IP Library › Patent Application 18792026
Patent Application
App. No. 18/792,026

METHOD AND APPARATUS FOR NETWORK ENERGY SAVING

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
18/792,026
Abstract

A method performed by a User Equipment (UE) for Network Energy Saving (NES) is provided. The method receives, from a Base Station (BS), a Radio Resource Control (RRC) message including an NES configuration. The method then determines whether to apply a cell Discontinuous Transmission (DTX) operation, a cell Discontinuous Reception (DRX) operation, or both the cell DTX operation and the cell DRX operation based on the NES configuration.

Claims (53)

1 . A method performed by a User Equipment (UE) for Network Energy Saving (NES), the method comprising:

receiving, from a Base Station (BS), a Radio Resource Control (RRC) message comprising an NES configuration; and

determining whether to apply a cell Discontinuous Transmission (DTX) operation, a cell Discontinuous Reception (DRX) operation, or both the cell DTX operation and the cell DRX operation based on the NES configuration.

2 . The method of claim 1 , wherein:

the NES configuration is included in a cell configuration carried by the RRC message, and

the cell DTX operation, the cell DRX operation, or both the cell DTX operation and the cell DRX operation is/are applied to a cell associated with the cell configuration.

3 . The method of claim 1 , wherein:

the UE is served by a plurality of cells, and

the cell DTX operation, the cell DRX operation, or both the cell DTX operation and the cell DRX operation is/are applied to one of the plurality of cells serving the UE.

4 . The method of claim 1 , wherein:

the NES configuration comprises a set of common parameters applicable to both the cell DTX operation and the cell DRX operation.

5 . The method of claim 4 , wherein:

the set of common parameters comprises at least one of an on-duration timer, a cycle, a start offset, and a slot offset.

6 . The method of claim 4 , further comprising:

determining a first on-duration period for the cell DTX operation and a second on-duration period for the cell DRX operation based on the set of common parameters.

7 . The method of claim 1 , wherein:

the NES configuration comprises a parameter for indicating whether to apply the cell DTX operation, the cell DRX operation, or both the cell DTX operation and the cell DRX operation.

8 . A User Equipment (UE) for performing Network Energy Saving (NES), the UE comprising:

at least one processor; and

at least one non-transitory computer-readable medium storing one or more computer-executable instructions that, when executed by the at least one processor, cause the UE to:

receive, from a Base Station (BS), a Radio Resource Control (RRC) message comprising an NES configuration; and

determine whether to apply a cell Discontinuous Transmission (DTX) operation, a cell Discontinuous Reception (DRX) operation, or both the cell DTX operation and the cell DRX operation based on the NES configuration.

9 . The UE of claim 8 , wherein:

the NES configuration is included in a cell configuration carried by the RRC message, and

the cell DTX operation, the cell DRX operation, or both the cell DTX operation and the cell DRX operation is/are applied to a cell associated with the cell configuration.

10 . The UE of claim 8 , wherein:

the UE is served by a plurality of cells, and

the cell DTX operation, the cell DRX operation, or both the cell DTX operation and the cell DRX operation is/are applied to one of the plurality of cells serving the UE.

11 . The UE of claim 8 , wherein:

the NES configuration comprises a set of common parameters applicable to both the cell DTX operation and the cell DRX operation.

12 . The UE of claim 11 , wherein:

the set of common parameters comprises an on-duration timer, a cycle, a start offset, and a slot offset.

13 . The UE of claim 11 , wherein the one or more computer-executable instructions, when executed by the at least one processor, further cause the UE to:

determine a first on-duration period for the cell DTX operation and a second on-duration period for the cell DRX operation based on the set of common parameters.

14 . The UE of claim 8 , wherein:

the NES configuration comprises a parameter for indicating whether to apply the cell DTX operation, the cell DRX operation, or both the cell DTX operation and the cell DRX operation.

15 . A Base Station (BS) for performing Network Energy Saving (NES), the BS comprising:

at least one processor; and

at least one non-transitory computer-readable medium storing one or more computer-executable instructions that, when executed by the at least one processor, cause the BS to:

transmit, to a User Equipment (UE), a Radio Resource Control (RRC) message comprising an NES configuration,

wherein the NES configuration indicates to the UE whether to apply a cell Discontinuous Transmission (DTX) operation, a cell Discontinuous Reception (DRX) operation, or both the cell DTX operation and the cell DRX operation.

16 . The BS of claim 15 , wherein:

the NES configuration is included in a cell configuration carried by the RRC message, and

the cell DTX operation, the cell DRX operation, or both the cell DTX operation and the cell DRX operation is/are applied to a cell associated with the cell configuration.

17 . The BS of claim 15 , wherein:

the UE is served by a plurality of cells, and

the cell DTX operation, the cell DRX operation, or both the cell DTX operation and the cell DRX operation is/are applied to one of the plurality of cells serving the UE.

18 . The BS of claim 15 , wherein:

the NES configuration comprises a set of common parameters applicable to both the cell DTX operation and the cell DRX operation.

19 . The BS of claim 18 , wherein:

the set of common parameters comprises an on-duration timer, a cycle, a start offset, and a slot offset.

20 . The BS of claim 18 , wherein the one or more computer-executable instructions, when executed by the at least one processor, further cause the BS to:

determine a first on-duration period for the cell DTX operation and a second on-duration period for the cell DRX operation based on the set of common parameters.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 13, 2024
From: FG INNOVATION COMPANY LIMITED
To: SHARP KABUSHIKI KAISHA
Reel/Frame 069349/0707 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 1, 2024
From: CHANG, TZU-WEN; CHOU, CHIE-MING; TSENG, YUNG-LAN; LI, YEN-HUA; LAI, CHIA-HSIN; HSU, CHUN-YEN
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 068156/0434 →