IP Library › Granted Patent US 12,120,184
Granted Patent B2
US 12,120,184 · App. 18/414,427 · Granted Oct 15, 2024

Methods, internet of things systems and mediums for controlling data transmission for smart gas

Inventors: Zehua Shao (Chengdu, CN); Junyan Zhou (Chengdu, CN); Xiaojun Wei (Chengdu, CN); Lei He (Chengdu, CN); Quan Wang (Chengdu, CN)
Assignee: CHENGDU QINCHUAN IOT TECHNOLOGY CO., LTD.
H04L67/12G06Q50/06G16Y10/35G16Y20/30G16Y40/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,120,184
App. No.
18/414,427
Granted
Oct 15, 2024
Kind
B2
Abstract

The present disclosure provides a method comprising obtaining gas data of a gas user continuously, and storing the gas data into a storage unit; predicting a probability of full storage of the storage unit within a preset future time period based on a historical data increment of the storage unit; in response to the probability of full storage meeting a preset probability condition: obtaining the gas data of the gas user within the preset time period from the storage unit; determining an upload demand degree of the gas data based on the gas data; and in response to the upload demand degree meeting a preset condition, transmitting the gas data within the preset time period to a smart gas management platform based on a smart gas object platform at a target upload time point of a smart gas meter of the gas user.

Claims (33)

1. A method for controlling data transmission for smart gas, wherein the method is performed by an Internet of Things (IOT) system for controlling data transmission for smart gas, the method comprising:

obtaining gas data of a gas user continuously, and storing the gas data into a storage unit;

predicting a probability of full storage of the storage unit within a preset future time period based on a historical data increment of the storage unit;

in response to the probability of full storage meeting a preset probability condition:

obtaining the gas data of the gas user within the preset time period from the storage unit;

determining an upload demand degree of the gas data based on the gas data; and

in response to the upload demand degree meeting a preset condition, transmitting the gas data within the preset time period to a smart gas management platform based on a smart gas object platform at a target upload time point of a smart gas meter of the gas user, wherein the target upload time point is a next most recent upload time point in a set of upload time points of the smart gas meter,

obtaining, by the smart gas management platform, uploaded data of at least one smart gas meter at a preset cycle periodically, and determining the set of upload time points of the at least one smart gas meter based on the uploaded data and sending the set of upload time points of the at least one smart gas meter to the smart gas meter, including:

generating a plurality of candidate combinations, one of the plurality of candidate combinations including a set of candidate upload time points of the at least one smart gas meter;

for one of the plurality of candidate combinations, determining an adaptability value of the candidate combination based on the candidate combination and the uploaded data, the adaptability value being determined based on a predicted congestion degree and a predicted demand matching degree; and

determining the set of upload time points of the at least one smart gas meter based on the adaptability value, wherein

the preset cycle is related to a difference between an actual congestion degree and a predicted congestion degree, and a difference between an actual demand matching degree and a predicted demand matching degree in a most recent cycle.

2. The method of claim 1 , wherein the determining an upload demand degree of the gas data based on the gas data includes:

determining a feature of data to be uploaded and a feature of gas usage behavior of the gas user based on the gas data within the preset time period; and

determining the upload demand degree based on the feature of data to be uploaded and the feature of gas usage behavior.

3. The method of claim 2 , wherein the upload demand degree is negatively correlated to a historical gas usage frequency of the gas user.

4. The method of claim 1 , wherein the smart gas management platform includes a smart gas data center, and the preset cycle is determined by a process including:

determining the preset cycle based on a current data processing feature of the smart gas data center.

5. A non-transitory computer-readable storage medium, comprising a set of instructions, wherein when a computer reads the computer instructions in the storage medium, the method for controlling data transmission for smart gas of claim 1 is implemented.

6. An Internet of Things (IOT) system for controlling data transmission control for smart gas, wherein the system comprises a smart gas user platform, a smart gas service platform, a smart gas management platform, a smart gas sensing network platform, and a smart gas object platform interacting in sequence, and the loT system for controlling data transmission control for smart gas is configured to:

obtain gas data of a gas user continuously, and storing the gas data into a storage unit;

predict a probability of full storage of the storage unit within a preset future time period based on a historical data increment of the storage unit;

in response to the probability of full storage meeting a preset probability condition:

obtain the gas data of the gas user within the preset time period from the storage unit;

determine an upload demand degree of the gas data based on the gas data; and

in response to the upload demand degree meeting a preset condition, transmit the gas data within the preset time period to the smart gas management platform based on the smart gas object platform at a target upload time point of a smart gas meter of the gas user, wherein the target upload time point is a next most recent upload time point in a set of upload time points of the smart gas meter,

obtain, by the smart gas management platform, uploaded data of at least one smart gas meter at a preset cycle periodically, and determine the set of upload time points of the at least one smart gas meter based on the uploaded data and send the set of upload time points of the at least one smart gas meter to the smart gas meter, including:

generating a plurality of candidate combinations, one of the plurality of candidate combinations including a set of candidate upload time points of the at least one smart gas meter;

for one of the plurality of candidate combinations, determining an adaptability value of the candidate combination based on the candidate combination and the uploaded data, the adaptability value being determined based on a predicted congestion degree and a predicted demand matching degree; and

determining the set of upload time points of the at least one smart gas meter based on the adaptability value, wherein

the preset cycle is related to a difference between an actual congestion degree and a predicted congestion degree, and a difference between an actual demand matching degree and a predicted demand matching degree in a most recent cycle.

7. The loT system of claim 6 , wherein the smart gas management platform includes a gas business management sub-platform, a non-gas business management sub-platform and a smart gas data center;

the gas business management sub-platform interacts bi-directionally with the smart gas data center, the non-gas business management sub-platform interacts bi-directionally with the smart gas data center, and the gas business management sub-platform and the non-gas business management sub-platform obtains data and feeds back corresponding operation information from the smart gas data center.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 8, 2024
From: SHAO, ZEHUA; ZHOU, JUNYAN; WEI, XIAOJUN; HE, LEI; WANG, QUAN
To: CHENGDU QINCHUAN IOT TECHNOLOGY CO., LTD.
Reel/Frame 067920/0103 →
Priority Claims (1)
CN 202311818510.5 · Dec 27, 2023 · national
Continuity (1)
Related Publication 20240155031A1 · May 9, 2024