Granted Patent
B2
US 12,720,344 · App. 18/371,571 · Granted Aug 25, 2026
Measurement method and apparatus
View Patent ↗
Loading inventors, assignments & file history…
Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST
Recorded Nov 3, 2025
From: FUJITSU LIMITED
To: 1FINITY INC.
Reel/Frame 073477/0445 →
ASSIGNMENT OF ASSIGNOR'S INTEREST
Recorded Sep 22, 2023
From: JIANG, QINYAN; WANG, XIN; JIA, MEIYI
To: FUJITSU LIMITED
Reel/Frame 064993/0638 →
Continuity (2)
Continuation
PCTCN2021085152
· Apr 1, 2021
References Cited (37)
US 20150139183A1
· Pradas et al.
· 2015
[cited by applicant]
BR 112021013776A2
· 2021
[cited by examiner]
CN 109474939A
· 2019
[cited by applicant]
CN 111278023A
· 2020
[cited by applicant]
CN 111835482A
· 2020
[cited by examiner]
CN 111918392A
· 2020
[cited by applicant]
EP 3681192A1
· 2020
[cited by applicant]
EP 4037391B1
· 2023
[cited by examiner]
ES 2967403T3
· 2024
[cited by examiner]
WO 2020063808A1
· 2020
[cited by applicant]
WO WO2021087779A1
· 2021
[cited by examiner]
International Search Report and Written Opinions of the International Searching Authority issued by the China National Intellectual Property Administration for corresponding Chinese Patent Application No. PCT/CN2021/085…
[cited by applicant]
3GPP TS 38.213 V16.5.0, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for control (Release 16)” Mar. 2021.
[cited by applicant]
3GPP TS 38.214 V16.5.0, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for data (Release 16)” Mar. 2021.
[cited by applicant]
Notice of Reasons for Refusal issued by the Japan Patent Office for corresponding Japanese Patent Application No. 2023-559134, mailed on Sep. 17, 2024, with an English translation.
[cited by applicant]
3GPP TS 38.331 V16.4.1, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 16)” Mar. 2021.
[cited by applicant]
The Extended European search report with the Supplementary European search report and the European search opinion, issued by the European Patent Office for corresponding European Patent Application No. 21934051.0, maile…
[cited by applicant]
Fujitsu, “Enhancements to initial access procedure for NR-U”, Agenda Item: 7.2.2.2.2, 3GPP TSG-RAN WG1 #98bis, R1-1910132, Chongqing, China, Oct. 14-20, 2019.
[cited by applicant]
Nokia et al., “Remaining aspects of Measurements requirements in NR-U”, Agenda Item: 7.1.5.10, 3GPP TSG-RAN WG4 Meeting #96-e, R4-2010592, E-meeting, Aug. 17-28, 2020.
[cited by applicant]
The First Examination Report issued by the Indian Patent Office for corresponding Indian Patent Application No. 202337060882, mailed on Nov. 29, 2024, with an English translation.
[cited by applicant]
Ericsson, “RRM in NR-U”, Agenda Item: 6.2.3.2, 3GPP TSG-RAN WG2 #108, R2-1914648, Revision of R2-1912646, Reno, USA, Nov. 18-22, 2019.
[cited by applicant]
Notice of Preliminary Rejection issued by the Korean Intellectual Property Office for corresponding Korean Patent Application No. 10-2023-7033548 mailed on Oct. 27, 2025, with an English translation.
[cited by applicant]