IP Library Granted Patent US 12,563,589
Granted Patent B2
US 12,563,589 · App. 18/413,165 · Granted Feb 24, 2026

Methods and apparatuses for scheduling request resource prioritization for beam failure recovery

Inventors: Hsin-Hsi Tsai (Taipei, TW); Heng-Li Chin (Taipei, TW); Chie-Ming Chou (Taipei, TW)
H04W72/569H04W28/0278H04W72/046H04W72/1268
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,563,589
App. No.
18/413,165
Granted
Feb 24, 2026
Kind
B2
Abstract

A method for Scheduling Request (SR) resource prioritization for Beam Failure Recovery (BFR) includes a User Equipment (UE) receiving a first SR configuration from a Base Station (BS), receiving a second SR configuration from the BS, triggering a first SR procedure for a BFR procedure based on the first SR configuration, triggering a second SR procedure for a Buffer Status Report (BSR) procedure based on the second SR configuration, in a case that the first SR procedure and the second SR procedure are triggered and not cancelled and the first SR resource overlaps the second SR resource in the time domain, prioritizing the first SR resource over the second SR resource, and transmitting an SR on the first SR resource after prioritizing the first SR resource over the second SR resource.

Claims (38)

1 . A method performed by a User Equipment (UE) for beam failure recovery (BFR) in a Secondary Cell (SCell), the method comprising:

receiving, from a Base Station (BS), a first Scheduling Request (SR) configuration indicating a first SR index associated with a first SR resource specifically used for a Beam Failure Recovery (BFR) procedure, the first SR resource being associated with a Special Cell (SpCell);

in response to a first beam failure event occurring in the SCell, triggering a first SR procedure for a first BFR procedure based on the first SR configuration, the first BFR procedure comprising:

transmitting a SR for requesting an uplink resource for transmitting a BFR report on the first SR resource associated with the SpCell, the BFR report comprising the information about a Cell index of the SCell where the first beam failure event occurs and the information about a candidate beam, and

starting a prohibit timer corresponding to the SR resource; and

in response to a second beam failure event occurring in the SpCell for the SR transmission triggered by the first beam failure event occurring in the SCell, performing a random access procedure on the SpCell.

2 . The method of claim 1 , wherein the first SR resource is a Physical Uplink Control Channel (PUCCH) resource.

3 . The method of claim 1 , wherein a first SR configuration is configured in the UE for the SCell.

4 . The method of claim 1 , wherein the first BFR procedure is triggered by the UE when the first beam failure event is detected by the UE on the SCell of the BS.

5 . The method of claim 1 ,

wherein, during the BFR procedure, the SR is transmitted on the first SR resource in response to determining that no prohibit timer corresponding to the first SR resource is running.

6 . The method of claim 5 , wherein the prohibit timer is started after the SR is transmitted on the first SR resource.

7 . The method of claim 5 , further comprising stopping the prohibit timer when the first SR procedure is cancelled.

8 . The method of claim 5 , further comprising stopping the prohibit timer when a Medium Access Control (MAC) Protocol Data Unit (PDU) that includes a BFR MAC Control Element (CE) is transmitted to the BS.

9 . The method of claim 1 ,

wherein the SR is transmitted on the first SR resource in response to determining that the first SR resource does not overlap a measurement gap in the time domain.

10 . The method of claim 1 , wherein the first SR resource has a highest priority for SR transmission among all SR resources configured to the UE.

11 . A User Equipment (UE) comprising:

a transceiver;

one or more non-transitory computer-readable media having computer-executable instructions embodied thereon; and

at least one processor coupled to the transceiver and the one or more non-transitory computer-readable media, the at least one processor for executing the computer-executable instructions that cause the UE to:

receive, from a Base Station (BS) via the transceiver, a first Scheduling Request (SR) configuration indicating a first SR index associated with a first SR resource specifically used for a Beam Failure Recovery (BFR) procedure, the first SR resource being associated with a Special Cell (SpCell);

in response to a first beam failure event occurring in a Secondary Cell (SCell), trigger a first SR procedure for a first BFR procedure based on the first SR configuration, the first BFR procedure comprising:

starting a prohibit timer corresponding to the SR resource; and

in response to a second beam failure event occurring in the SpCell for the SR transmission triggered by the first beam failure event occurring in the SCell, perform a random access procedure on the SpCell.

12 . The UE of claim 11 , wherein the first SR resource is Physical Uplink Control Channel (PUCCH) resource.

13 . The UE of claim 11 , wherein the first SR configuration is configured in the UE for the SCell.

14 . The UE of claim 11 , wherein the first BFR procedure is triggered by the UE when the first beam failure event is detected by the UE on the SCell of the BS.

15 . The UE of claim 11 , wherein when performing the BFR procedure, the at least one processor is further configured to:

determine, prior to transmitting the SR, whether any prohibit timer corresponding to the first SR is running,

wherein the SR is transmitted on the first SR resource in response to determining that no prohibit timer corresponding to the first SR resource is running.

16 . The UE of claim 15 , wherein the prohibit timer is started after the SR is transmitted on the first SR resource.

17 . The UE of claim 15 , wherein the computer-executable instructions cause the UE to:

stop the prohibit timer when the first SR procedure is cancelled.

18 . The UE of claim 15 , wherein the computer-executable instructions cause the UE to:

stop the prohibit timer when a Medium Access Control (MAC) Protocol Data Unit (PDU) that includes a BFR MAC Control Element (CE) is transmitted to the BS.

19 . The UE of claim 11 , wherein the SR is transmitted on the first SR resource in response to determining that the first SR resource does not overlap a measurement gap in the time domain.

20 . The UE of claim 11 , wherein the first SR resource has a highest priority for SR transmission among all SR resources configured to the UE.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 8, 2024
From: TSAI, HSIN-HSI; CHIN, HENG-LI; CHOU, CHIE-MING
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 066415/0332 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 8, 2024
From: FG INNOVATION COMPANY, LTD.
To: HANNIBAL IP LLC
Reel/Frame 066415/0421 →
Continuity (4)
Continuation 17557540 · Dec 21, 2021
Continuation 16937414 · Jul 23, 2020
Provisional Application 62878973 · Jul 26, 2019
Related Publication 20240237053A1 · Jul 11, 2024
References Cited (55)
US 11240829B2 · Tsai et al. · 2022 [cited by applicant]
US 11910432B2 · Tsai et al. · 2024 [cited by applicant]
US 20170064732A1 · Wu · 2017 [cited by applicant]
US 20180007637A1 · Yang et al. · 2018 [cited by applicant]
US 20180054348A1 · Luo · 2018 [cited by applicant]
US 20180278467A1 · Wilson et al. · 2018 [cited by applicant]
US 20180279353A1 · Shaheen et al. · 2018 [cited by applicant]
US 20180324723A1 · Akkarakaran · 2018 [cited by applicant]
US 20180359766A1 · Shih et al. · 2018 [cited by applicant]
US 20180368126A1 · Islam · 2018 [cited by applicant]
US 20190253941A1 · Cirik · 2019 [cited by applicant]
US 20190289661A1 · Chen et al. · 2019 [cited by applicant]
US 20190306875A1 · Zhou · 2019 [cited by applicant]
US 20190349061A1 · Cirik · 2019 [cited by applicant]
US 20190394082A1 · Cirik et al. · 2019 [cited by applicant]
US 20200029383A1 · Venugopal · 2020 [cited by examiner]
US 20200137821A1 · Cirik et al. · 2020 [cited by applicant]
US 20200344788A1 · Li · 2020 [cited by applicant]
US 20210013949A1 · Agiwal · 2021 [cited by examiner]
US 20210028849A1 · Chin et al. · 2021 [cited by applicant]
US 20210029724A1 · Tsai et al. · 2021 [cited by applicant]
US 20220201705A1 · Tsai · 2022 [cited by applicant]
CN 108702763 · 2018 [cited by applicant]
CN 114097286 · 2022 [cited by applicant]
CN 116528362 · 2023 [cited by applicant]
EP 4005316 · 2022 [cited by applicant]
EP 4005316B1 · 2024 [cited by applicant]
IN 202247004978 · 2022 [cited by applicant]
WO 2018232259 · 2018 [cited by applicant]
WO 2019029538 · 2019 [cited by applicant]
WO 2019032882 · 2019 [cited by applicant]
WO 2019135654A1 · 2019 [cited by applicant]
WO 2021018010 · 2021 [cited by applicant]
Issue Notification issued on Jan. 31, 2024 for corresponding U.S. Pat. No. 11,910,432. [cited by applicant]
Notice of Allowance issued on Oct. 13, 2023, for corresponding U.S. Appl. No. 17/557,540. [cited by applicant]
Final Office Action issued on Jul. 18, 2023 for corresponding U.S. Appl. No. 17/557,540. [cited by applicant]
Non-Final Office Action issued on Mar. 1, 2023 for corresponding U.S. Appl. No. 17/557,540. [cited by applicant]
3GPP TS 38.300 V16.0.0, 2019, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description; Stage 2 (Release 16). [cited by applicant]
3GPP TS 38.321 V16.0.0, 2020, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification, (Release 16). [cited by applicant]
3GPP TS 38.331 V16.0.0, 2020, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 16). [cited by applicant]
Extended European Search Report issued on Jul. 21, 2023 for corresponding European Patent Application No. 20846703.5. [cited by applicant]
Final Examination Report issued on Sep. 4, 2023 for corresponding Indian Patent Application No. 202247004978. [cited by applicant]
Intel Corporation Summary on L1-SINR and Scell Bfr 3GPP TSG RAN WG1 Meeting #97 R1-1907674 May 17, 2019 (May 17, 2019) the whole document. [cited by applicant]
International Preliminary Report on Patentability issued on Feb. 1, 2022 for International Patent Application No. PCT/CN2020/103895. [cited by applicant]
International Search Report issued on Oct. 27, 2020 for International Patent Application No. PCT/CN2020/10389. [cited by applicant]
Issue Notification issued on Jan. 12, 2022 for corresponding U.S. Appl. No. 16/937,414. [cited by applicant]
Non-Final Office Action issued on Sep. 15, 2022 for corresponding, Chinese Patent Application No. 202080047557.4 (partial translation). [cited by applicant]
Notice of Allowance for corresponding U.S. Appl. No. 16/937,414, issued on Sep. 20, 2021. [cited by applicant]
Notice of Allowance issued on Feb. 16, 2023 for corresponding, Chinese Patent Application No. 202080047557.4 (machine translation). [cited by applicant]
Vivo Discussion on Enhancements on Multi-Beam Operation 3GPP TSG RAN WG1 Meeting #95 R1-1812324 Nov. 16, 2018 (Nov. 16, 2018 ) the whole document. [cited by applicant]
Written Opinion of the International Searching Authority issued on on Oct. 27, 2020 for International Patent Application No. PCT/CN2020/103895. [cited by applicant]
Intention to Grant, Communication under Rule 71(3) EPC issued by the European Patent Office on May 22, 2024, for corresponding European Patent Application No. 20846703.5. [cited by applicant]
Decision to Grant issued on Sep. 26, 2024 for corresponding European Patent Application No. 20846703.5. [cited by applicant]
Extended European Search Report issued on Oct. 22, 2024 for corresponding European Divisional Patent Application No. 24202962.7. [cited by applicant]
Nokia et al., “Enhancements on multi-beam operation”, 3GPP TSG RAN WG1 Meeting #AH-1901, Taipei, Taiwan Jan. 21-25, 2019, 7.2.8.3, Nokia, Nokia Shanghai Bell, Discussion and Decision. [cited by applicant]