MODULAR MANUFACTURE, DELIVERY, AND ASSEMBLY OF NUCLEAR REACTOR BUILDING SYSTEMS
A nuclear reactor is constructed in sub-modules and super modules which are manufactured, packaged, and shipped to a construction site. At least some of the modules are packaged in suitable shielding containers or portions of containers, which may be steel. The modules are assembled on-site, and some of the modules remain within their respective shipping containers after assembly. One or more of the shipping containers may be used as concrete forms to support the pouring of concrete in between selected modules. The concrete may be used for structural support, shielding, or both.
1 . A method of constructing a nuclear reactor, comprising:
receiving a first nuclear reactor component in a first steel container;
receiving a second nuclear reactor component in a second steel container;
placing the second steel container in proximity to the first steel container; and
pouring concrete between the second steel container and the first steel container, the second steel container and the first steel container used as forms to contain poured concrete.
2 . The method as in claim 1 , wherein the first nuclear reactor component remains within the first steel container during operation of the nuclear reactor.
3 . The method of claim 1 , further comprising attaching one or more form ties between the first steel container and the second steel container.
4 . The method of claim 1 , further comprising excavating earth to create a subgrade region.
5 . The method of claim 4 , further comprising placing the first steel container in the subgrade region.
6 . The method of claim 5 , further comprising the step of connecting the first steel container to the second steel container and wherein placing the first steel container in the subgrade region is performed after the step of connecting the first steel container to the second steel container.
7 . The method of claim 6 , wherein the step of connecting the first steel container to the second steel container comprises welding form ties between the first steel container and the second steel container.
8 . The method of claim 6 , wherein the step of connecting the first steel container to the second steel container comprises coupling the containers with one or more fluid conduits.
9 . A construction method, comprising:
fabricating, at a manufacturing facility, a first sub-module, the first sub-module positioned within a first container;
fabricating, at the manufacturing facility, a second sub-module, the second sub-module positioned within a second container;
shipping the first sub-module and the second sub-module to a construction site;
placing the first sub-module and the second sub-module in place, the first container and the second container remaining in place;
coupling the first container and the second container together; and
placing concrete between the first container and the second container.
10 . The construction method as in claim 9 , wherein the first container is a steel container.
11 . The construction method as in claim 9 , wherein the first container has a pre-formed opening to provide a pathway through the first container.
12 . The construction method as in claim 9 , further comprising connecting form ties in between the first container and the second container.
13 . The construction method as in claim 9 , wherein coupling the first container and the second container together comprises fluidically coupling the first container and the second container together.