IP Library Granted Patent US 12,482,998
Granted Patent B1
US 12,482,998 · App. 18/418,821 · Granted Nov 25, 2025

Quick connection system for energy storage and photovoltaic equipment

Inventors: Kevin Bassalleck (Albuquerque, NM); Dustin Neel (Albuquerque, NM)
Assignee: Gridworks, Inc.
H01R43/26H01R13/5221H01R31/06H02J3/381H02J7/35H02J2300/24Y10T29/49169
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,482,998
App. No.
18/418,821
Granted
Nov 25, 2025
Kind
B1
Abstract

Systems and methods of electrically connecting electrical energy storage or photovoltaic equipment with electrical destination equipment without performing any hard-wiring or installing any terminations in the field. A utility-scale electrical energy storage system and/or photovoltaic inverter is provided with a receptacle at its electrical output with a frame shaped and sized to secure to a first plug on a first cable to form an electrical connection between the first source equipment, first cable and the destination equipment.

Claims (12)

1 . A method of electrically connecting electrical energy storage or photovoltaic equipment with electrical destination equipment at an electric power generation or storage facility (“power facility”), the method comprising the step of:

providing a plate capable of retrofitting to a side or surface of a first source equipment, the plate comprising a first receptacle capable of connecting to the electrical output of a first source equipment, the first source equipment comprising a plurality of electrical energy storage systems or photovoltaic inverters, each of the electrical energy storage systems and photovoltaic inverters with a capacity or output typically employed for use with utility-scale power sources, the first receptacle shaped and sized to secure to a first plug on a first cable to form an electrical connection between the first source equipment and the first cable;

providing a first cable comprising the first plug on a first end of the first cable, the first plug shaped and sized to secure to the first receptacle to form an electrical connection between the first source equipment and the first cable, the first cable capable of electrical connection with destination equipment at a power facility, the destination equipment comprising at least one of the electrical equipment chosen from the group consisting of: transformer, inverter, switch, switch gear, panel board, circuit breaker and meter.

2 . The method of claim 1 , further comprising subsequently delivering or otherwise providing the source equipment to the power facility comprising the destination equipment.

3 . The method of claim 1 , further comprising the step of securing the first plug to the first receptacle on the first source equipment to form an electrical connection between the destination equipment and the first cable.

4 . The method of claim 1 , wherein the first plug comprises a locking mechanism to lock and seal the connection.

5 . The method of claim 1 further comprising the step of electrically connecting the first cable to the first source equipment without performing any hard-wiring or installing any terminations on the first cable, first source equipment or destination equipment.

6 . The method of claim 1 further comprising the step of electrically connecting the first cable to the first source equipment without adding any lugs to the first cable, first source equipment or destination equipment.

7 . The method of claim 1 further comprising the step of electrically connecting the first cable to the first source equipment without using a hand tool.

8 . The method of claim 1 , wherein the first receptacle comprises an asymmetrical shape.

9 . The method of claim 1 , wherein the first receptacle comprises a tab or slot.

10 . The method of claim 1 , further comprising the step of securing the first plug to the first receptacle and removing the first plug secured to the first receptacle on the first source equipment by using a hand tool to unsecure the first plug.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 8, 2024
From: BASSALLECK, KEVIN; NEEL, DUSTIN
To: GRIDWORKS, INC.
Reel/Frame 066421/0843 →
Continuity (2)
Continuation 17993746 · Nov 23, 2022
Provisional Application 63282817 · Nov 24, 2021
References Cited (12)
US 10020754B2 · Chapman et al. · 2018 [cited by applicant]
US 10333340B2 · Kang et al. · 2019 [cited by applicant]
US 10765015B2 · Linderman · 2020 [cited by applicant]
US 10938218B2 · Jeanty et al. · 2021 [cited by applicant]
US 11018619B2 · Torrano Carrillo et al. · 2021 [cited by applicant]
US 20210070185A1 · Liu et al. · 2021 [cited by applicant]
CN 108092316B · 2020 [cited by applicant]
CN 214673871U · 2021 [cited by applicant]
DE 102012014695 · 2014 [cited by examiner]
ES 1257111U · 2020 [cited by applicant]
WO 2021047389A1 · 2021 [cited by applicant]
“You picked your panels—how do you finalize and install your residential solar system?”, https://www.dcbel.energy/2021/08/05/you-picked-your-panels-how-do-you-finalize-and-install-yourresidential-solar-system/, 1-7. [cited by applicant]