IP Library Granted Patent US 12,607,089
Granted Patent B2
US 12,607,089 · App. 18/593,356 · Granted Apr 21, 2026

Annular barrier

Inventor: Ricardo Reves Vasques (Zug, CH)
Assignee: Welltec Manufacturing Center Completions ApS
E21B33/1277E21B36/008
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,607,089
App. No.
18/593,356
Granted
Apr 21, 2026
Kind
B2
Abstract

An annular barrier has a tubular metal part and an expandable metal sleeve having ends connected with the tubular metal part. An annular space is between the expandable metal sleeve and the tubular metal part, an expansion opening is provided in the tubular metal part through which fluid may enter for expansion. The annular barrier further includes a eutectic material and/or a bentonite material which in a first condition is arranged on the outer face of the tubular metal part in a first axial position different from the second axial extension of the expandable metal sleeve, and in a second condition and a second axial position the eutectic material and/or a bentonite material abuts a face of the expandable metal sleeve, and in an intermediate condition the eutectic material and/or a bentonite material is positioned between the first axial position and the second axial position.

Claims (21)

1 . An annular barrier for expansion in an annulus between a first well tubular metal structure and an inner face of a borehole or a second well tubular metal structure for providing zone isolation between a first zone and a second zone of the annulus, the annular barrier having a first axial extension, where the annular barrier comprises:

a tubular metal part for mounting as part of the first well tubular metal structure, the tubular metal part having an outer face,

an expandable metal sleeve surrounding the tubular metal part and having an outer face facing towards the inner face of the borehole or the second well tubular metal structure and an inner face facing the outer face of the tubular metal part, a second axial extension along the first axial extension, and each end of the expandable metal sleeve being connected with the tubular metal part,

an annular space between the expandable metal sleeve and the tubular metal part,

an expansion opening in the tubular metal part through which fluid may enter the annular space in order to expand the expandable metal sleeve,

a eutectic material and/or a bentonite material which in a first condition is arranged on the outer face of the tubular metal part in a first axial position different from the second axial extension of the expandable metal sleeve, and in a second condition and a second axial position the eutectic material and/or the bentonite material abuts a face of the expandable metal sleeve, and in an intermediate condition the eutectic material and/or the bentonite material is positioned between the first axial position and the second axial position, and

a fluid communication channel extending from a position facing the outer face of the tubular metal part and having a first opening in a first axial channel position, and the fluid communication channel extending towards a second opening in a second axial channel position, where the second axial channel position overlaps or abuts an axial position of the expandable metal sleeve, and in the first condition the eutectic material is arranged upstream to the first opening, and in the second condition the eutectic material abuts the face of the expandable metal sleeve downstream to the second opening.

2 . An annular barrier according to claim 1 , wherein one of the ends of the expandable metal sleeve is connected with the tubular metal part by means of a connection part, and the fluid communication channel extends through the connection part, providing fluid communication to the annular space.

3 . An annular barrier according to claim 2 , wherein the first opening and the second opening are arranged in the connection part.

4 . An annular barrier according to claim 1 , wherein in the second condition the eutectic material and/or the bentonite material overlaps the second axial extension.

5 . An annular barrier according to claim 1 , wherein the fluid communication channel is arranged to partly abut part of the outer face of the expandable metal sleeve.

6 . An annular barrier according to claim 1 , further comprising a chamber arranged on the outer face of the tubular metal part; in the first condition, the eutectic material and/or the bentonite material is in powder form arranged in the chamber.

7 . An annular barrier according to claim 1 , wherein the eutectic material is a solid block of eutectic material.

8 . An annular barrier according to claim 7 , further comprising a chamber having a chamber opening in fluid communication with the first opening of the fluid communication channel.

9 . An annular barrier according to claim 1 , wherein in the second condition the eutectic material and/or the bentonite material is arranged at least partly on the outer face of the expandable metal sleeve.

10 . An annular barrier according to claim 1 , wherein in the second condition the eutectic material and/or the bentonite material is arranged at least partly in the annular space.

11 . An annular barrier according to claim 1 , further comprising an equalising fluid channel providing fluid communication between the annular space and the annulus for allowing fluid within the annular space to flow out of the annular space when the eutectic material and/or the bentonite material is displacing the fluid.

12 . An annular barrier according to claim 1 , wherein the first opening, in the first condition, is abutting the eutectic material.

13 . An annular barrier according to claim 1 , wherein in the first condition the eutectic material and/or the bentonite material extends at least partly around a circumference of the tubular metal part.

14 . A downhole system comprising the annular barrier according to claim 1 and a downhole tool string comprising a heating unit for heating the eutectic material.

15 . A downhole system comprising the annular barrier according to claim 1 wherein in an intermediate condition the eutectic material and/or the bentonite material is positioned inside the fluid communication channel.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 8, 2024
From: WELLTEC A/S
To: WELLTEC MANUFACTURING CENTER COMPLETIONS APS
Reel/Frame 069327/0618 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 14, 2024
From: VASQUES, RICARDO REVES
To: WELLTEC OILFIELD SOLUTIONS AG
Reel/Frame 067731/0706 →
Priority Claims (2)
EP 23160016 · Mar 3, 2023 · regional
EP 23190900 · Aug 10, 2023 · regional
Continuity (1)
Related Publication 20240295157A1 · Sep 5, 2024
References Cited (9)
US 9447655B2 · Zhao · 2016 [cited by applicant]
US 20060037748A1 · Wardlaw · 2006 [cited by applicant]
US 20150101813A1 · Zhao · 2015 [cited by examiner]
US 20160348463A1 · Vasques · 2016 [cited by examiner]
CN 215698830U · 2022 [cited by applicant]
EP 2565368A1 · 2013 [cited by examiner]
EP 3303760A1 · 2018 [cited by applicant]
WO 2016049424A1 · 2016 [cited by applicant]
Extended European Search Report for EP23160016.4 dated Jun. 28, 2023, 7 pages. [cited by applicant]