IP Library Granted Patent US 12,304,146
Granted Patent B2
US 12,304,146 · App. 18/453,794 · Granted May 20, 2025

Apparatus for the manufacture of three-dimensional objects

Inventors: Frederik Tjellesen (London, GB); Anders Hartmann (London, GB); Alexander Rasmussen (London, GB)
Assignee: Stratasys Powder Production Ltd.
B29C64/307B22F10/73B22F12/50B29C64/153B29C64/214B29C64/245B29C64/255B29C64/295B29C64/314B29C64/321B29C64/357B33Y40/00B22F10/28B22F12/13B22F12/20B22F12/57B22F12/63B22F12/90B29C64/209B29C64/227B33Y30/00B33Y40/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,304,146
App. No.
18/453,794
Granted
May 20, 2025
Kind
B2
Abstract

A method for recirculating powder in an apparatus for manufacturing a three-dimensional object from the powder. The powder recirculation method includes: providing powder in a powder repository, the powder being one of fresh powder, excess powder or a blend thereof; transferring the powder from the repository to a work surface; distributing the powder across a build surface and resulting in a portion of the powder defining excess powder; returning the excess powder back to the repository; monitoring the amount of powder in the repository relative to a predetermined amount of powder; and delivering fresh powder from a powder tank to the repository when the amount of powder in the repository is less than the predetermined amount and not delivering fresh powder when excess powder is being returned to repository and the amount of powder in the repository is greater than the predetermined amount of powder.

Claims (24)

1. A method for recirculating powder in an apparatus for manufacturing a three-dimensional object from powder, the apparatus including a work surface having a build area, the method comprising, during layer deposition and pattern formation for the object:

(a) providing powder in a powder repository, wherein said powder in the powder repository is one of fresh powder, excess powder or a blend of fresh powder and excess powder;

(b) transferring the powder from the powder repository to the work surface;

(c) distributing the powder across the build area and resulting in a portion of the powder defining excess powder;

(d) returning the excess powder from the work surface back to the powder repository;

(e) monitoring the amount of powder in the powder repository relative to a predetermined amount of powder; and

(f) delivering fresh powder from a powder tank to the powder repository when the amount of powder in the powder repository is less than the predetermined amount of powder, and not delivering fresh powder from the powder tank to the powder repository when excess powder is being returned to the powder repository and the amount of powder in the powder repository is greater than the predetermined amount of powder.

2. The method according to claim 1 , further comprising the step of continuously repeating steps (a) through (f).

3. The method according to claim 1 , further comprising the step of heating the excess powder during the step of returning the excess powder.

4. The method according to claim 1 , further comprising the step of heating the fresh powder during the step of delivering fresh powder from the powder tank.

5. The method according to claim 1 , further comprising the step of agitating the excess powder during the step of returning the excess powder.

6. The method according to claim 1 , further comprising the step of agitating the fresh powder during the step of delivering the fresh powder to the powder repository.

7. The method according to claim 1 , further comprising the step of agitating powder provided in the powder repository.

8. The method according to claim 1 , further comprising the step of agitating fresh powder in the powder tank.

9. The method according to claim 1 , further comprising the step of recirculating powder from the powder repository by removing powder via an outlet of the powder repository so as to keep a level of powder in the powder repository constant, said removed powder defining a recirculated powder, combining said removed powder with excess powder and/or fresh powder to form combined powder, and feeding the combined powder back to the powder repository, such that said powder in the powder repository further comprises recirculated powder.

10. The method according to claim 9 , wherein the returning step and the recirculating step combine the recirculated powder and the excess powder before feeding the combined powder back to the powder repository.

11. The method according to claim 1 , wherein the return step returns the excess powder along a delivery path to the powder repository and the step of delivering fresh powder delivers the fresh powder along the delivery path to the powder repository.

12. The method according to claim 11 , wherein the fresh powder is delivered to the delivery path at a location downstream of the excess powder being delivered to the delivery path.

13. The method according to claim 12 , further comprising the step of recirculating powder from an outlet of the powder repository to the delivery path, said powder defining a recirculated powder, the recirculated powder being delivered to the delivery path at a location downstream of the excess powder being delivered to the delivery path.

14. The method according to claim 13 , wherein the recirculated powder is delivered to the delivery path at a location upstream of the fresh powder being delivered to the delivery path.

15. The method according to claim 13 , wherein the recirculated powder is delivered to the delivery path at a location concurrently with the fresh powder being delivered to the delivery path.

16. The method according to claim 1 , further comprising the step of prioritizing the step of returning the excess powder to the powder repository over the step of delivering fresh powder to the powder repository.

17. The method according to claim 1 , further comprising the step of recirculating powder from the powder repository by removing powder via an outlet of the powder repository to the powder repository so as to keep a level of powder in the powder repository constant, said removed powder defining a recirculated powder, and further comprising the step of prioritizing the step of returning the excess powder to the powder repository over the step of feeding the recirculated powder back to the powder repository.

18. The method according to claim 1 , further comprising the step of recirculating powder from the powder repository by removing powder via an outlet of the powder repository to the powder repository so as to keep a level of powder in the powder repository constant, said removed powder defining a recirculated powder, and further comprising the step of prioritizing the step of feeding the recirculated powder back to the powder repository over the step of delivering fresh powder to the powder repository.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 21, 2026
From: TJELLESEN, FREDERIK; HARTMANN, ANDERS; RASMUSSEN, ALEXANDER
To: XAAR 3D LIMITED
Reel/Frame 074725/0257 →
CHANGE OF NAME Recorded May 21, 2026
From: XAAR 3D LIMITED
To: STRATASYS POWDER PRODUCTION LTD.
Reel/Frame 074725/0435 →
Priority Claims (1)
GB 1719096 · Nov 17, 2017 · national
Continuity (2)
Continuation 16764924
Related Publication 20230405932A1 · Dec 21, 2023
References Cited (33)
US 7887316B2 · Cox · 2011 [cited by applicant]
US 9254535B2 · Buller et al. · 2016 [cited by applicant]
US 20010045678A1 · Kubo et al. · 2001 [cited by applicant]
US 20020090410A1 · Tochimoto et al. · 2002 [cited by applicant]
US 20080241404A1 · Allaman · 2008 [cited by examiner]
US 20140202381A1 · Ederer et al. · 2014 [cited by applicant]
US 20150034123A1 · Pressacco · 2015 [cited by examiner]
US 20150336330A1 · Herzog · 2015 [cited by applicant]
US 20160193696A1 · McFarland et al. · 2016 [cited by applicant]
US 20160361874A1 · Park et al. · 2016 [cited by applicant]
US 20170028631A1 · Hyatt et al. · 2017 [cited by applicant]
US 20170072636A1 · Ng et al. · 2017 [cited by applicant]
US 20170348771A1 · Kawada et al. · 2017 [cited by applicant]
US 20180021855A1 · de Lajudie et al. · 2018 [cited by applicant]
US 20180264728A1 · Grases et al. · 2018 [cited by applicant]
US 20190001413A1 · Fockele et al. · 2019 [cited by applicant]
US 20190061254A1 · West et al. · 2019 [cited by applicant]
CN 106392069A · 2017 [cited by applicant]
CN 107848200A · 2018 [cited by applicant]
DE 102015222689A1 · 2017 [cited by applicant]
EP 3127636A1 · 2017 [cited by applicant]
FR 2166526 · 1973 [cited by applicant]
JP 2002205338A · 2002 [cited by applicant]
JP 2017001381A · 2017 [cited by applicant]
JP 2017030353A · 2017 [cited by applicant]
JP 2018506651A · 2018 [cited by applicant]
WO 2016131785A1 · 2016 [cited by applicant]
WO 2017005301A1 · 2017 [cited by applicant]
WO 2017088897A1 · 2017 [cited by applicant]
WO 2017184166A1 · 2017 [cited by applicant]
WO 2017194118A1 · 2017 [cited by applicant]
Search Report issued May 16, 2018, in the corresponding United Kingdom Application No. 1719096.8 (2 pgs.). [cited by applicant]
International Search Report and Written Opinion issued Feb. 15, 2019, in International Application No. PCT/GB2018/053336 (15 pgs.). [cited by applicant]