IP Library › Granted Patent US 12,098,619
Granted Patent B2
US 12,098,619 · App. 18/349,675 · Granted Sep 24, 2024

Autonomous chemical treatment system and method for drilling and completion rigs

Inventors: Fernando Antonio Moreira Da Silva (Rio de Janeiro, BR); Mario Germino Ferreira Da Silva (Rio de Janeiro, BR); Valtair Marcos Cristante (Rio de Janeiro, BR)
Assignee: PETRÓLEO BRASILEIRO S.A.—PETROBRAS
E21B41/00C09K8/52C09K8/605C09K8/665C09K8/68E21B33/068C09K2208/32C09K2208/34
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,098,619
App. No.
18/349,675
Granted
Sep 24, 2024
Kind
B2
Abstract

The present invention relates to an autonomous chemical treatment system and method for drilling and completion probes, so that it allows the probe to carry out chemical treatments in subsea wells, dispensing the need to use the WSSV, which has a limited treatment capacity due to tank volumetry, generally smaller that the marine probes.

Claims (29)

1. An autonomous chemical treatment system for drilling and completion rigs, the system comprising:

a fluid supply tank containing a completion fluid comprising:

industrial water;

sea water;

3.5% potassium chloride;

Sodium chloride;

0.045% v/v sodium bisulfite 40%;

0.053% v/v glutaraldehyde 40%;

0.20% v/v emulsion preventer;

caustic soda solution to pH 8-9; and

10% v/v scale inhibitor;

a rig pump fluidly connected to an outlet of the fluid supply tank;

a standpipe manifold fluidly connected to a discharge of the rig pump, wherein the rig pump is configured to pump a fluid from the fluid supply tank to the standpipe manifold;

an injection head fluidly connected to the standpipe manifold;

a rotary table, wherein the injection head is positioned on the rotary table; and

a well in fluid communication with the injection head.

2. The system of claim 1 , wherein the fluid supply tank further contains a chemical.

3. The system of claim 1 , wherein the standpipe manifold is aligned with the injection head, and wherein the injection head for injection into the well via a drill pipe riser DPR.

4. An autonomous chemical treatment system for drilling and completion rigs, comprising:

a fluid supply tank ;

a rig pump fluidly connected to the fluid supply tank;

a standpipe manifold fluidly connected to the rig pump, wherein the rig pump pumps a fluid from the fluid supply tank to the standpipe manifold;

an injection head fluidly connected to the standpipe manifold;

a chemical injection line positioned between the standpipe manifold and the injection head, the chemical injection line comprising:

a check valve;

a chemical injection pump positioned upstream of the check valve; and

a chemical tank positioned upstream of the chemical injection pump, wherein the chemical injection pump injects a chemical solution from the chemical tank through the chemical injection line;

a rotary table connected to the injection head; and

a well in fluid communication with the injection head.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 25, 2024
From: MOREIRA DA SILVA, FERNANDO ANTONIO; FERREIRA DA SILVA, MARIO GERMINO; CRISTANTE, VALTAIR MARCOS
To: PETRÓLEO BRASILEIRO S.A. - PETROBRAS
Reel/Frame 066886/0542 →
Priority Claims (1)
BR 10 2022 014170 3 · Jul 18, 2022 · national
Continuity (1)
Related Publication 20240018848A1 · Jan 18, 2024
Cited By (1)
US 12,509,966