IP Library Granted Patent US 7,584,795
Granted Patent B2
US 7,584,795 · App. 11/409,724 · Granted Sep 8, 2009

Sealed branch wellbore transition joint

Assignee: Halliburton Energy Services, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,584,795
App. No.
11/409,724
Granted
Sep 8, 2009
Kind
B2
Abstract

A sealed branch wellbore transition joint. A method of completing a well having intersecting wellbores includes the steps of: positioning a diverter in a wellbore; diverting an assembly from the wellbore into another wellbore; and swelling a sealing material on the assembly, so that a seal is formed between the assembly and the diverter. A completion system for a well having intersecting wellbores includes a diverter positioned in a wellbore, an assembly extending laterally across the wellbore, and a sealing material on the assembly. The sealing material is swollen so that a seal is formed between the assembly and the diverter.

Claims (26)

1. A method of completing a well having first and second intersecting wellbores, the method comprising the steps of:

positioning a diverter in the first wellbore;

diverting an assembly from the first wellbore into the second wellbore; and

swelling a sealing material on the assembly, so that a first seal is formed between the assembly and the diverter.

2. The method of claim 1 , wherein the swelling step further comprises increasing a volume of the sealing material.

3. The method of claim 1 , wherein the diverting step further comprises positioning the assembly at least partially in the first wellbore and at least partially in the second wellbore.

4. The method of claim 1 , further comprising the step of expanding the assembly.

5. The method of claim 1 , wherein the expanding step is performed prior to the swelling step.

6. The method of claim 1 , further comprising the step of providing fluid communication between an interior of the assembly and the first wellbore via an opening formed through a sidewall of the assembly.

7. The method of claim 1 , wherein the swelling step further comprises forming a second seal between the assembly and the first wellbore.

8. The method of claim 1 , wherein the swelling step further comprises forming a second seal between the assembly and a window from the first wellbore to the second wellbore.

9. The method of claim 1 , further comprising the step of swelling a second seal between the diverter and the first wellbore.

10. The method of claim 1 , wherein the swelling step further comprises swelling the sealing material in response to exposing the sealing material to hydrocarbon fluid in the well.

11. The method of claim 1 , wherein the swelling step further comprises swelling the sealing material in response to exposing the sealing material to water in the well.

12. A completion system for a well having intersecting first and second wellbores, the system comprising:

a diverter positioned in the first wellbore;

an assembly extending laterally across the first wellbore; and

a sealing material on the assembly, the sealing material being swollen so that a first seal is formed between the assembly and the diverter.

13. The system of claim 12 , wherein the sealing material is swollen by increasing a volume of the sealing material.

14. The system of claim 12 , wherein the assembly is positioned at least partially in the first wellbore and at least partially in the second wellbore.

15. The system of claim 12 , wherein the assembly is expanded radially outward in the well.

16. The system of claim 12 , wherein an opening provides fluid communication between an interior of the assembly and the first wellbore through a sidewall of the assembly.

17. The system of claim 12 , further comprising a second seal formed by the swollen sealing material between the assembly and the first wellbore.

18. The system of claim 12 , further comprising a second seal formed by the swollen sealing material between the assembly and a window from the first wellbore to the second wellbore.

19. The system of claim 12 , further comprising a second seal formed by the swollen sealing material between the diverter and the first wellbore.

20. The system of claim 12 , wherein the sealing material is swollen in response to exposing the sealing material to at least one of hydrocarbon fluid and water in the well.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2006
From: HEPBURN, NEIL; BERGE, FRODE; DEMONG, KARL
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 018019/0635 →
Continuity (2)
Continuation In Part 1076765600 · Jan 29, 2004
Related Publication 20060266531A1 · Nov 30, 2006