IP Library Granted Patent US 7,333,880
Granted Patent B2
US 7,333,880 · App. 11/208,029 · Granted Feb 19, 2008

Aggregation of distributed energy resources

Assignee: EnerNOC, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,333,880
App. No.
11/208,029
Granted
Feb 19, 2008
Kind
B2
Abstract

A method and system for controlling distributed energy resources is provided. Notification of an upcoming regional power distribution event is received and a distributed energy resource affected by the upcoming event is determined or identified. A first notification message is sent to an affected distributed energy resource asset owner or other administrator to notify the distributed energy resource asset of the event. An event data process is initiated to monitor and collect data associated with the event and an event control process is initiated to control one or more affected distributed energy resource asset during the event. The event control process and the event data process are terminated at the end of the event.

Claims (18)

1. A method for controlling distributed energy resources, the method comprising:

receiving notification of an upcoming regional power distribution event;

determining a distributed energy resource affected by the upcoming event;

determining an optimal control threshold for controlling an affected distributed energy resource asset using facility conditions and/or electric grid conditions;

sending a first notification message to an affected distributed energy resource asset administrator to notify the distributed energy resource asset administrator of the event;

in response to the first notification message, initiating an event data process to monitor and collect data associated with the event and initiating an event control process utilizing the optimal control threshold to control the affected distributed energy resource asset during the event;

terminating the event control process at the end of the event; and

terminating the event data process.

2. A method according to claim 1 , wherein the receiving notification of an upcoming regional power distribution event includes receiving a request to reduce demand of electricity from the electric power distribution grid.

3. A method according to claim 2 , wherein the receiving a request to reduce demand of electricity from the electric power distribution grid includes receiving a request to reduce demand of electricity from the electric power distribution grid according to a predefined program.

4. A method according to claim 3 , wherein the predefined program identifies one or more distributed energy resource assets available to respond to the event.

5. A method according to claim 1 , further comprising sending a second notification message to the distributed energy resource asset administrator, the second notification message identifying distributed energy resource assets affected by the event.

6. A method according to claim 5 , wherein the second notification message provides means by which the distributed energy resource asset may opt to be excluded or included in the event.

7. A method according to claim 5 , wherein the second notification message is sent based on the site configuration of the distributed energy resource asset.

8. A method according to claim 1 , wherein sending a first notification message to an affected distributed energy resource asset administrator to notify the distributed energy resource asset administrator of the event initiates a first event timer which stops timing when the event starts.

9. A method according to claim 8 , wherein a second event timer is initiated when the first event timer stops timing, and the second event timer stops timing upon receipt of an event termination signal.

10. A method according to claim 1 , further comprising verifying data transfers associated with the regional power distribution event.

11. A method according to claim 1 , further comprising confirming states associated with affected distributed energy resource assets.

Assignments (5)
CHANGE OF NAME Recorded Oct 17, 2018
From: ENERNOC, INC.
To: ENEL X NORTH AMERICA, INC.
Reel/Frame 047687/0210 →
SECURITY AGREEMENT Recorded May 10, 2013
From: ENERNOC, INC.
To: SILICON VALLEY BANK, SUITE 2-200
Reel/Frame 030391/0918 →
SECURITY AGREEMENT Recorded Jan 27, 2012
From: ENERNOC, INC.; ENOC SECURITIES CORPORATION
To: SILICON VALLEY BANK, AS ADMINISTRATIVE AGENT
Reel/Frame 027607/0956 →
SECURITY AGREEMENT Recorded Apr 15, 2011
From: ENOC SECURITIES CORPORATION; ENERNOC, INC.
To: SILICON VALLEY BANK
Reel/Frame 026138/0809 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 8, 2005
From: BREWSTER, DAVID B.; HEALY, TIMOTHY G.
To: ENERNOC, INC.
Reel/Frame 016751/0673 →
Continuity (2)
Continuation In Part 1031492000 · Dec 9, 2002
Related Publication 20060047369A1 · Mar 2, 2006