IP Library Granted Patent US 12,330,884
Granted Patent B2
US 12,330,884 · App. 18/607,933 · Granted Jun 17, 2025

Automated workpiece inversion systems and related methods

Inventors: Kenneth Wayne Nicholson (Cambridge, CA); Philip David Munroe (Cambridge, CA); James Mark McLean (Cambridge, CA); Robert James MacGregor (Cambridge, CA); David Andrew Tait (Cambridge, CA); Gustavo Barea (Cambridge, CA); Roger Craig Hogan (Cambridge, CA)
Assignee: ATS CORPORATION
B65G47/248B65G47/902B65G47/905B65G2203/0283
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,330,884
App. No.
18/607,933
Granted
Jun 17, 2025
Kind
B2
Abstract

A method of inverting workpieces in a mass production process includes: advancing an end effector in electronic synchronization with advancement of a carrier to synchronize arrival of the carrier at a stop position with arrival of the end effector at an unloading position, in which the end effector is in alignment with a workpiece held by the carrier for engaging the workpiece; while the end effector is in engagement with the workpiece, retracting the end effector away from the carrier to unload the workpiece from the carrier and advancing the end effector back toward the carrier to load the workpiece back into the carrier; and rotating the end effector relative to the carrier to invert the workpiece in electronic synchronization with the retracting and advancing of the end effector for loading the workpiece back into the carrier when inverted.

Claims (24)

1. A method of inverting workpieces in an automated mass production process, comprising:

a) advancing a carrier to a workpiece inversion station, the carrier holding at least one workpiece; and

b) operating at least one end effector of the workpiece inversion station to unload a respective workpiece from the carrier, invert the workpiece when unloaded, and load the workpiece back into the carrier when inverted.

2. The method of claim 1 , wherein during (b), the workpiece is unloaded from a first location on the carrier and loaded back on the carrier at a second location on the carrier spaced apart from the first location.

3. The method of claim 2 , wherein the first location comprises a first nest for holding the workpiece prior to inversion, and the second location comprises a second nest for holding the workpiece when inverted.

4. The method of claim 2 , wherein the workpiece defines a first product part, and the carrier has a second product part at the second location, the second product part loaded into the carrier prior to the carrier arriving at the workpiece inversion station, and wherein (b) includes mating the first product part with the second product part during loading of the workpiece back into the carrier.

5. The method of claim 2 , wherein the second location is at a different elevation relative to the first location.

6. The method of claim 2 , wherein the second location is spaced horizontally apart from the first location.

7. The method of claim 2 , wherein the second location is at an elevation below the first location and spaced horizontally apart from the first location.

8. The method of claim 1 , wherein inversion of the workpiece is initiated during movement of the end effector away from the carrier.

9. The method of claim 1 , wherein inversion of the workpiece is completed during advancement of the end effector back toward the carrier.

10. The method of claim 1 , wherein the end effector unloads, inverts, and loads the workpiece in a generally continuous, uninterrupted translation of the end effector relative to the carrier.

11. The method of claim 1 , further comprising (c), after the workpiece is loaded back into the carrier, advancing the carrier away from the workpiece inversion station, and repeating (a) to (c) for each of a plurality of subsequent carriers.

12. An automated mass production system, comprising:

a) a plurality of carriers translatable through a stop position along a track, each carrier configured for holding at least one workpiece; and

b) a workpiece inversion station adjacent the stop position, the workpiece inversion station including at least one end effector, each end effector configured to unload a respective workpiece from the carrier when the carrier is at the stop position, invert the workpiece when unloaded, and load the workpiece back into the carrier when inverted.

13. The system of claim 12 , wherein the carrier has a first location for holding a respective workpiece prior to unloading and a second location spaced apart from the first location and where the respective workpiece is loaded when inverted.

14. The system of claim 13 , wherein the first location comprises a first nest for holding the workpiece prior to inversion, and the second location comprises a second nest for holding the workpiece when inverted.

15. The system of claim 13 , wherein the workpiece defines a first product part, and the second location is configured for holding a second product part prior to the carrier arriving at the workpiece inversion station, and wherein the end effector is configured to mate the first product part with the second product part during loading of the workpiece back into the carrier.

16. The system of claim 13 , wherein the second location is at a different elevation relative to the first location.

17. The system of claim 13 , wherein the second location is spaced horizontally apart from the first location perpendicular to the track.

18. The system of claim 12 , wherein the end effector is configured to initiate inversion of the workpiece during movement of the end effector away from the carrier.

19. The system of claim 12 , wherein the end effector is configured to complete inversion of the workpiece during advancement of the end effector back toward the carrier.

20. The system of claim 12 , wherein the end effector is configured to unload, invert, and load the at least one workpiece during a generally continuous, uninterrupted translation of the end effector relative to the carrier.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE SPELLING OF ASSIGNOR FROM BAREA, GUSSTAVO TO BAREA, GUSTAVO PREVIOUSLY RECORDED ON REEL 66808 FRAME 688. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Nov 14, 2024
From: NICHOLSON, KENNETH WAYNE; MUNROE, PHILIP DAVID; MCLEAN, JAMES MARK; MACGREGOR, ROBERT JAMES; TAIT, DAVID ANDREW; BAREA, GUSTAVO; HOGAN, ROGER CRAIG
To: ATS AUTOMATION TOOLING SYSTEMS INC.
Reel/Frame 069385/0643 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 18, 2024
From: NICHOLSON, KENNETH WAYNE; MUNROE, PHILIP DAVID; MCLEAN, JAMES MARK; MACGREGOR, ROBERT JAMES; TAIT, DAVID ANDREW; BAREA, GUSSTAVO; HOGAN, ROGER CRAIG
To: ATS AUTOMATION TOOLING SYSTEMS INC.
Reel/Frame 066808/0688 →
CHANGE OF NAME Recorded Mar 18, 2024
From: ATS AUTOMATION TOOLING SYSTEMS INC.
To: ATS CORPORATION
Reel/Frame 066808/0906 →
Continuity (3)
Continuation 17697627 · Mar 17, 2022
Provisional Application 63168158 · Mar 30, 2021
Related Publication 20240308783A1 · Sep 19, 2024
References Cited (6)
US 5440943A · Holt · 1995 [cited by examiner]
US 6782991B2 · Johansson · 2004 [cited by examiner]
US 7845483B2 · Noguchi · 2010 [cited by examiner]
US 9904281B2 · Nicholson · 2018 [cited by examiner]
US 10018985B2 · Nicholson · 2018 [cited by examiner]
US 11932497B2 · Nicholson · 2024 [cited by examiner]