IP Library Granted Patent US 8,139,382
Granted Patent B2
US 8,139,382 · App. 12/456,777 · Granted Mar 20, 2012

System and method for integrating local maximum power point tracking into an energy generating system having centralized maximum power point tracking

Assignee: National Semiconductor Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,139,382
App. No.
12/456,777
Granted
Mar 20, 2012
Kind
B2
Abstract

A system for integrating local maximum power point tracking (MPPT) into an energy generating system having centralized MPPT is provided. The system includes a system control loop and a plurality of local control loops. The system control loop comprises a system operating frequency, and each local control loop comprises a corresponding local operating frequency. Each of the local operating frequencies is spaced apart from the system operating frequency by at least a predefined distance. For a particular embodiment, a settling time corresponding to the local operating frequency of each local control loop is at least five times faster than a time constant corresponding to the system operating frequency.

Claims (26)

1. A system for integrating local maximum power point tracking (MPPT) into an energy generating system having centralized MPPT, comprising:

a system control loop comprising a system operating frequency; and

a plurality of local control loops, each local control loop comprising a corresponding local operating frequency, wherein each of the local operating frequencies is spaced apart from the system operating frequency by at least a predefined distance.

2. The system of claim 1 , wherein the system control loop comprises a closed-loop system and each of the local control loops comprises a closed-loop system.

3. The system of claim 1 , wherein the system control loop comprises an array of energy generating devices and a DC-AC converter comprising a central MPPT control block configured to provide MPPT for the array.

4. The system of claim 1 , wherein each local control loop comprises an energy generating device and a local converter configured to provide MPPT for the energy generating device.

5. The system of claim 1 , wherein the system operating frequency comprises a corresponding time constant for the system control loop.

6. The system of claim 5 , wherein each of the local operating frequencies comprises a corresponding settling time for the local control loop that corresponds to that local operating frequency.

7. The system of claim 6 , wherein the settling time of each local control loop is faster than the time constant for the system control loop.

8. The system of claim 6 , wherein the settling time of each local control loop is at least five times faster than the time constant for the system control loop.

9. A system for integrating local maximum power point tracking (MPPT) into an energy generating system having centralized MPPT, comprising:

a system control loop comprising an array of energy generating devices and a DC-AC converter comprising a central MPPT control block configured to provide MPPT for the array, wherein the system control loop is configured to operate based on a system operating frequency; and

a plurality of local control loops, each local control loop comprising one of the energy generating devices and a local converter configured to provide MPPT for the energy generating device, wherein each of the local control loops is configured to operate based on a corresponding local operating frequency, and wherein each of the local operating frequencies is spaced apart from the system operating frequency by at least a predefined distance.

10. The system of claim 9 , wherein the system control loop comprises a closed-loop system and each of the local control loops comprises a closed-loop system.

11. The system of claim 9 , wherein the system operating frequency comprises a corresponding time constant for the system control loop.

12. The system of claim 11 , wherein each of the local operating frequencies comprises a corresponding settling time for the local control loop that corresponds to that local operating frequency.

13. The system of claim 12 , wherein the settling time of each local control loop is faster than the time constant for the system control loop.

14. The system of claim 12 , wherein the settling time of each local control loop is at least five times faster than the time constant for the system control loop.

15. A method for integrating local maximum power point tracking (MPPT) into an energy generating system having centralized MPPT, comprising:

providing a system control loop comprising a system operating frequency; and

providing a plurality of local control loops, each local control loop comprising a corresponding local operating frequency, wherein each of the local operating frequencies is spaced apart from the system operating frequency by at least a predefined distance.

16. The method of claim 15 , wherein the system operating frequency comprises a corresponding time constant for the system control loop.

17. The method of claim 16 , wherein each of the local operating frequencies comprises a corresponding settling time for the local control loop that corresponds to that local operating frequency.

18. The method of claim 17 , wherein the settling time of each local control loop is faster than the time constant for the system control loop.

19. The method of claim 17 , wherein the settling time of each local control loop is at least five times faster than the time constant for the system control loop.

20. The method of claim 15 , wherein the system control loop comprises an array of energy generating devices and a DC-AC converter comprising a central MPPT control block configured to provide MPPT for the array, and wherein each local control loop comprises one of the energy generating devices and a local converter configured to provide MPPT for the energy generating device.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 23, 2009
From: ZHANG, JIANHUI; DJABBARI, ALI; LISI, GIANPAOLO
To: NATIONAL SEMICONDUCTOR CORPORATION
Reel/Frame 022911/0689 →
Continuity (3)
Continuation In Part 12152491 · May 14, 2008
Provisional Application 61170578 · Apr 17, 2009
Related Publication 20090284078A1 · Nov 19, 2009