMRS for the PDSCH are unchanged as a subcarrier spacing of the second DMRS for the PDSCH changes, and

wherein a length of cyclic prefix (CP) changes inversely as the subcarrier spacing of the second DMRS for the PDSCH changes.

9. The method of claim 6 , wherein the configuration information indicates the second time-frequency resource as a first type or a second type, and

wherein the second time-frequency resource is based on the first type or the second type indicated by the configuration information.

10. The method of claim 6 , wherein the first DMRS for the MIB is for a first channel estimation for the MIB, and

wherein the second DMRS for the PDSCH is for a second channel estimation for the PDSCH.

11. A terminal in a wireless communication system, the terminal comprising:

a transceiver; and

a controller coupled with the transceiver and configured to:

identify a first time-frequency resource of a first demodulation reference signal (DMRS) for a master information block (MIB) based on information carried on synchronization signals,

identify a subcarrier spacing of the first DMRS for the MIB based on the synchronization signals,

obtain the first DMRS for the MIB based on the first time-frequency resource, and

obtain a second DMRS for a physical downlink shared channel (PDSCH) based on configuration information for a second time-frequency resource of the second DMRS for the PDSCH,

wherein the configuration information for the second time-frequency resource of the second DMRS for the PDSCH is received via a higher layer signaling.

12. The terminal of claim 11 , wherein the first DMRS for the MIB is obtained based on the subcarrier spacing, and

wherein the subcarrier spacing of the first DMRS for the MIB is same as a subcarrier spacing of the synchronization signals.

13. The terminal of claim 11 , wherein a number of resource elements (REs) in time-domain and a number of REs in frequency-domain between REs of the second DMRS for the PDSCH are unchanged as a subcarrier spacing of the second DMRS for the PDSCH changes, and

wherein a length of cyclic prefix (CP) changes inversely as the subcarrier spacing of the second DMRS for the PDSCH changes.

14. The terminal of claim 11 , wherein the configuration information indicates the second time-frequency resource as a first type or a second type, and

wherein the second time-frequency resource is obtained based on the first or the second type indicated by the configuration information.

15. The terminal of claim 11 , wherein the controller is further configured to:

perform a first channel estimation based on the obtained first DMRS for the MIB,

obtain the MIB based on a result of the first channel estimation,

perform a second channel estimation based on the obtained second DMRS for the PDSCH, and

obtain the PDSCH based on a result of the second channel estimation.

16. A base station in a wireless communication system, the base station comprising:

a transceiver; and

a controller coupled with the transceiver and configured to:

transmit a first demodulation reference signal (DMRS) for a master information block (MIB) based on a first time-frequency resource, wherein the first time-frequency resource is based on information carried on synchronization signals, and a subcarrier spacing of the first DMRS for the MIB is based on the synchronization signals, and

transmit a second DMRS for a physical downlink shared channel (PDSCH) based on configuration information for a second time-frequency resource, wherein the configuration information for the second time-frequency resource of the second DMRS for the PDSCH is transmitted via a higher layer signaling.

17. The base station of claim 16 , wherein the first DMRS for the MIB is transmitted based on the subcarrier spacing, and

wherein the subcarrier spacing of the first DMRS for the MIB is same as a subcarrier spacing of the synchronization signals.

18. The base station of claim 16 , wherein a number of resource elements (REs) in time-domain and a number of REs in frequency-domain between REs of the second DMRS for the PDSCH are unchanged as a subcarrier spacing of the second DMRS for the PDSCH changes, and

wherein a length of cyclic prefix (CP) changes inversely as the subcarrier spacing of the second DMRS for the PDSCH changes.

19. The base station of claim 16 , wherein the configuration information indicates the second time-frequency resource as a first type or a second type, and

wherein the second time-frequency resource is based on the first type or the second type indicated by the configuration information.

20. The base station of claim 16 , wherein the first DMRS for the MIB is for a first channel estimation for the MIB, and

wherein the second DMRS for the PDSCH is for a second channel estimation for the PDSCH.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 8, 2023
From: FU, JINGXING; YU, BIN; QIAN, CHEN; XIONG, QI; ZHANG, YINGJIE
To: SAMSUNG ELECTRONICS CO., LTD
Reel/Frame 063940/0736 →
Priority Claims (2)
CN 201610857538.3 · Sep 27, 2016 · national
CN 201610867885.4 · Sep 29, 2016 · national
Continuity (3)
Continuation 17931226 · Sep 12, 2022
Continuation 16337337
Related Publication 20230318896A1 · Oct 5, 2023