IP Library › Patent Application 19303059
Patent Application
App. No. 19/303,059

HIERARCHICAL DISTRIBUTED CONTROL OF DISTRIBUTED ENERGY RESOURCES (DERS)

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
19/303,059
Abstract

Techniques for allocating a load capacity to on-site smart sensors coupled to distributed energy resources (DERs) are described herein. For example, a primary smart sensor may receive, from a utility supplier (e.g., which may include a substation), a maximum load constraint associated with a network of smart utility sensors in an autonomous routing area. The maximum load constraint may be a maximum load and/or maximum capacity that the network of smart utility sensors may collectively operate with by a transformer carrying the load. In some examples, the primary smart sensor may receive utility data from the smart sensors and may determine a total transformer load associated with the transformer that is providing power to the network of smart utility sensors based at least in part on the utility data.

Claims (83)

1 . A method comprising:

receiving, from a substation, a maximum load constraint associated with a network of smart utility meters;

receiving utility data from a plurality of smart utility meters within the network of smart utility meters;

determining a total transformer load associated with a transformer based at least in part on the utility data;

determining a remaining transformer capacity associated with the transformer based at least in part on the maximum load constraint and the total transformer load;

determining an allocated capacity for individual ones of the plurality of smart utility meters based at least in part on the remaining transformer capacity; and

sending the allocated capacity to the individual ones of the plurality of smart utility meters.

2 . The method of claim 1 , wherein the allocated capacity causes the individual ones of the plurality of smart utility meters to:

reduce a charging load of an electric vehicle supply equipment (EVSE); or

increase the charging load of the EVSE.

3 . The method of claim 1 , wherein receiving the utility data includes receiving data associated with at least one of:

electricity metering devices associated with the network of smart utility meters,

a distributed generation system,

electric vehicle (EV) telematics of an EV connected to an electrical grid, or

an EV supply equipment (EVSE) associated with the electrical grid.

4 . The method of claim 1 , further comprising receiving utility data that includes at least one of:

present electricity consumption data associated with the network of smart utility meters,

historical electricity consumption data associated with the network of smart utility meters,

present electricity generation data associated with a distributed generation system, or

historical electricity generation data associated with the network of smart utility meters.

5 . The method of claim 1 , wherein the maximum load constraint is based at least in part on at least one of a temperature associated with the transformer, cooling methods associated with the transformer, voltage regulation associated with the transformer, core saturation associated with the transformer, a load type, a short-circuit current associated with the transformer, or safety standards.

6 . The method of claim 1 , wherein determining the remaining transformer capacity associated with the transformer includes determining a delta value between the total transformer load and the maximum load constraint and determining if the delta value is above or below a threshold value.

7 . The method of claim 6 , further comprising:

in response to the transformer capacity being above the threshold value, increasing a charging load of an electric vehicle supply equipment (EVSE); or

in response to the transformer capacity being below the threshold value, reducing a charging load of the EVSE.

8 . A smart utility meter comprising:

at least one processor; and

memory storing instructions that cause the at least one processor to perform operations comprising:

receiving, from a substation, a maximum load constraint associated with a network of smart utility meters;

receiving utility data from a plurality of additional smart utility meters within the network of smart utility meters;

determining a total transformer load associated with a transformer based at least in part on the utility data;

determining a remaining transformer capacity associated with the transformer based at least in part on the maximum load constraint and the total transformer load;

determining an allocated capacity for individual ones of the plurality of smart utility meters based at least in part on the remaining transformer capacity; and

sending the allocated capacity to the individual ones of the plurality of additional smart utility meters.

9 . The smart utility meter of claim 8 , wherein the allocated capacity causes the individual ones of the plurality of smart utility meters to:

reduce a charging load of an electric vehicle supply equipment (EVSE); or

increase the charging load of the EVSE.

10 . The smart utility meter of claim 8 , wherein receiving the utility data includes receiving data associated with at least one of:

electricity metering devices associated with the network of smart utility meters,

a distributed generation system,

electric vehicle (EV) telematics of an EV connected to an electrical grid, or

an EV supply equipment (EVSE) associated with the electrical grid.

11 . The smart utility meter of claim 8 , the operations further comprising receiving utility data that includes at least one of:

present electricity consumption data associated with the network of smart utility meters,

historical electricity consumption data associated with the network of smart utility meters,

present electricity generation data associated with a distributed generation system, or

historical electricity generation data associated with the network of smart utility meters.

12 . The smart utility meter of claim 8 , wherein the maximum load constraint is based at least in part on at least one of: a temperature associated with the transformer, cooling methods associated with the transformer, voltage regulation associated with the transformer, core saturation associated with the transformer, a load type, a short-circuit current associated with the transformer, or safety standards.

13 . The smart utility meter of claim 8 , wherein determining the remaining transformer capacity associated with the transformer includes determining a delta value between the total transformer load and the maximum load constraint and determining if the delta value is above or below a threshold value.

14 . The smart utility meter of claim 13 , the operations further comprising:

in response to the transformer capacity being above the threshold value, increasing a charging load of an electric vehicle supply equipment (EVSE); or

in response to the transformer capacity being below the threshold value, reducing a charging load of the EVSE.

15 . A utility network system comprising:

a substation configured to determine a maximum load constraint associated with a network of smart utility meters;

a primary smart utility meter configured to:

receive, from the substation, the maximum load constraint;

receive utility data from a plurality of smart utility meters within the network of smart utility meters;

determine a total transformer load associated with a transformer based at least in part on the utility data;

determine a remaining transformer capacity associated with the transformer based at least in part on the maximum load constraint and the total transformer load;

determine an allocated capacity for individual ones of the plurality of smart utility meters based at least in part on the remaining transformer capacity; and

send the allocated capacity to the individual ones of the plurality of smart utility meters; and

at least one smart utility meter of the plurality of smart utility meters configured to:

receive the allocated capacity; and

perform an action based on the allocated capacity.

16 . The utility network system of claim 15 , wherein the action comprises adjusting a load capacity of a distributed energy resource (DER).

17 . The utility network system of claim 15 , wherein the action comprises:

reducing a charging load of an electric vehicle supply equipment (EVSE); or

increasing the charging load of the EVSE.

18 . The utility network system of claim 15 , wherein receiving the utility data includes receiving data associated with at least one of:

electricity metering devices associated with the network of smart utility meters,

a distributed generation system,

electric vehicle (EV) telematics of an EV connected to an electrical grid, or

an EV supply equipment (EVSE) associated with the electrical grid.

19 . The utility network system of claim 15 , further comprising receiving utility data that includes at least one of:

present electricity consumption data associated with the network of smart utility meters,

historical electricity consumption data associated with the network of smart utility meters,

present electricity generation data associated with a distributed generation system, or

historical electricity generation data associated with the network of smart utility meters.

20 . The utility network system of claim 15 , wherein the maximum load constraint is based at least in part on at least one of a temperature associated with the transformer, cooling methods associated with the transformer, voltage regulation associated with the transformer, core saturation associated with the transformer, a load type, a short-circuit current associated with the transformer, or safety standards.

21 . The utility network system of claim 15 , wherein determining the remaining transformer capacity associated with the transformer includes determining a delta value between the total transformer load and the maximum load constraint and determining if the delta value is above or below a threshold value.

22 . The utility network system of claim 15 , the operations further comprising:

in response to the transformer capacity being above the threshold value, increasing a charging load of an electric vehicle supply equipment (EVSE); or

in response to the transformer capacity being below the threshold value, reducing a charging load of the EVSE.