IP Library Granted Patent US 12,410,691
Granted Patent B2
US 12,410,691 · App. 18/515,465 · Granted Sep 9, 2025

Apparatus and method for milling openings in an uncemented blank pipe

Inventors: Ahmed A. Al Sulaiman (Dammam, SA); Feras Hamid Rowaihy (Dhahran, SA); Mamdouh N. Al-Nasser (Dhahran, SA); Suresh Jacob (Dhahran, SA)
Assignee: Saudi Arabian Oil Company
E21B43/12E21B23/01E21B29/06E21B33/12E21B43/14E21B49/0875
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,410,691
App. No.
18/515,465
Granted
Sep 9, 2025
Kind
B2
Abstract

This disclosure relates to an inflow control system having an apparatus configured to form or plug openings in a blank pipe. The apparatus includes a housing and a milling sub-system. The housing has a cylindrical wall with an outer surface. The milling sub-system is mounted to a first side of the wall and is configured to mill an opening in the blank pipe. The milling sub-system includes a bit configured to form an opening in the blank pipe and at least one brace attached to a second side of the wall opposite the first side of the wall. The at least one brace is configured to extend radially from the second side of the wall to press the bit to the inner surface of the blank pipe.

Claims (16)

1. A method to reduce an inflow of water into an uncemented blank pipe, the method comprising:

analyzing, prior to the inflow of water from a formation into the blank pipe, wellbore data to estimate water cut of areas of the formation,

identifying areas of the formation with an estimated water cut of at least 50%,

detecting at least one portion of the blank pipe arranged in the identified areas of the formation with the estimated water cut of at least 50%,

actuating an alignment sub-system of an apparatus to align with the at least one portion of the blank pipe, and

actuating a plug sub-system of an apparatus to cover an opening in the at least one section of the blank pipe.

2. The method according to claim 1 , wherein actuating the plug sub-system of the apparatus to cover the opening in the at least one section of the blank pipe comprises actuating the plug sub-system of the apparatus to cover an inflow control device in the blank pipe.

3. The method according to claim 1 , wherein the opening is 20 mm to 300 mm in diameter.

4. The method according to claim 1 , further comprising:

identifying, based on the analyzed wellbore data, areas of the formation with an estimated water cut between 0% and 20%, and

detecting a second portion of the blank pipe arranged in the identified areas of the formation with an estimated water cut between 0% and 20%.

5. The method according to claim 1 , further comprising:

receiving, during the inflow of water from the formation into the blank pipe, production data from a sensor arrangement of the apparatus, wherein the production data comprises measurements indicative of a measured water cut of the areas of the formation;

identifying an area of the formation that has a measured water cut of at least 50%; and

actuating the alignment sub-system to align the apparatus with portions of the blank pipe arranged in the identified area of the formation that have the measured water cut of at least 50%.

6. The method according to claim 5 , further comprising actuating the plug sub-system to close an opening and/or inflow control device in the portion of the blank pipe arranged in the area of the formation that has a measured water cut of at least 50%.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 15, 2023
From: AL SULAIMAN, AHMED A.; ROWAIHY, FERAS HAMID; AL-NASSER, MAMDOUH N.; JACOB, SURESH
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 065883/0627 →
Continuity (2)
Division 17208525 · Mar 22, 2021
Related Publication 20240084679A1 · Mar 14, 2024
References Cited (54)
US 2696112A · Clayton · 1954 [cited by examiner]
US 6516275B2 · Lazaratos · 2003 [cited by applicant]
US 6549879B1 · Cullick et al. · 2003 [cited by applicant]
US 6931324B2 · Taner et al. · 2005 [cited by applicant]
US 7088639B2 · Wells et al. · 2006 [cited by applicant]
US 7108067B2 · Themig et al. · 2006 [cited by applicant]
US 7376517B2 · Rickett · 2008 [cited by applicant]
US 7555389B2 · Cavalca et al. · 2009 [cited by applicant]
US 8631877B2 · Gewily · 2014 [cited by applicant]
US 9031820B2 · Frederick · 2015 [cited by applicant]
US 9217328B2 · Yang · 2015 [cited by examiner]
US 9506325B2 · Fould et al. · 2016 [cited by applicant]
US 10563483B2 · Steele · 2020 [cited by applicant]
US 10590741B2 · Van Der Veen · 2020 [cited by applicant]
US 20010050172A1 · Tolman et al. · 2001 [cited by applicant]
US 20050000692A1 · Cook et al. · 2005 [cited by applicant]
US 20090326826A1 · Hull et al. · 2009 [cited by applicant]
US 20100097886A1 · Day et al. · 2010 [cited by applicant]
US 20120273236A1 · Gandikota et al. · 2012 [cited by applicant]
US 20120318579A1 · Yang et al. · 2012 [cited by applicant]
US 20140076560A1 · Kenyon et al. · 2014 [cited by applicant]
US 20140170025A1 · Weiner et al. · 2014 [cited by applicant]
US 20140360784A1 · Hunziker et al. · 2014 [cited by applicant]
US 20150168573A1 · Zhang et al. · 2015 [cited by applicant]
US 20150267475A1 · Marlow · 2015 [cited by applicant]
US 20160091623A1 · Yu et al. · 2016 [cited by applicant]
US 20160178772A1 · Carter · 2016 [cited by applicant]
US 20170321547A1 · Enkababian et al. · 2017 [cited by applicant]
US 20190120048A1 · Coffin et al. · 2019 [cited by applicant]
US 20200332615A1 · Wiesenborn et al. · 2020 [cited by applicant]
CA 2802988 · 2015 [cited by applicant]
CA 2899222 · 2017 [cited by applicant]
WO WO2013044300 · 2013 [cited by applicant]
WO WO2014168617 · 2014 [cited by applicant]
WO WO2018045255 · 2018 [cited by applicant]
WO WO2018104778 · 2018 [cited by applicant]
WO WO2018111103 · 2018 [cited by applicant]
WO WO2019099038 · 2019 [cited by applicant]
“IsoRite Isolated Multilateral Completion Systems: For Multilateral Wells that Require Re-Entry Capability to Access the Lateral,” Halliburton, Completion Solutions, Multilateral Systems, 2018, 3 pages. [cited by applicant]
“SLIC: Selective Lateral Intervention Completion System,” Schlumberger, 2019, 2 pages. [cited by applicant]
Abdel-Basset et al., “Chemical and Mechanical Water Shut-Off in Horizontal Passive ICD Wells; Experience and Lessons Learnt in Giant Darcy Reservoir,” IPTC-20210-MS, International Petroleum Technology Conference (IPTC),… [cited by applicant]
Abubaker et al., “Technology Trial Review: Selective Coiled Tubing Re-Entry of Two Open Hole Multilateral Wells Using Intelligent Electromechanical Arm,” SPE-182996-MS, Society of Petroleum Engineers (SPE), presented at… [cited by applicant]
Al-Khaldy et al., “First-Ever Level 4 Multilateral Well in North Kuwait Successfully Completed, Improves Oil Production,” SPE-171792-MS, Society of Petroleum Engineers (SPE), presented at the Abu Dhabi International Pet… [cited by applicant]
Arukhe et al., “Technology Evolution in a Giant Saudi Aramco's Field Development,” WPC-21-0182, Work Petroleum Congress (WPC), presented at the 21st World Petroleum Congress, Moscow, Russia, Jun. 2014, 17 pages. [cited by applicant]
Ertekin et al., “Artificial Intelligence Applications in Reservoir Engineering: A Status Check,” Energies, Jul. 2019, XP055776157, 12(15): 2897, 22 pages. [cited by applicant]
Halliburton [online], “Digital Twin Implementation for Integrated Production & Reservoir Management,” iEnergy, 2018, retrieved on Sep. 27, 2019, retrieved from URL: <https://www.ienergy.community/Portals/1/IenergyDocs/M… [cited by applicant]
Mohaghegh, “Reservoir simulation and modeling based on artificial intelligence and data mining (AI&DM),” Journal of Natural Gas Science and Engineering, Aug. 2011, 3(6): 697-705, XP028125623, 9 pages. [cited by applicant]
Saeed et al., “Multilateral Reentry System for Well Surveillance: Design, Implementation and Summary of 40 Jobs Performed in Fields,” SPE-199849-MS, Society of Petroleum Engineers (SPE), presented at the SPE/ICoTA Well … [cited by applicant]
Saumya et al., “Saturation Forecast Using Machine Learning: Enabling Smarter Decision-Making Capabilities,” SPE-197419-MS, Society of Petroleum Engineers, Nov. 2019, XP055796992, 10 pages. [cited by applicant]
Slb.com [online], “Discovery MLT, Multilateral reentry system,” available on or before Feb. 24, 2021, retrieved from URL <https://www.slb.com/well-intervention/coiled-tubing-intervention/mechanical-intervention/discover… [cited by applicant]
Sudakov et al., “Artificial Neural Network Surrogate Modeling of Oil Reservoir: A Case Study,” Springer International Publishing, Cham, Advances in Neural Networks—ISNN 2019, Lecture Notes in Computer Science, Jun. 2019… [cited by applicant]
Vaferi et al., “Hydrocarbon reservoir model detection from pressure transient data using coupled artificial neural network—Wavelet transform approach,” Applied Soft Computing, Elsevier, Amsterdam, NL, Jun. 2016, XP02966… [cited by applicant]
Xindi et al., “Comprehensive Review of Water Shutoff Methods for Horizontal Wells,” Petroleum Exploration and Development, Dec. 2017, 44:6 (1022-1029), 8 pages. [cited by applicant]
SAIP Examination Report in Saudi Arabian Appln. No. 122430780, dated Jun. 20, 2023, 15 pages (with English Translation). [cited by applicant]
Cited By (1)
US 12,612,835