IP Library Granted Patent US 7,853,346
Granted Patent B2
US 7,853,346 · App. 12/214,917 · Granted Dec 14, 2010

Method of real-time scheduling of processes at distributed manufacturing sites

Assignee: Siemens Aktiengesellschaft
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,853,346
App. No.
12/214,917
Granted
Dec 14, 2010
Kind
B2
Abstract

In a method of scheduling of processes at distributed and interacting manufacturing sites, a potential availability of predictive pairings of materials and work machines processing the materials over a predetermined period of time is determined for a plurality of manufacturing sites. The potential availability data of the predictive pairings is recorded. The method senses what materials and work machines are available in real-time, and records the real-time availability data of sensed materials and work machines. The real-time availability data is compared with the potential availability data of predictive pairings. In case of a discrepancy, the method determines for each manufacturing site local pairings of materials and work machines processing the materials, and processes the local pairings.

Claims (38)

1. A method of scheduling of processes at distributed and interacting manufacturing sites, comprising:

determining a potential availability of predictive pairings of materials and work machines processing said materials over a predetermined period of time for a plurality of manufacturing sites;

recording the potential availability data of said predictive pairings;

sensing what materials and work machines are available in real-time;

recording real-time availability data of sensed materials and work machines;

comparing the real-time availability data of sensed materials and work machines with the potential availability data of predictive pairings;

in case of a discrepancy, determining for each manufacturing site local pairings of materials and work machines processing said materials,

processing said local pairings;

recording observations as observation data, and using said observation data locally as real-time availability data of the sensed materials and work machines;

transmitting the observation data from an observing manufacturing site to at least one of a server and other manufacturing sites;

transmitting the observation data to potentially affected manufacturing sites; and

predefining for each observation data at each manufacturing site a list of potentially affected manufacturing sites, storing said list at the observing manufacturing site, and transmitting the observation data according to the list.

2. The method of claim 1 , the observation data includes one of a start of a process, an end of a process, a shortage of a product/material/component, a delay of material delivery, a delay of a process, a change of a manufacturing due date, a new order, an order is cancelled, a break down of a work machine, and a bad quality of a product.

3. The method of claim 1 , wherein an observation is made with statistical relevance and recorded as observation data.

4. A computer-readable storage medium having stored thereon an information processing program for scheduling processes at distributed and interacting manufacturing sites to be executed on a computer, the program comprising:

determining a potential availability of predictive pairings of materials and work machines processing said materials over a predetermined period of time for a plurality of manufacturing sites;

recording the potential availability data of said predictive pairings;

sensing what materials and work machines are available in real-time;

recording real-time availability data of sensed materials and work machines;

comparing the real-time availability data of sensed materials and work machines with the potential availability data of predictive pairings;

in case of a discrepancy, determining for each manufacturing site local pairings of materials and work machines processing said materials,

processing said local pairings;

recording observations as observation data, and using said observation data locally as real-time availability data of the sensed materials and work machines;

transmitting the observation data from an observing manufacturing site to at least one of a server and other manufacturing sites;

transmitting the observation data to potentially affected manufacturing sites; and

predefining for each observation data at each manufacturing site a list of potentially affected manufacturing sites, storing said list at the observing manufacturing site, and transmitting the observation data according to the list.

5. A computer program product for scheduling processes at distributed and interacting manufacturing sites, the computer program product being embodied in a computer readable medium and comprising computer instructions for:

determining a potential availability of predictive pairings of materials and work machines processing said materials over a predetermined period of time for a plurality of manufacturing sites;

recording the potential availability data of said predictive pairings;

sensing what materials and work machines are available in real-time;

recording real-time availability data of sensed materials and work machines;

comparing the real-time availability data of sensed materials and work machines with the potential availability data of predictive pairings;

in case of a discrepancy, determining for each manufacturing site local pairings of materials and work machines processing said materials,

processing said local pairings;

recording observations as observation data, and using said observation data locally as real-time availability data of the sensed materials and work machines;

transmitting the observation data from an observing manufacturing site to at least one of a server and other manufacturing sites;

transmitting the observation data to potentially affected manufacturing sites; and

predefining for each observation data at each manufacturing site a list of potentially affected manufacturing sites, storing said list at the observing manufacturing site, and transmitting the observation data according to the list.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 4, 2010
From: RUGGIERI, VITO MASSIMO
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 025312/0891 →
Priority Claims (1)
EP 07012779 · Jun 29, 2007 · regional
Continuity (1)
Related Publication 20090012641A1 · Jan 8, 2009