IP Library Granted Patent US 12,246,371
Granted Patent B1
US 12,246,371 · App. 18/829,257 · Granted Mar 11, 2025

Pull tab with raised lift end and associated method

Inventors: Mitchell Everts (Whitefish, MT); Andrew Hogenkamp (Minster, OH)
Assignee: Intellectual Capital Management
B21D51/383
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,246,371
App. No.
18/829,257
Granted
Mar 11, 2025
Kind
B1
Abstract

A progressive die manufacturing method for producing pull tabs with raised lift ends for beverage containers utilizes an ear carry process, producing tab blanks from a carrier sheet fixed by carrier strips at attachment points. At a tab station, blanks are formed into pull tabs with specific features including a nose, rivet receiving portion, lift portion, and preferably a finger hole. A lift station creates deformations elevating the lift portion relative to a highest continuous surface of the pull tab, prior to any deformations or bends. The carrier strips are then cut to release the finished pull tabs. Optional enhancements include an integrated or modular lift station, specific bending angles and distances, and a center bar for indicia application. This method combines the benefits of the ear carry process with improved ergonomics, enhancing user experience while minimizing machinery modifications.

Claims (54)

1. A progressive die manufacturing method of producing a pull tab for opening a beverage container of a type having a frangible region of a container lid and a rivet adjacent the frangible region, comprising steps of:

producing at least one tab blank from a carrier sheet, the at least one tab blank fixed with one or more carrier strips of the carrier sheet at one or more attachment points on the pull tab;

at a tab station, forming the at least one tab blank into the pull tab having a nose configured to apply downward pressure on the frangible region of the container lid, a rivet receiving portion adjacent to the nose that includes a rivet aperture therethrough, and a lift portion disposed distally from the nose and terminating at a distal end of the pull tab, each of the one or more attachment points being proximate the lift portion;

at a lift station, bending the pull tab to create deformations such that the lift portion is elevated relative to a top plane of the pull tab; and

cutting the one or more carrier strips from the one or more attachment points proximate the lift portion of the pull tab to release the pull tab from the carrier sheet.

2. The progressive die manufacturing method of claim 1 further including the step:

at the tab station, when forming the at least one tab blank into the pull tab, forming in the pull tab a finger hole located in proximity to the lift portion.

3. The progressive die manufacturing method of claim 2 further including the step:

at the lift station, bending the pull tab to create deformations at two opposing sides of the finger hole such that the lift portion is elevated above the top plane of the pull tab by a distance to enhance user access and stacking compatibility.

4. The progressive die manufacturing method of claim 2 further including the step:

at the lift station, bending the pull tab to create deformations such that a topmost point of the lift portion is elevated above a bottom plane of the pull tab by a distance not to exceed 6 mm.

5. The progressive die manufacturing method of claim 1 , wherein the lift station is integrated within a conversion press system.

6. The progressive die manufacturing method of claim 1 , wherein the lift station is a modular lift station that can be interchanged with an alternate lift station.

7. The progressive die manufacturing method of claim 1 further including the step:

at the lift station, when bending the pull tab to create the deformations, bending the pull tab upward at an angle to achieve a desired elevation of the lift portion.

8. The progressive die manufacturing method of claim 1 further including the step:

at the lift station, when bending the pull tab to create the deformations, bending the pull tab upward at an angle of between 1 and 80 degrees.

9. The progressive die manufacturing method of claim 1 further including the step:

the lift station creating bends in the pull tab at locations on the lift portion for optimal stacking and user access.

10. The progressive die manufacturing method of claim 1 further including the step:

the lift station creating bends in the pull tab between 1 mm and 10 mm from the distal end of the lift portion of the pull tab.

11. The progressive die manufacturing method of claim 1 further including the steps:

at the tab station, when forming the at least one tab blank into the pull tab, forming a center bar of the pull tab disposed between the nose and the lift portion having a thickness of at least 1.9 mm; and

applying an indicia to the center bar of the pull tab.

12. A progressive die manufacturing method of producing a pull tab for opening a beverage container of a type having a frangible region of a container lid and a rivet adjacent the frangible region, comprising steps of:

producing at least one tab blank from a carrier sheet, the at least one tab blank fixed with the carrier sheet at one or more attachment points on the pull tab;

at a tab station, forming the at least one tab blank into a pull tab having a nose configured to apply downward pressure on the frangible region of the container lid, a rivet receiving portion adjacent to the nose that includes a rivet aperture therethrough, a lift portion disposed distally from the nose and terminating at a distal end of the pull tab, and a finger hole located in proximity to the lift portion, one or more carrier strips fixed with the pull tab at one or more attachment points proximate the finger hole;

the tab station forming a center bar of the pull tab disposed between the nose and the lift portion with a thickness for structural integrity;

at a lift station, bending the pull tab to create deformations that elevate the lift portion relative to a highest continuous surface that runs along a length of the pull tab from the nose to the lift portion; and

cutting the one or more carrier strips from the one or more attachment points of the pull tab to release the pull tab from the carrier sheet.

13. The progressive die manufacturing method of claim 12 further including the step:

at the lift station, bending the pull tab to create the deformations that elevate the lift portion such that the lift portion is elevated above a bottom plane of the pull tab by a distance of 1 mm to 10 mm.

14. The progressive die manufacturing method of claim 12 wherein, at the lift station, when creating bends in the pull tab, each bend at an angle to achieve a desired elevation of the lift portion, the angle being between 1 and 80 degrees.

15. The progressive die manufacturing method of claim 12 wherein, the lift station creates bends in the pull tab between 1 mm and 10 mm from the distal end of the lift portion of the pull tab.

16. The progressive die manufacturing method of claim 12 further including the steps:

moving the carrier sheet and the at least one blank to the tab station;

moving the carrier sheet and pull tabs to the lift station; and

moving the carrier sheet and the pull tabs to a cutting station.

17. A progressive die manufacturing method of manufacturing a pull tab for opening a container of a type having a frangible region of a container lid and a rivet adjacent the frangible region, comprising steps of:

producing at least one tab blank from a carrier sheet, the at least one tab blank fixed with the carrier sheet at one or more attachment points on the pull tab;

moving the carrier sheet and the at least one tab blank through a tab station;

at the tab station, forming the at least one tab blank into the pull tab having a nose configured to apply downward pressure on the frangible region of the container lid, a rivet receiving portion adjacent to the nose that includes a rivet aperture therethrough, a lift portion disposed distally from the nose and terminating at a distal end of the pull tab, and a finger hole located in proximity to the lift portion, the one or more carrier strips fixed with the pull tab at one or more attachment points on the lift portion;

the tab station forming a center bar of the pull tab disposed between the nose and the lift portion with a thickness for structural integrity;

moving the carrier sheet and the pull tabs to a lift station;

at the lift station, bending the pull tab to create deformations that elevate the lift portion relative to a top plane of the pull tab, wherein:

the lift station is integrated within the tab station,

the lift station creates bends in the pull tab, each bend at an angle to achieve a desired elevation of the lift portion, and

the lift station creates bends in the pull tab at a location on the lift portion for optimal stacking and user access;

moving the carrier sheet and the pull tab to a cutting station; and

cutting the one or more carrier strips from the one or more attachment points of the pull tab to release the pull tab from the carrier sheet.

18. The progressive die manufacturing method of claim 17 further including the step:

at the lift station, bending the pull tab to create the deformations that elevate the lift portion such that the lift portion is elevated above the top plane of the pull tab by a distance of 1 mm to 4 mm.

19. The progressive die manufacturing method of claim 17 , wherein the lift station creates the bends in the pull tab, each bend at the angle to achieve the desired elevation of the lift portion, the angle being between 1 and 80 degrees.

20. The progressive die manufacturing method of claim 17 , wherein the lift station creates the bends in the pull tab between 1 mm and 10 mm from the distal end of the lift portion of the pull tab.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 9, 2024
From: EVERTS, MITCHELL; HOGENKAMP, ANDREW
To: INTELLECTUAL CAPITAL MANAGEMENT
Reel/Frame 068533/0069 →
Continuity (1)
Provisional Application 63537633 · Sep 11, 2023
References Cited (36)
US 3313446A · Harvey · 1967 [cited by applicant]
US 3437229A · Khoury · 1969 [cited by applicant]
US 3863801A · Pillnik · 1975 [cited by applicant]
US 3923193A · Wells · 1975 [cited by applicant]
US 3938696A · Herbst · 1976 [cited by applicant]
US 3967752A · Cudzik · 1976 [cited by applicant]
US 5699928A · Chung · 1997 [cited by applicant]
US D432015S · Holiday · 2000 [cited by applicant]
US D579771S · Cherian · 2008 [cited by applicant]
US 7617945B2 · Cherian · 2009 [cited by applicant]
US 8733576B2 · Jeon · 2014 [cited by applicant]
US 9511411B2 · Tielbeke · 2016 [cited by applicant]
US 10710766B2 · Tashiro · 2020 [cited by applicant]
US 20050039314A1 · Dickie · 2005 [cited by examiner]
US 20050224497A1 · Wook · 2005 [cited by applicant]
US 20060163254A1 · Wichelhaus · 2006 [cited by applicant]
US 20080173646A1 · Wang · 2008 [cited by applicant]
US 20100326281A1 · Nishibe et al. · 2010 [cited by applicant]
US 20110253719A1 · Cherian · 2011 [cited by applicant]
US 20120273492A1 · Werth et al. · 2012 [cited by applicant]
US 20130075401A1 · Forrest · 2013 [cited by examiner]
US 20150239607A1 · Fields · 2015 [cited by applicant]
US 20180099777A1 · Cohen Bissu · 2018 [cited by applicant]
US 20210300621A1 · Ohkoshi · 2021 [cited by applicant]
US 20230150722A1 · Chiji · 2023 [cited by examiner]
CN 101522534B · 2009 [cited by applicant]
CN 204210862U · 2015 [cited by applicant]
JP 2001199441A · 2001 [cited by applicant]
KR 19990008275U · 1999 [cited by applicant]
KR 200174367Y1 · 2000 [cited by applicant]
KR 200307673Y1 · 2003 [cited by applicant]
KR 200382944Y1 · 2005 [cited by applicant]
KR 100487015B1 · 2005 [cited by applicant]
KR 20120138405A · 2012 [cited by applicant]
KR 20150001607U · 2015 [cited by applicant]
KR 20160020948A · 2016 [cited by applicant]
Cited By (3)
US 1,095,230 US 1,100,658 US 12,409,972