IP Library Granted Patent US 7,254,121
Granted Patent B2
US 7,254,121 · App. 10/341,341 · Granted Aug 7, 2007

System and method of controlling assignment of a call on a reverse supplemental channel in a mobile communication system

Assignee: Samsung Electronics Co., Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,254,121
App. No.
10/341,341
Granted
Aug 7, 2007
Kind
B2
Abstract

A system and method for supplemental channel (SCH) assignment control in a Code Division Multiple Access (CDMA) mobile communication system. Upon request of a Mobile Station (MS) for a SCH, a maximum available data rate is determined which is less than a predetermined data threshold. The MS is notified of the determined maximum data rate. Thus, the SCH is assigned to the MS.

Claims (88)

1. A method of assigning a call to a mobile station (MS) on a reverse supplemental channel (R-SCH) in a Code Division Multiple Access (CDMA) mobile communication system where a base station (BS) having a cell divided into a plurality of sectors and a plurality of MSs is located in each sector, the method comprising the steps of:

comparing a total load of a sector in which the MS is located to a predetermined data threshold, upon request of the MS for an R-SCH;

determining a maximum data rate available to the R-SCH which is less than the data threshold if the total load of the sector is less than the data threshold; and

notifying the MS of the determined maximum data rate.

2. The method of claim 1 , further comprising the steps of:

determining whether the data rate of the R-SCH is to be changed in every predetermined period after the R-SCH is assigned to the MS;

determining a maximum data rate available to the R-SCH which is less than the data threshold if the data rate of the R-SCH is to be changed; and

notifying the MS of the determined maximum data rate.

3. The method of claim 2 , wherein the determining step comprises the steps of:

decreasing the data rate of the R-SCH in order to decrease the total load of the sector to be less than the data threshold, if the total load of the sector is greater than the data threshold; and

increasing the data rate of the R-SCH to the maximum available data rate which is less than the data threshold if the data rate of the R-SCH is not the maximum data rate and the total load of the sector is less than the data threshold.

4. The method of claim 1 , wherein upon request for a voice call, the voice call is assigned within the maximum reverse load of the BS.

5. The method of claim 1 , further comprising the steps of:

calculating a maximum data rate available to the R-SCH in each of at least one of sectors and base transceiver stations (BTSs) communicating with the MS, if the MS handoffs with the R-SCH assigned;

selecting the lowest of the maximum data rates as the data rate of the R-SCH; and

notifying the MS of the selected data rate as the data rate of the R-SCH.

6. The method of claim 1 , wherein a different available maximum data rate is set according to the distance between the MS and the BS.

7. The method of claim 1 , further comprising the steps of:

calculating an available maximum data rate for the R-SCH in each of BTSs communicating with the MS via a BSC (Base Station Controller), if the MS handoffs between the BTSs with the R-SCH assigned;

selecting the lowest of the maximum data rates as the data rate of the R-SCH;

notifying the BTSs of the selected data rate as the data rate of the R-SCH by the BSC; and

notifying the MS of the selected data rate as the data rate of the R-SCH for each of the BTSs.

8. A method of assigning a call to a mobile station (MS) on a reverse supplemental channel (R-SCH) in a CDMA Code Division Multiple Access (CDMA) mobile communication system where a base station (BS) having a cell divided into a plurality of sectors and a plurality of MSs is located in each of the sectors, the method comprising the steps of:

determining a maximum data rate available to the R-SCH in each one of the sectors and base transceiver stations (BTSs) communicating with the MS, upon request of the MS for the R-SCH at handoff;

selecting the lowest of the maximum data rates from the sectors or BTSs; and

notifying the MS of the selected data rate.

9. The method of claim 8 , further comprising the steps of:

determining whether the data rate of the R-SCH is to be changed in every predetermined period after the R-SCH is assigned to the MS;

changing the data rate of the R-SCH if the data rate of the R-SCH can be changed; and

notifying the MS of the changed data rate.

10. The method of claim 9 , wherein the determining step comprises the steps of:

decreasing the data rate of the R-SCH in order to decrease the total load of the sector below a predetermined data threshold, if the total load of the sector is greater than the data threshold; and

increasing the data rate of the R-SCH to a maximum available data rate which is less than the data threshold if the data rate of the R-SCH is not a maximum data rate and the total load of the sector is less than the data threshold.

11. The method of claim 8 , wherein a different maximum data rate is set according to the distance between the MS and the BS.

12. The method of claim 8 , further comprising the steps of:

calculating a maximum data rate available to the R-SCH in each one of the BTSs communicating with the MS via a Base Station Controller (BSC), if the MS handoffs between the BTSs when the R-SCH is assigned;

calculating maximum data rates available to the R-SCH;

providing the calculated data rates to the BSC via the BTSs; and

notifying the MS of a data rate received from the BSC as the data rate of the R-SCH by the BTSs.

13. The method of claim 12 , further comprising the step of:

selecting the lowest of the data rates received from the BTSs; and

notifying the BTSs of the selected data rate as the data rate of the R-SCH by the BSC.

14. A system for assigning a call on a reverse supplemental channel in a communication system, said system comprising:

a Mobile Station (MS), a Base Station (BS) having a cell divided into a plurality of sectors, a plurality of MSs disposed within each of said sectors, a Base Transceiver Stations (BTs) and a Base Station Controller;

said BS is adapted to perform the following operations:

compare a total load of a sector in which the MS is located to a predetermined data threshold, upon request of the MS for an R-SCH;

determine a maximum data rate available to the R-SCH which is less than the data threshold if the total load of the sector is less than the data threshold; and

notify the MS of the determined maximum data rate.

15. The system of claim 14 , wherein the BS is further adapted to perform the operations of:

determine whether the data rate of the R-SCH is to be changed in every predetermined period after the R-SCH is assigned to the MS;

determine a maximum data rate available to the R-SCH which is less than the data threshold if the data rate of the R-SCH is to be changed; and

notify the MS of the determined maximum data rate.

16. The system of claim 15 , wherein to determine whether the data rate of the R-SCH is to be changed in every predetermined period after the R-SCH is assigned to the MS, the BS is further adapted to perform the operations of:

decrease the data rate of the R-SCH in order to decrease the total load of the sector to be less than the data threshold, if the total load of the sector is greater than the data threshold; and

increase the data rate of the R-SCH to the maximum available data rate which is less than the data threshold if the data rate of the R-SCH is not the maximum data rate and the total load of the sector is less than the data threshold.

17. The system of claim 14 , wherein the BS is further adapted to perform the operations of: upon request for a voice call, assign the voice call within the maximum reverse load of the BS.

18. The system of claim 14 , wherein the BS is further adapted to perform the operations of:

calculate a maximum data rate available to the R-SCH in each of at least one of the sectors and BTSs communicating with the MS, if the MS handoffs with the R-SCH assigned;

select the lowest of the maximum data rates as the data rate of the R-SCH; and

notify the MS of the selected data rate as the data rate of the R-SCH.

19. The system of claim 14 , wherein the BS is further adapted to perform the operation of set a different available maximum data rate according to the distance between the MS and the BS.

20. The system of claim 14 , wherein the BS is further adapted to perform the operations of:

calculate an available maximum data rate for the R-SCH in each of the BTSs communicating with the MS via a BSC, if the MS handoffs between the BTSs with the R-SCH assigned;

select the lowest of the maximum data rates as the data rate of the R-SCH;

notify the BTSs of the selected data rate as the data rate of the R-SCH by the BSC; and

notify the MS of the selected data rate as the data rate of the R-SCH for each of the BTSs.

21. A system for assigning a call on a reverse supplemental channel in a communication system, said system comprising:

a Mobile Station (MS), a Base Station (BS) having a cell divided into a plurality of sectors, a plurality of MSs disposed within each of said sectors, a Base Transceiver Stations (BTs) and a Base Station Controller;

said BS is adapted to perform the following operations:

determine a maximum data rate available to the R-SCH in each one of the sectors and BTSs communicating with the MS, upon request of the MS for the R-SCH at handoff;

select the lowest of the maximum data rates from the sectors or BTSs; and

notify the MS of the selected data rate.

22. The system of claim 21 , wherein the BS is further adapted to perform the operations of:

determine whether the data rate of the R-SCH is to be changed in every predetermined period after the R-SCH is assigned to the MS;

change the data rate of the R-SCH if the data rate of the R-SCH can be changed; and

notify the MS of the changed data rate.

23. The system of claim 22 , wherein to determine whether the data rate of the R-SCH is to be changed in every predetermined period after the R-SCH is assigned to the MS the BS is further adapted to perform the operations of:

decrease the data rate of the R-SCH in order to decrease the total load of the sector below a predetermined data threshold, if the total load of the sector is greater than the data threshold; and

increase the data rate of the R-SCH to a maximum available data rate which is less than the data threshold if the data rate of the R-SCH is not a maximum data rate and the total load of the sector is less than the data threshold.

24. The system of claim 21 , wherein the BS is further adapted to perform the operation of set a different maximum data rate according to the distance between the MS and the BS.

25. The system of claim 21 , wherein the BS is further adapted to perform the operations of:

calculate a maximum data rate available to the R-SCH in each one of the BTSs communicating with the MS via the BSC, if the MS handoffs between the BTSs when the R-SCH is assigned;

calculate maximum data rates available to the R-SCH;

provide the calculated data rates to the BSC via the BTSs; and

notify the MS of a data rate received from the BSC as the data rate of the R-SCH by the BTSs.

26. The system of claim 25 , wherein the BS is further adapted to perform the operations of:

select the lowest of the data rates received from the BTSs; and

notify the BTSs of the selected data rate as the data rate of the R-SCH by the BSC.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2003
From: KIM, TAI-SUK; LEE, JUN-SANG; HONG, KI-SEOB
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 013661/0516 →
Priority Claims (1)
KR 10-2002-0002084 · Jan 14, 2002 · national
Continuity (1)
Related Publication 20030133415A1 · Jul 17, 2003