IP Library Granted Patent US 12,348,880
Granted Patent B2
US 12,348,880 · App. 18/829,200 · Granted Jul 1, 2025

Rail-side inspection assemblies and systems

Inventors: Mabby Nicholas Amouie (Atlanta, GA); Evan Thomas Gebhardt (Atlanta, GA); Colin Usher (Atlanta, GA); Alex Samoylov (Atlanta, GA); John Hoang (Atlanta, GA); Sean Thomas (Atlanta, GA); Parth Mandrekar (Atlanta, GA); Brian Thomas Yeager (Atlanta, GA); Thomas Samuel Fox (Atlanta, GA)
Assignee: Norfolk Southern Corporation & Georgia Tech Research Corporation
H04N23/90B61L27/57H04N7/188H04N23/51H04N23/52H04N23/56
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,348,880
App. No.
18/829,200
Granted
Jul 1, 2025
Kind
B2
Abstract

An inspection assembly can comprise a first camera, a second camera, one or more lights, and a housing. The first camera can be angled at least partially in a vertical direction and at least partially in a horizontal direction to thereby be configured to capture images of a target region in a three-dimensional space from a first viewpoint. The second camera can be positioned apart from the first camera, angled at least partially in the vertical direction and at least partially in the horizontal direction, and directed to the target region from a second viewpoint that is different from the first viewpoint. The housing can comprise a base and a shroud and can be configured to attach to one or more rail ties and to at least partially envelop the first camera and the second camera.

Claims (68)

1. An inspection assembly, comprising:

a first camera angled at least partially in a vertical direction and at least partially in a horizontal direction to thereby be configured to capture images of a target region in a three-dimensional space from a first viewpoint;

a second camera positioned apart from the first camera, angled at least partially in the vertical direction and at least partially in the horizontal direction, and directed to the target region from a second viewpoint that is different from the first viewpoint;

one or more lights; and

a housing comprising a base and a shroud, the housing configured to attach to one or more rail ties and to at least partially envelop the first camera and the second camera, wherein the shroud is configured to attach to a first rail tie and a second rail tie and the base is configured to attach to a third rail tie located between the first and second rail ties.

2. The inspection assembly of claim 1 , wherein the shroud covers a rear of the first camera and a rear of the second camera and at least partially covers a top of the first camera and a top of the second camera.

3. The inspection assembly of claim 1 , wherein:

the base comprises a first base portion and a second base portion;

the first base portion comprises a first bottom and one or more first sidewalls;

the second base portion comprises a second bottom and one or more second sidewalls; and

a second sidewall of the one or more second sidewalls nearest the one or more first sidewalls is spaced apart from the one or more first sidewalls such that a gap is formed between the first base portion and the second base portion.

4. The inspection assembly of claim 3 , wherein the gap is sized to at least partially receive a rail tie.

5. The inspection assembly of claim 3 , wherein the first camera is positioned in the first base portion and the second camera is positioned in the second base portion.

6. The inspection assembly of claim 3 , wherein the first bottom and the second bottom are suspended above the ground when the inspection assembly is attached to rail ties.

7. The inspection assembly of claim 1 , wherein:

the first camera and two or more first lights of the one or more lights form a first imaging array; and

the second camera and two or more second lights of the one or more lights form a second imaging array.

8. The inspection assembly of claim 7 , wherein at least one of the first imaging array or the second imaging array is a linear array.

9. The inspection assembly of claim 7 , wherein the housing is configured to attach to one or more rail ties at a position that is outside the rails of a railway.

10. The inspection assembly of claim 9 , wherein the first camera and the second camera are configured to capture images from respective viewpoints that are at respective heights of 3 inches or less, with respect to a top surface of a rail tie to which the inspection assembly is mounted.

11. The inspection assembly of claim 1 , wherein the first camera, the second camera, and the one or more lights are in communication with one or more computing devices configured to determine a capture timing for capturing images of a target component of a moving object as the target component passes through the target region.

12. The inspection assembly of claim 1 , further comprising a first dampening device disposed between the first camera and the housing and a second dampening device disposed between the second camera and the housing.

13. The inspection assembly of claim 12 , wherein:

the first dampening device and the second dampening device each comprises:

a first mounting plate configured to attach to the housing;

a second mounting plate configured to attach to the first camera or the second camera, respectively; and

one or more dampening structures located between the first mounting plate and the second mounting plate.

14. The inspection assembly of claim 13 , wherein the one or more dampening structures comprises one or more springs.

15. An inspection system, comprising:

a plurality of inspection assemblies, each of the plurality of inspection assemblies comprising:

a first camera angled at least partially in a vertical direction and at least partially in a horizontal direction to thereby be configured to capture images of a target region in a three-dimensional space from a first viewpoint that is at a first height of 3 inches or less with respect to a top surface of one or more rail ties to which the inspection assembly is mounted;

a second camera positioned apart from the first camera, angled at least partially in the vertical direction and at least partially in the horizontal direction, and directed to the target region from a second viewpoint that is different from the first viewpoint, the second viewpoint being at a first height of 3 inches or less with respect to the top surface of the one or more rail ties to which the inspection assembly is mounted;

a first imaging array comprising the first camera and two or more first lights;

a second imaging array comprising the second camera and two or more second lights; and

a housing comprising a base and a shroud, the housing configured to attach to one or more rail ties and to at least partially envelop the first camera and the second camera, wherein:

each of the plurality of inspection assemblies is mounted to one or more rail ties at a corresponding location that is outside the rails of a railway;

a first inspection assembly of the plurality of inspection assemblies is located on a first side of the rails at a first longitudinal location along the railway; and

a second inspection assembly of the plurality of inspection assemblies is located on a second side of the rails at a second longitudinal location along the railway, the second side being opposite the first side.

16. The inspection system of claim 15 , wherein the second longitudinal location is the same as the first longitudinal location.

17. The inspection system of claim 15 , wherein the second longitudinal location is different from the first longitudinal location.

18. The inspection system of claim 15 , further comprising:

one or more wheel detection sensors configured to detect a presence or a non-presence of a railcar wheel at a location along the railway that is upstream from the plurality of inspection assemblies; and

one or more computing devices in communication with:

the one or more wheel detection sensors; and

inspection cameras comprising the first and second cameras of each of the plurality of inspection assemblies,

wherein the one or more computing devices is configured to determine a capture timing for each of the inspection cameras based at least in part on a train speed estimation determined according to wheel detection events detected by the wheel detection sensors.

19. The inspection system of claim 18 , wherein the one or more computing devices is further configured to determine the capture timing for each of the inspection cameras based on at least (i) a physical distance between the wheel detection sensors and each corresponding one of the inspection cameras and (ii) one or more electrical signal transmission or processing latencies.

20. An inspection assembly, comprising:

a first camera angled at least partially in a vertical direction and at least partially in a horizontal direction to thereby be configured to capture images of a target region in a three-dimensional space from a first viewpoint;

a second camera positioned apart from the first camera, angled at least partially in the vertical direction and at least partially in the horizontal direction, and directed to the target region from a second viewpoint that is different from the first viewpoint;

one or more lights; and

a housing comprising a base and a shroud, the housing configured to attach to one or more rail ties and to at least partially envelop the first camera and the second camera,

wherein:

the base comprises a first base portion and a second base portion;

the first base portion comprises a first bottom and one or more first sidewalls;

the second base portion comprises a second bottom and one or more second sidewalls;

the first camera is positioned in the first base portion and the second camera is positioned in the second base portion; and

a second sidewall of the one or more second sidewalls nearest the one or more first sidewalls is spaced apart from the one or more first sidewalls such that a gap is formed between the first base portion and the second base portion.

21. The inspection assembly of claim 20 , wherein the shroud is configured to be attached to a first rail tie and a second rail tie and the base is configured to be attached to a third rail tie located between the first and second rail ties.

22. An inspection assembly, comprising:

a first camera angled at least partially in a vertical direction and at least partially in a horizontal direction to thereby be configured to capture images of a target region in a three-dimensional space from a first viewpoint;

a second camera positioned apart from the first camera, angled at least partially in the vertical direction and at least partially in the horizontal direction, and directed to the target region from a second viewpoint that is different from the first viewpoint;

a first imaging array comprising the first camera and two or more first lights;

a second imaging array comprising the second camera and two or more second lights; and

a housing comprising a base and a shroud, the housing configured to attach to one or more rail ties and to at least partially envelop the first camera and the second camera,

wherein:

the housing is configured to attach to one or more rail ties at a position that is outside the rails of a railway; and

the first camera and the second camera are configured to capture images from respective viewpoints that are at respective heights of 3 inches or less, with respect to a top surface of a rail tie to which the inspection assembly is mounted.

Assignments (11)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 28, 2025
From: FOX, THOMAS SAMUEL
To: NORFOLK SOUTHERN CORPORATION
Reel/Frame 071238/0229 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE'S NAME PREVIOUSLY RECORDED AT REEL: 70453 FRAME: 415. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT . Recorded Mar 11, 2025
From: SAMOYLOV, ALEX
To: GEORGIA TECH RESEARCH CORPORATION
Reel/Frame 070478/0285 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: THOMAS, SEAN
To: GEORGIA TECH RESEARCH CORPORATION
Reel/Frame 070457/0519 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: SAMOYLOV, ALEX
To: NORFOLK SOUTHERN CORPORATION
Reel/Frame 070453/0415 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: MANDREKAR, PARTH
To: GEORGIA TECH RESEARCH CORPORATION
Reel/Frame 070454/0061 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: YEAGER, BRIAN THOMAS
To: NORFOLK SOUTHERN CORPORATION
Reel/Frame 070453/0260 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: HOANG, JOHN
To: GEORGIA TECH RESEARCH CORPORATION
Reel/Frame 070454/0032 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: AMOUIE, MABBY NICHOLAS
To: NORFOLK SOUTHERN CORPORATION
Reel/Frame 070452/0311 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: USHER, COLIN
To: GEORGIA TECH RESEARCH CORPORATION
Reel/Frame 070453/0509 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: GEBHARDT, EVAN THOMAS
To: NORFOLK SOUTHERN CORPORATION
Reel/Frame 070452/0426 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2025
From: FOX, THOMAS SAMUEL
To: NORFOLK SOUTHERN CORPORATION
Reel/Frame 070452/0780 →
Continuity (3)
Provisional Application 63582165 · Sep 12, 2023
Provisional Application 63581554 · Sep 8, 2023
Related Publication 20250088760A1 · Mar 13, 2025
References Cited (80)
US 4915504A · Thurston · 1990 [cited by applicant]
US 5793492A · Vanaki · 1998 [cited by examiner]
US 6813581B1 · Snyder · 2004 [cited by examiner]
US 6909514B2 · Nayebi · 2005 [cited by examiner]
US 7681443B2 · Kilian · 2010 [cited by examiner]
US 7714886B2 · Kilian et al. · 2010 [cited by applicant]
US 7715026B2 · Nayebi · 2010 [cited by applicant]
US 8289526B2 · Kilian et al. · 2012 [cited by applicant]
US 8480008B1 · Arnold · 2013 [cited by examiner]
US 8668136B2 · Ahern et al. · 2014 [cited by applicant]
US 8780189B2 · Kilian · 2014 [cited by examiner]
US 8934007B2 · Snead · 2015 [cited by applicant]
US 9033219B2 · Schoner et al. · 2015 [cited by applicant]
US 9073559B2 · Kilian et al. · 2015 [cited by applicant]
US 9129248B2 · Reynolds et al. · 2015 [cited by applicant]
US 9438754B2 · Schoner et al. · 2016 [cited by applicant]
US 9516199B2 · Kilian et al. · 2016 [cited by applicant]
US 9625607B2 · Tudor et al. · 2017 [cited by applicant]
US 9671191B1 · Sullivan · 2017 [cited by examiner]
US 9709394B2 · Schoner et al. · 2017 [cited by applicant]
US 9836893B2 · Chundru et al. · 2017 [cited by applicant]
US 10513279B2 · Mulligan · 2019 [cited by applicant]
US 10523858B1 · Arcaini · 2019 [cited by examiner]
US 10984521B2 · Kohler et al. · 2021 [cited by applicant]
US 11107233B2 · Saniei et al. · 2021 [cited by applicant]
US 11172107B1 · Hoeppner · 2021 [cited by applicant]
US 11235788B2 · Snyder et al. · 2022 [cited by applicant]
US 11285980B2 · Popplewell · 2022 [cited by applicant]
US 11423559B2 · Kohler · 2022 [cited by applicant]
US 11620743B2 · Kohler et al. · 2023 [cited by applicant]
US 11688169B1 · Dryer et al. · 2023 [cited by applicant]
US 11763480B2 · Saniei et al. · 2023 [cited by applicant]
US 11776145B2 · Kohler · 2023 [cited by applicant]
US 11861509B2 · Neal, Jr. et al. · 2024 [cited by applicant]
US 11891098B1 · Smythe et al. · 2024 [cited by applicant]
US 11932290B2 · Davis et al. · 2024 [cited by applicant]
US 11974035B1 · Buschelman · 2024 [cited by applicant]
US 12033312B2 · Kohler et al. · 2024 [cited by applicant]
US 20040263624A1 · Nejikovsky et al. · 2004 [cited by applicant]
US 20050253926A1 · Chung et al. · 2005 [cited by applicant]
US 20060276985A1 · Xu et al. · 2006 [cited by applicant]
US 20070040911A1 · Riley · 2007 [cited by examiner]
US 20100100275A1 · Mian · 2010 [cited by examiner]
US 20120113259A1 · Jie · 2012 [cited by examiner]
US 20130054158A1 · Toms · 2013 [cited by applicant]
US 20160096536A1 · Toms · 2016 [cited by applicant]
US 20170199215A1 · Arcaini · 2017 [cited by examiner]
US 20180222498A1 · Kelley · 2018 [cited by examiner]
US 20180237041A1 · Mesher · 2018 [cited by examiner]
US 20190061791A1 · Yaktine · 2019 [cited by examiner]
US 20190094154A1 · Iler · 2019 [cited by examiner]
US 20190260972A1 · Behety · 2019 [cited by examiner]
US 20200070862A1 · Bilodeau · 2020 [cited by examiner]
US 20200408682A1 · Mian · 2020 [cited by examiner]
US 20210058588A1 · Abreo · 2021 [cited by examiner]
US 20210403060A1 · Pertosa · 2021 [cited by applicant]
US 20220377251A1 · Grata · 2022 [cited by examiner]
US 20230194746A1 · Morton · 2023 [cited by applicant]
US 20230410342A1 · Kohler · 2023 [cited by applicant]
US 20230410354A1 · Saniei et al. · 2023 [cited by applicant]
US 20240004775A1 · Liu · 2024 [cited by applicant]
US 20240035931A1 · Grata · 2024 [cited by applicant]
US 20240043043A1 · Brooks et al. · 2024 [cited by applicant]
US 20240137635A1 · Buschelman · 2024 [cited by applicant]
US 20240236464A9 · Buschelman · 2024 [cited by applicant]
CN 111483496A · 2020 [cited by applicant]
CN 111923962A · 2020 [cited by applicant]
CN 111942434A · 2020 [cited by applicant]
WO 9532581A1 · 1995 [cited by applicant]
WO 2022192962A1 · 2022 [cited by applicant]
WO 2024050200A1 · 2023 [cited by applicant]
WO 2024050201A1 · 2024 [cited by applicant]
WO 2024196402A1 · 2024 [cited by applicant]
Non-Final Office Action For U.S. Appl. No. 18/829,194 dated Nov. 18, 2024, 18 pages. [cited by applicant]
Non-Final Office Action For U.S. Appl. No. 18/829,189 dated Nov. 4, 2024, 18 pages. [cited by applicant]
Chong et al., S.Y. A Review of Health and Operation Monitoring Technologies for Trains, Google Scholar, Smart Structures and Systems, vol. 6, No. 9, 2010, pp. 1079-1105. (Year: 2010). [cited by applicant]
Gao et al., L. Anomaly Detection of Trackside Equipment Based on GPS and Image Matching, IEEE Access, vol. 6, Jan. 2020, pp. 17346-17355. [cited by applicant]
Non-Final Office Action for U.S. Appl. No. 18/829,199, mailed Dec. 27, 2024, 12 Pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 18/829,216 dated Dec. 12, 2024, 2 pages. [cited by applicant]
Qiushi et al., “M. Composite Railway Health Monitoring System based on Fiber Optic Bragg Grating Sensing Array”, IEEE Far East Forum on Nondestructive Evaluation/Testing, Jun. 2014, pp. 259-264. [cited by applicant]