IP Library › Granted Patent US 12,550,179
Granted Patent B2
US 12,550,179 · App. 18/657,037 · Granted Feb 10, 2026

RLM and beam failure detection based on a mix of different reference signals

Inventors: Icaro L. J. da Silva (Solna, SE); Rui Fan (Beijing, CN); Claes Tidestav (Bålsta, SE); Umut Ugurlu (Cambridge, GB)
Assignee: Telefonaktiebolaget LM Ericsson (publ)
H04W72/542H04L5/0023H04W56/001H04W72/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,550,179
App. No.
18/657,037
Granted
Feb 10, 2026
Kind
B2
Abstract

A user equipment, UE, performs measurements based on a plurality of RLM sources received in beam-formed downlink signals, where the measurements indicate a quality of a given cell or beam. The plurality of sources comprises two or more of: first reference signals (RSs), second RSs of a different type than the first RSs, and one or more physical channel quality indicators obtained from non-reference-signal data in the beam-formed downlink signals. For each of the plurality of sources used to perform measurements, the UE determines whether a measurement for the respective source indicates an out-of-sync event in response to the measurement being below a first threshold. The UE then performs an RLM action based on determined occurrences of out-of-sync events.

Claims (41)

1 . A method, in a user equipment (UE), the method comprising:

performing measurements based on each of a plurality of radio link management (RLM) measurement sources received in beam-formed downlink signals, wherein the plurality of RLM measurement sources comprises one or more first reference signals (RSs) and one or more second RSs of a different type than the first one or more RSs;

for each of a plurality of evaluation periods and for each RLM measurement source used to perform the measurements, determining whether a measurement for the respective RLM measurement source is below a first threshold;

performing one or more RLM actions based on said determining.

2 . The method of claim 1 , wherein the first and second RSs are channel-state information reference signals (CSI-RSs) and reference signals from one or more synchronization signal blocks (SSBs), respectively.

3 . The method of claim 1 , wherein performing the one or more RLM actions based on said determining comprises performing a first RLM action in response to determining that a threshold number of consecutive instances of the measurement being below the first threshold has occurred.

4 . The method of claim 3 , wherein the first RLM action comprises starting a timer.

5 . The method of claim 3 , wherein the first RLM action comprises one of: providing higher layer notifications; declaring radio link failure (RLF); and declaring beam failure.

6 . The method of claim 3 , wherein the threshold number is established separately for each source of the plurality of RLM measurement sources.

7 . The method of claim 3 , wherein the threshold number for one or more of the plurality of RLM measurement sources is shared by a different RLM measurement source.

8 . The method of claim 1 , wherein performing the measurements based on each of the plurality of RLM measurement sources comprises:

monitoring a control channel region of one or more of the beam-formed downlink signals and associated with a control channel message for the UE; and

in response to determining that data is scheduled in a given subframe of the control channel region:

determining, during an evaluation period, a first measurement by computing a first quality estimate using one or more first RSs, wherein the first RSs are demodulation reference symbols (DMRS) in the control channel region; and

determining, during the evaluation period, a second measurement by computing a second quality estimate using the one or more second RSs, wherein the one or more second RSs are one of: one or more primary synchronization signals (PSSs); one or more secondary synchronization signals (SSSs); one or more tertiary synchronization signals (TSSs); one or more DMRSs used for a physical broadcast channel (PBCH); one or more of channel state information-reference signals (CSI-RSs); one or more mobility reference signals (MRSs); and one or more beam measurement reference signals (BRSs).

9 . The method of claim 8 , wherein the first quality estimate is computed as an average of first radio signal metrics measured from the one or more first RSs over the evaluation period, and wherein the second quality estimate is computed as an average of second radio signal metrics measured from the one or more second RSs over the evaluation period.

10 . A user equipment (UE) comprising:

transceiver circuitry configured to receive beam-formed downlink signals; and

processing circuitry operatively associated with the transceiver circuitry and configured to:

perform measurements based on each of a plurality of radio link management (RLM) measurement sources received in beam-formed downlink signals, wherein each measurement indicates a quality of a given cell or beam, and wherein the plurality of RLM measurement sources comprises one or more first reference signals (RSs) and one or more second RSs of a different type than the first one or more RSs;

determine whether a measurement for the respective RLM measurement source is below a first threshold;

perform one or more RLM actions based on said determining.

11 . The UE of claim 10 , wherein the first and second RSs are channel-state information reference signals (CSI-RSs) and reference signals from one or more synchronization signal blocks (SSBs), respectively.

12 . The UE of claim 10 , wherein the processing circuitry is configured to perform the one or more RLM actions based on said determining by performing a first RLM action in response to determining that a threshold number of consecutive instances of the measurement being below the first threshold has occurred.

13 . The UE of claim 12 , wherein the first RLM action comprises starting a timer.

14 . The UE of claim 12 , wherein the first RLM action comprises one of: providing higher layer notifications; declaring radio link failure (RLF); and declaring beam failure.

15 . The UE of claim 12 , wherein the threshold number is established separately for each source of the plurality of RLM measurement sources.

16 . The UE of claim 12 , wherein the threshold number for one or more of the plurality of RLM measurement sources is shared by a different RLM measurement source.

17 . The UE of claim 10 , wherein the processing circuitry is configured to perform the measurements based on the plurality of RLM measurement sources by:

monitoring a control channel region of one or more of the beam-formed downlink signals and associated with a control channel message for the UE; and

in response to determining that data is scheduled in a given subframe of the control channel region:

determining, during an evaluation period, a first measurement by computing a first quality estimate using one or more first RSs, wherein the first RSs are demodulation reference symbols (DMRS) in the control channel region; and

determining, during the evaluation period, a second measurement by computing a second quality estimate using the one or more second RSs, wherein the one or more second RSs are one of: one or more primary synchronization signals (PSSs); one or more secondary synchronization signals (SSSs); one or more tertiary synchronization signals (TSSs); one or more DMRSs used for a physical broadcast channel (PBCH); one or more of channel state information-reference signals (CSI-RSs); one or more mobility reference signals (MRSs); and one or more beam measurement reference signals (BRSs).

18 . The UE of claim 17 , wherein the first quality estimate is computed as an average of first radio signal metrics measured from the one or more first RSs over the evaluation period, and wherein the second quality estimate is computed as an average of second radio signal metrics measured from the one or more second RSs over the evaluation period.

19 . The UE of claim 10 , wherein the processing circuitry is configured to:

receive configuration information for one or more of the plurality of RLM measurement sources; and

perform the measurements based on the configuration information.

20 . A non-transitory computer-readable medium comprising, stored thereupon, a computer program comprising computer program code that, when run on a user equipment (UE) causes the UE to:

perform measurements based on each of a plurality of radio link management (RLM) measurement sources received in beam-formed downlink signals, wherein the plurality of RLM measurement sources comprises one or more first reference signals (RSs) and one or more second RSs of a different type than the first one or more RSs;

determine whether a measurement for the respective RLM measurement source is below a first threshold;

perform one or more RLM actions based on said determining.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 16, 2024
From: DA SILVA, ICARO L. J.; FAN, RUI; TIDESTAV, CLAES
To: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
Reel/Frame 067432/0604 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 16, 2024
From: OY L M ERICSSON AB
To: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
Reel/Frame 067433/0063 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 16, 2024
From: UGURLU, UMUT
To: OY L M ERICSSON AB
Reel/Frame 067433/0443 →
Priority Claims (1)
WO PCT/CN2017/078131 · Mar 24, 2017 · international
Continuity (4)
Continuation 17991993 · Nov 22, 2022
Continuation 16944846 · Jul 31, 2020
Continuation 16082571
Related Publication 20240306181A1 · Sep 12, 2024
References Cited (57)
US 9173109B2 · Xu et al. · 2015 [cited by applicant]
US 9198070B2 · Krishnamurthy et al. · 2015 [cited by applicant]
US 10931515B2 · Han et al. · 2021 [cited by applicant]
US 11178696B2 · Kim · 2021 [cited by examiner]
US 11258573B2 · Kim et al. · 2022 [cited by applicant]
US 20140235243A1 · Damnjanovic · 2014 [cited by examiner]
US 20140269368A1 · Xu · 2014 [cited by examiner]
US 20150043515A1 · Zhang et al. · 2015 [cited by applicant]
US 20160255590A1 · Wang et al. · 2016 [cited by applicant]
US 20160278103A1 · Kazmi et al. · 2016 [cited by applicant]
US 20170230926A1 · Seo et al. · 2017 [cited by applicant]
US 20180007574A1 · Park et al. · 2018 [cited by applicant]
US 20180324702A1 · Takahashi et al. · 2018 [cited by applicant]
US 20190053118A1 · Hahn et al. · 2019 [cited by applicant]
US 20190059031A1 · Hahn et al. · 2019 [cited by applicant]
US 20190132808A1 · Tsuboi et al. · 2019 [cited by applicant]
US 20190182691A1 · Wang et al. · 2019 [cited by applicant]
US 20190320361A1 · Uchiyama et al. · 2019 [cited by applicant]
US 20190357065A1 · Cho et al. · 2019 [cited by applicant]
US 20190380075A1 · Ugurlu et al. · 2019 [cited by applicant]
US 20190394012A1 · Kim · 2019 [cited by examiner]
US 20200028603A1 · Wang · 2020 [cited by examiner]
US 20200236566A1 · Kou et al. · 2020 [cited by applicant]
US 20200274679A1 · Futaki · 2020 [cited by applicant]
US 20200296656A1 · Amuru et al. · 2020 [cited by applicant]
US 20200314946A1 · Tsuboi et al. · 2020 [cited by applicant]
US 20210058797A1 · Yoshioka et al. · 2021 [cited by applicant]
US 20210136823A1 · Kim · 2021 [cited by examiner]
US 20210344431A1 · Zhang et al. · 2021 [cited by applicant]
RU 2597877C2 · 2016 [cited by applicant]
RU 2612408C1 · 2017 [cited by applicant]
WO 2010051504A1 · 2010 [cited by applicant]
WO 2012116022A1 · 2012 [cited by applicant]
WO 2013170209A1 · 2013 [cited by applicant]
WO 2015021320A1 · 2015 [cited by applicant]
WO 2016122232A1 · 2016 [cited by applicant]
WO 2016127403A1 · 2016 [cited by applicant]
WO 2018084798A1 · 2018 [cited by applicant]
WO 2018084799A1 · 2018 [cited by applicant]
WO 2018084800A1 · 2018 [cited by applicant]
3GPP , “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 14)”, 3GPP TS 36.213 V14.0.0, Sep. … [cited by applicant]
3GPP , “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer; Measurements (Release 14) The present”, 3GPP TS 36.214… [cited by applicant]
3GPP , “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Requirements for support of radio resource management (Release 14)”, 3… [cited by applicant]
3GPP , “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) conformance specification Radio transmission and r… [cited by applicant]
Unknown, Author , “Beam recovery”, 3GPP TSG RAN WG2#97, R2-1701730, Athens, Greece, Feb. 13-17, 2017, 1-2. [cited by applicant]
Unknown, Author , “Discussion on NR-PDCCH structure”, 3GPP TSG RAN WG1 Meeting #88, R1-1702475, Athens, Greece, Feb. 13-17, 2017, 1-4. [cited by applicant]
Unknown, Author , “Final Report of 3GPP TSG RAN WG1 #87 v1.0.0”, 3GPP TSG RAN WG1 Meeting #88, R1-1701552, Athens, Greece, Feb. 13-17, 2017, 1-157. [cited by applicant]
Unknown, Author , “Final Report of 3GPP TSG RAN WG1 #88 v1.0.0”, 3GPP TSG RAN WG1 Meeting #88bis, R1-1704172, Spokane, USA, Apr. 3-7, 2017, 1-152. [cited by applicant]
Unknown, Author , “New SID Proposal: Study on New Radio Access Technology”, 3GPP TSG RAN Meeting #71, RP-160671, Goteborg, NTT DOCOMO, Mar. 7-10, 2016, 1-8. [cited by applicant]
Unknown, Author , “NR Radio Link Monitoring”, 3GPP TSG RAN WG1 Meeting AH 1801, R1-1800235, Vancouver, Canada, Jan. 22-26, 2018, 1-5. [cited by applicant]
Unknown, Author , “Radio link monitoring and radio link failure handling”, 3GPP TSG RAN WG2#97, R2-1701729, Athens, Greece, Feb. 13-17, 2017, 1-3. [cited by applicant]
Unknown, Author , “Remaining details on radio link monitoring”, 3GPP TSG-RAN WG1 NR AH #18-01, R1-1800808, Vancouver, Canada, Jan. 22-26, 2018, 1-4. [cited by applicant]
Unknown, Author , “Remaining details on radio link monitoring”, 3GPP TSG RAN WG1 Meeting AH 1801, R1-1800900, Vancouver, Canada, Jan. 22-26, 2018, 1-5. [cited by applicant]
Unknown, Author , “Report of 3GPP TSG RAN WG2 meeting #95bis”, 3GPP TSG-RAN Working Group 2 meeting #96, R2-167461, Reno, Nevada, Nov. 14-18, 2016, 1-196. [cited by applicant]
Unknown, Author , “Report of 3GPP TSG RAN WG2 meeting #97, Athens, Greece”, 3GPP TSG-RAN Working Group 2 meeting #97bis, R2-1702451, Spokane, USA, Apr. 3-7, 2017, 1-300. [cited by applicant]
Unknown, Author , “RLM and RLF in HF NR”, 3GPP TSG RAN WG2 Meeting #95, R2-164899, Gothenburg, Sweden, Aug. 22-26, 2016, 1-4. [cited by applicant]
Unknown, Author , “RLM and RLF in NR”, 3GPP TSG-RAN WG2 #97, Tdoc R2-1700868, Athens, Greece, Feb. 13-17, 2017, 1-4. [cited by applicant]