IP Library › Granted Patent US 12,180,821
Granted Patent B1
US 12,180,821 · App. 18/664,335 · Granted Dec 31, 2024

Method and system for predicting maximum build rate of push-the-bit rotary steering tool

Inventors: Jiantao Zhang (Chengdu, CN); Hanbing Yan (Chengdu, CN); Dongxing Qin (Chengdu, CN)
Assignee: Chengdu University of Information Technology
E21B44/00E21B7/06E21B2200/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,180,821
App. No.
18/664,335
Granted
Dec 31, 2024
Kind
B1
Abstract

A method and system for predicting a maximum build rate of a push-the-bit rotary steering tool is provided. In the method, a mechanical mathematical model of a push-the-bit rotary steering device is combined with measured well inclination data of the rotary steering device during actual drilling, a theoretical maximum build rate of a steering tool is calculated by the mechanical mathematical model, and a correction factor is combined with the mechanical mathematical model to predict a maximum build rate of the steering tool during a drilling operation in a same layer of a same block. The method effectively solves the problem of predicting the maximum build rate of the push-the-bit rotary steering device with different parameter changes based on measured data. Therefore, the method and system provide a reliable means for operators to analyze the performance of the push-the-bit rotary steering device, thereby providing technical support for efficient drilling operations.

Claims (1006)

1. A method for predicting a maximum build rate of a push-the-bit rotary steering tool, comprising the following steps:

step 1: selecting a push-the-bit rotary steering device that has been used in an actual directional well operation;

step 2: calculating, by a mechanical mathematical model, a theoretical maximum build rate of the push-the-bit rotary steering device;

step 3: calculating a measured maximum build rate in a working well depth interval based on measured well inclination data and a record of a steering force used by the push-the-bit rotary steering device in the working well depth interval;

step 4: calculating a correction factor based on the theoretical maximum build rate and the measured maximum build rate; and

step 5: changing a parameter in the mechanical mathematical model based on the correction factor to predict a maximum build rate of the push-the-bit rotary steering device with a different configuration;

step 6: adjusting a structure of the rotary steering tool based on the predicted maximum build rate during operation,

wherein, the mechanical mathematical model is established by: setting a current wellbore curvature of the push-the-bit rotary steering device as k c , mechanically simplifying the push-the-bit rotary steering device by assuming the push-the-bit rotary steering device as being formed by two beam columns, and acquiring a beam column model of the push-the-bit rotary steering device, wherein the push-the-bit rotary steering device is simplified to comprise a drill bit, a stabilizer, and a steering device,

wherein in the calculation by the mechanical mathematical model, parameters are recorded, comprising: an outer diameter D bit of the drill bit, an outer diameter D sta of the stabilizer, a weight on bit WOB, a pushing force F p generated by a pushing pad, maximum pushing force F pmax generated by a pushing pad a distance L AC from the drill bit to the pushing pad, a distance L CB from the pushing pad to the stabilizer, a length L AB of the steering device, an outer diameter D ot of the steering device, an inner diameter D it of the steering device, a bending stiffness EI of the steering device, and a linear weight q t of the steering device, wherein L AB =L AC +L CB , wherein in the beam column model, a displacement y AC of the push-the-bit rotary steering device under a stress between the drill bit and the pushing pad and a displacement y CB between the pushing pad and the stabilizer are expressed as follows:

y

AC

=

c

2

⁢

cos

⁡

(

x

⁢

WOB

⁢

cos

⁡

(

L

AB

⁢

k

c

)

EI

)

+

c

1

⁢

sin

⁡

(

x

⁢

WOB

⁢

cos

⁡

(

L

AB

⁢

k

c

)

EI

)

+

x

2

⁢

q

t

⁢

sec

⁡

(

L

AB

⁢

k

c

)

2

⁢

WOB

+

c

3

⁢

x

+

c

4

;

(

1

)

y

CB

=

c

6

⁢

cos

⁡

(

x

⁢

WOB

⁢

cos

⁡

(

L

AB

⁢

k

c

)

EI

)

+

c

5

⁢

sin

⁡

(

x

⁢

WOB

⁢

cos

⁡

(

L

AB

⁢

k

c

)

EI

)

+

x

2

⁢

q

t

⁢

sec

⁡

(

L

AB

⁢

k

c

)

2

⁢

WOB

+

c

7

⁢

x

+

c

8

;

(

2

)

wherein, c 1 , c 2 , c 3 , c 4 , c 5 , c 6 , c 7 , and c 8 denote 8 coefficients to be solved, and are calculated by the following boundary conditions:

y

A

⁢

C

|

x

=

-

L

AB

=

1

2

×

k

c

×

L

AB

2

+

D

bit

2

(

3

)

y

AC

|

x

=

-

L

CB

=

y

CB

|

x

=

-

L

CB

(

4

)

y

C

⁢

B

|

x

=

0

=

D

sta

2

+

(

D

bit

-

D

sta

)

(

5

)

dy

AC

d

⁢

x

❘

"\[RightBracketingBar]"

x

=

-

L

AB

=

0

(

6

)

d

⁢

y

AC

d

⁢

x

❘

"\[RightBracketingBar]"

x

=

-

L

CB

=

dy

CB

d

⁢

x

❘

"\[RightBracketingBar]"

x

=

-

L

CB

(

7

)

d

2

⁢

y

AC

dx

2

❘

"\[RightBracketingBar]"

x

=

-

L

CB

=

d

2

⁢

y

CB

dx

2

❘

"\[RightBracketingBar]"

x

=

-

L

CB

(

8

)

d

2

⁢

y

CB

dx

2

❘

"\[RightBracketingBar]"

x

=

0

=

0

(

9

)

-

EI

⁢

d

3

⁢

y

AC

dx

3

❘

"\[RightBracketingBar]"

x

=

-

L

CB

-

F

c

⁢

d

⁢

y

AC

dx

❘

"\[RightBracketingBar]"

x

=

-

L

CB

-

EI

⁢

d

3

⁢

y

CB

dx

3

❘

"\[RightBracketingBar]"

x

=

-

L

CB

-

F

c

⁢

dy

CB

dx

=

F

pmax

(

10

)

wherein

,

F

c

=

WOB

×

cos

⁡

(

k

c

×

L

AB

)

.

2. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1 , wherein

after the 8 coefficients to be solved are calculated, a lateral force on the drill bit is calculated:

F

d

=

EI

⁢

d

3

⁢

y

A

⁢

C

dx

3

❘

"\[LeftBracketingBar]"

x

=

-

L

AB

+

F

c

⁢

dy

AC

d

⁢

x

❘

"\[RightBracketingBar]"

x

=

-

L

AB

-

WOB

×

sin

⁡

(

k

c

×

L

AB

)

(

11

)

wherein, F d denotes the lateral force on the drill bit.

3. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1 , wherein after the lateral force on the drill bit is calculated, the theoretical maximum build rate of the push-the-bit rotary steering device is calculated:

k max =FindRoot( F d =0, k c )  (12)

wherein, k max denotes the maximum build rate; the theoretical maximum build rate is acquired by letting the lateral force F d on the drill bit be 0 and calculating the wellbore curvature k c in the expression; and FindRoot denotes a root-finding function.

4. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1 , wherein after predicting the theoretical maximum build rate, measured well inclination data of a rotary steering tool with a same parameter during a drilling operation in a certain layer of a certain block is processed, and a measured maximum build rate of the rotary steering tool during drilling in the layer is calculated as follows:

a series of steering commands during the operation in the layer are assumed as comprising different steering force percentages and steering orientations, a starting well depth and an ending well depth of each steering command in an action period are defined, and a measured maximum build rate in a well depth interval under the action of the command is calculated:

wherein, Inc st denotes an inclination angle at a starting point of a steering command interval, and Azi st denotes an azimuth angle at the starting point of the steering command interval;

Dogleg

mac

i

=

DoglegFun

⁡

(

Inc

si

,

Azi

st

,

Inc

ed

,

Azi

ed

)

(

MD

ed

-

MD

st

)

×

SFR

100

(

13

)

MD st denotes a well depth at the starting point of the steering command interval; Inc ed denotes an inclination angle at an ending point of the steering command interval; Azi ed denotes an azimuth angle at the ending point of the steering command interval; MD ed denotes a well depth at the ending point of the steering command interval; and DoglegFun denotes a dogleg calculation function for a trajectory formed in the steering command interval; and

a set of measured maximum build rates for different steering commands during the operation in the layer is calculated, and a representative measured maximum build rate from n measured maximum build rates of the set is selected by using different filtering methods comprising a median taking method or an average taking method:

Dogleg max =FilterFun(Dogleg max 1 ,Dogleg max 2 ,Dogleg max 3 , . . . ,Dogleg max n )  (14)

wherein, FilterFun denotes a filtering function, SFR denotes steering force percentage, and a corresponding filtering method is used as needed.

5. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1 , wherein the correction factor α is calculated based on the measured maximum build rate and the theoretical maximum build rate:

α

=

Dogleg

max

k

max

(

15

)

wherein, k max denotes the maximum build rate, and Dogleg max denotes the measured maximum build rate.

6. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1 , wherein after the correction factor α is calculated, different parameters are substituted into the mechanical mathematical model expressed by Eqs. (1) to (12) to predict the maximum build rate k RSS of the push-the-bit rotary steering device in the same layer of the same block:

k RSS =α×k max   (16)

wherein, α denotes the correction factor, and k max denotes the maximum build rate.

7. A computer system, comprising a processor and a memory, wherein the memory is configured to store a computer program executable on the processor; and the processor is configured to execute the computer program to implement steps of the method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1 .

8. The computer system according to claim 7 , wherein in the calculation by the mechanical mathematical model, parameters are recorded, comprising: an outer diameter D bit of the drill bit, an outer diameter D sta of the stabilizer, a weight on bit WOB, a pushing force F p generated by a pushing pad, a distance L AC from the drill bit to the pushing pad, a distance L CB from the pushing pad to the stabilizer, a length L AB of the steering device, an outer diameter D ot of the steering device, an inner diameter D it of the steering device, a bending stiffness EI of the steering device, and a linear weight q t of the steering device, wherein L AB =L AC +L CB .

9. The computer system according to claim 8 , wherein in the beam column model, a displacement y AC of the push-the-bit rotary steering device under a stress between the drill bit and the pushing pad and a displacement y CB between the pushing pad and the stabilizer are expressed as follows:

y

AC

=

c

2

⁢

cos

⁡

(

x

⁢

WOB

⁢

cos

⁡

(

L

AB

⁢

k

c

)

EI

)

+

c

1

⁢

sin

⁡

(

x

⁢

WOB

⁢

cos

⁡

(

L

AB

⁢

k

c

)

EI

)

+

x

2

⁢

q

t

⁢

sec

⁡

(

L

AB

⁢

k

c

)

2

⁢

WOB

+

c

3

⁢

x

+

c

4

;

(

1

)

y

CB

=

c

6

⁢

cos

⁡

(

x

⁢

WOB

⁢

cos

⁡

(

L

AB

⁢

k

c

)

EI

)

+

c

5

⁢

sin

⁡

(

x

⁢

WOB

⁢

cos

⁡

(

L

AB

⁢

k

c

)

EI

)

+

x

2

⁢

q

t

⁢

sec

⁡

(

L

AB

⁢

k

c

)

2

⁢

WOB

+

c

7

⁢

x

+

c

8

;

(

2

)

wherein, c 1 , c 2 , c 3 , c 4 , c 5 , c 6 , c 7 , and c 8 denote 8 coefficients to be solved, and are calculated by the following boundary conditions:

y

AC

❘

"\[LeftBracketingBar]"

x

=

-

L

AB

=

1

2

×

k

c

×

L

AB

2

+

D

bit

2

(

3

)

y

AC

❘

"\[LeftBracketingBar]"

x

=

-

L

CB

=

y

CB

❘

"\[LeftBracketingBar]"

x

=

-

L

CB

(

4

)

y

CB

❘

"\[LeftBracketingBar]"

x

=

0

=

D

sta

2

+

(

D

bit

-

D

sta

)

(

5

)

dy

AC

dx

❘

"\[LeftBracketingBar]"

x

=

-

L

AB

=

0

(

6

)

dy

AC

dx

❘

"\[RightBracketingBar]"

x

=

-

L

CB

=

dy

CB

dx

❘

"\[RightBracketingBar]"

x

=

-

L

CB

(

7

)

d

2

⁢

y

AC

dx

2

❘

"\[RightBracketingBar]"

x

=

-

L

CB

=

d

2

⁢

y

CB

dx

2

❘

"\[RightBracketingBar]"

x

=

-

L

CB

(

8

)

d

2

⁢

y

CB

dx

2

❘

"\[RightBracketingBar]"

x

=

0

=

0

(

9

)

-

EI

⁢

d

3

⁢

y

AC

dx

3

❘

"\[RightBracketingBar]"

x

=

-

L

AB

-

F

c

⁢

dy

AC

dx

❘

"\[RightBracketingBar]"

x

=

-

L

CB

-

EI

⁢

d

3

⁢

y

CB

dx

3

❘

"\[RightBracketingBar]"

x

=

-

L

CB

-

F

c

⁢

dy

CB

dx

=

F

pmax

(

10

)

wherein, F c =WOB×cos (k c ×L AB ).

10. The computer system according to claim 9 , wherein

after the 8 coefficients to be solved are calculated, a lateral force on the drill bit is calculated:

F

d

=

EI

⁢

d

3

⁢

y

AC

dx

3

❘

"\[RightBracketingBar]"

x

=

-

L

AB

+

F

c

⁢

dy

AC

dx

❘

"\[RightBracketingBar]"

x

=

-

L

AB

-

WOB

×

sin

⁡

(

k

c

×

L

AB

)

(

11

)

wherein, F d denotes the lateral force on the drill bit.

11. The computer system according to claim 10 , wherein after the lateral force on the drill bit is calculated, the theoretical maximum build rate of the push-the-bit rotary steering device is calculated:

k max =FindRoot( F d =0, k c )  (12)

wherein, k max denotes the maximum build rate; the theoretical maximum build rate is acquired by letting the lateral force F d on the drill bit be 0 and calculating the wellbore curvature k c in the expression; and FindRoot denotes a root-finding function.

12. The computer system according to claim 11 , wherein after predicting the theoretical maximum build rate, measured well inclination data of a rotary steering tool with a same parameter during a drilling operation in a certain layer of a certain block is processed, and a measured maximum build rate of the rotary steering tool during drilling in the layer is calculated as follows:

a series of steering commands during the operation in the layer is assumed as comprising different steering force percentages and steering orientations, a starting well depth and an ending well depth of each steering command in an action period are defined, and a measured maximum build rate in a well depth interval under the action of the command is calculated:

wherein, Inc st denotes an inclination angle at a starting point of a steering command interval, and Azi st denotes an azimuth angle at the starting point of the steering command interval;

Dogleg

max

i

=

DoglegFun

⁡

(

Inc

st

,

Azi

st

,

Inc

ed

,

Azi

ed

)

(

MD

ed

-

MD

st

)

×

SFR

100

(

13

)

MD st denotes a well depth at the starting point of the steering command interval; Inc ed denotes an inclination angle at an ending point of the steering command interval; Azi ed denotes an azimuth angle at the ending point of the steering command interval; MD ed denotes a well depth at the ending point of the steering command interval; and DoglegFun denotes a dogleg calculation function for a trajectory formed in the steering command interval; and

a set of measured maximum build rates for different steering commands during the operation in the layer is calculated, and a representative measured maximum build rate from n measured maximum build rates of the set is selected by using different filtering methods comprising a median taking method or an average taking method:

Dogleg max =FilterFun(Dogleg max 1 ,Dogleg max 2 ,Dogleg max 3 , . . . ,Dogleg max n )  (14)

wherein, FilterFun denotes a filtering function, and a corresponding filtering method is used as needed.

13. The computer system according to claim 12 , wherein the correction factor α is calculated based on the measured maximum build rate and the theoretical maximum build rate:

α

=

Dogleg

max

k

max

(

15

)

wherein, k max denotes the maximum build rate, and Dogleg max denotes the measured maximum build rate.

14. The computer system according to claim 13 , wherein after the correction factor α is calculated, different parameters are substituted into the mechanical mathematical model expressed by Eqs. (1) to (12) to predict the maximum build rate k RSS of the push-the-bit rotary steering device in the same layer of the same block:

k RSS =α×k max   (16)

wherein, α denotes the correction factor, and k max denotes the maximum build rate.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 15, 2024
From: ZHANG, JIANTAO; YAN, HANBING; QIN, DONGXING
To: CHENGDU UNIVERSITY OF INFORMATION TECHNOLOGY
Reel/Frame 067413/0842 →
Priority Claims (1)
CN 202311154640.3 · Sep 8, 2023 · national
Cited By (1)
US 12,392,198