IP Library Granted Patent US 12,371,191
Granted Patent B2
US 12,371,191 · App. 18/441,722 · Granted Jul 29, 2025

Method of producing structure

Inventors: Yoichi Sato (Tokyo, JP); Yutaka Yamagishi (Tokyo, JP); Kazuma Ashizawa (Tokyo, JP)
Assignee: SUBARU CORPORATION
B64F5/10G06F30/15G06F30/23
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,371,191
App. No.
18/441,722
Granted
Jul 29, 2025
Kind
B2
Abstract

A method of producing a structure by coupling a first component to a second component and inserting a shim into a gap formed between the first component and the second component includes: measuring first and second profiles of first and second surfaces of the first and second components before completing positioning of the first and second components to coupling positions; measuring third and fourth profiles of third and fourth surfaces of the first and second components before completing the positioning; performing the positioning by butting the first surface against the second surface; measuring fifth and sixth profiles of the third and fourth surfaces after completing the positioning; calculating a size of the gap based on the first to sixth profiles; producing the shim based on the size of the gap; and coupling the second component to the first component with the shim inserted and the positioning completed.

Claims (24)

1. A method of producing a structure by coupling a first component to a second component and inserting a shim into a gap formed between the first component and the second component, the structure consisting of an aircraft, an aircraft component, a spacecraft or a spacecraft component,

the method comprising:

measuring a first profile of a first surface of the first component before completing positioning of the first component and the second component to coupling positions of the first component and the second component, the first surface being to be mated with the second component;

measuring a second profile of a second surface of the second component before completing the positioning, the second surface being to be mated with the first component;

measuring a third profile of a third surface of the first component before completing the positioning, the third surface being measurable after completing the positioning;

measuring a fourth profile of a fourth surface of the second component before completing the positioning, the fourth surface being measurable after completing the positioning;

performing the positioning by butting the first and second components such that the first surface physically abuts against the second surface;

measuring a fifth profile of the third surface after completing the positioning;

measuring a sixth profile of the fourth surface after completing the positioning;

calculating a size of the gap based on the measured first to sixth profiles;

producing the shim based on the calculated size of the gap; and

coupling the second component to the first component in a state where the shim has been inserted into the gap and the positioning has been completed,

wherein a seventh profile of the first surface after completing the positioning and an eighth profile of the second surface after completing the positioning are calculated based on the measured first to sixth profiles, and

the size of the gap is calculated based on the calculated seventh and eighth profiles, and

wherein amounts of deformation of the first component and the second component after completing the positioning are calculated based on the measured third to sixth profiles, and

the seventh profile of the first surface after completing the positioning and the eighth profile of the second surface after completing the positioning are calculated based on the calculated amounts of the deformation, and the first and second profiles measured before completing the positioning.

2. The method of producing the structure according to claim 1 ,

wherein the shim is produced based on the calculated size of the gap without measuring any distance between the first surface after completing the positioning and the second surface after completing the positioning with a clearance gauge.

3. The method of producing the structure according to claim 1 ,

wherein the first component includes a first panel, or a first part having a first web, and

the second component includes a reinforcement, a fitting, a second panel, or a second part having a second web.

4. The method of producing the structure according to claim 2 ,

wherein the first component includes a first panel, or a first part having a first web, and

the second component includes a reinforcement, a fitting, a second panel, or a second part having a second web.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 3, 2025
From: SATO, YOICHI; YAMAGISHI, YUTAKA; ASHIZAWA, KAZUMA
To: SUBARU CORPORATION
Reel/Frame 070380/0797 →
Priority Claims (1)
JP 2023-024003 · Feb 20, 2023 · national
Continuity (1)
Related Publication 20240278936A1 · Aug 22, 2024
References Cited (24)
US 5385050A · Roberts · 1995 [cited by examiner]
US 6748346B2 · Ujiie · 2004 [cited by applicant]
US 8756792B2 · Boyl-Davis et al. · 2014 [cited by applicant]
US 10139808B2 · Engelbart et al. · 2018 [cited by applicant]
US 10450053B2 · Doyle et al. · 2019 [cited by applicant]
US 10562246B2 · Douilly · 2020 [cited by examiner]
US 11524791B2 · Tullock et al. · 2022 [cited by applicant]
US 20120316666A1 · Boyl-Davis · 2012 [cited by examiner]
US 20140303764A1 · Boyl-Davis · 2014 [cited by examiner]
US 20170132355A1 · Vasquez · 2017 [cited by examiner]
US 20170138385A1 · Clark · 2017 [cited by examiner]
US 20180067476A1 · Engelbart · 2018 [cited by examiner]
US 20190205501A1 · Vasquez · 2019 [cited by examiner]
US 20190236472A1 · Kobayashi · 2019 [cited by examiner]
US 20210229836A1 · Sharples · 2021 [cited by examiner]
US 20210245861A1 · Whitmer · 2021 [cited by examiner]
US 20210310783A1 · Georgeson · 2021 [cited by examiner]
US 20220245294A1 · Rabiega · 2022 [cited by examiner]
EP 2533167A2 · 2012 [cited by applicant]
EP 3689751A1 · 2020 [cited by applicant]
JP 2000029922A · 2000 [cited by applicant]
JP 2018041439A · 2018 [cited by applicant]
JP 2018051751A · 2018 [cited by applicant]
Extended European Search Report mailed Jul. 17, 2024 for European Patent Application No. 24152297.8 (12 pages). [cited by applicant]